This document was prepared in cooperation with the Massachusetts Department of Transportation and the U.S. Department of Transportation. (under Contract # 108056 with MassDOT) The views and opinions of the Merrimack Valley Planning Commission expressed herein do not necessarily state or reflect those of the Massachusetts
Department of Transportation or the U.S. Department of Transportation.
Final FFYs 2021-2025 MVMPO TIP May 2020
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020
Title VI Notice to Beneficiaries .......................................................................................... 1
Endorsement Page for Federal TIP - Signatures .............................................................. 5
Certification of the Merrimack Valley MPO Transportation Planning Process ................... 7
310 CMR 60.05: Global Warming Solutions Act – Signatures .......................................... 9
Part A. Introduction ................................................................................................... 11
Part A. 1. TIP Development Process.............................................................................. 11
Part A. 2. Performance Measures .................................................................................. 14
Part A. 3. Prioritization ................................................................................................... 41
Part A. 4. Public Participation......................................................................................... 54
Public Participation Plan Stakeholder List..................................................... 55
Part A. 5. Amendment/ Adjustment Procedures............................................................. 61
Part A. 6. High Priority Projects...................................................................................... 63
Part A. 7. Advance Construction .................................................................................... 65
Part A. 8. Transportation Funding Programs.................................................................. 66
Highway Projects .......................................................................................... 66
Transit Projects ............................................................................................. 68
Part B. Project Listings ................................................................................................... 73
Highway Projects .......................................................................................... 73
Transit Projects ............................................................................................. 79
Summary of Highway Project Listings by Town ............................................ 91
Part C. Federal Requirements ....................................................................................... 99
Part C.1. Highway Program Financial Plan ................................................................... 100
Highway Program Financial Plan Table ...................................................... 103
Summary of Highway Funding Categories.................................................. 104
Part C. 2. Transit Program Financial Plan ..................................................................... 109
Transit Program Financial Plan Table......................................................... 110
Summary of Transit Funding Categories .................................................... 112
MVRTA Transit Operations and Maintenance Summary Table .................. 116
Part C. 3. Status on Implementation of FFY 2020 TIP Projects .................................... 119
FFY 2020 Highway Project List................................................................... 119
FFY 2020 Transit Project List ..................................................................... 120
Part C. 4. Air Quality Conformity ................................................................................... 123
Part C. 5. Special Efforts – ADA ................................................................................... 129
Part C. 6. Title VI Notice to Beneficiaries ...................................................................... 129
Part C. 7. Environmental Justice ................................................................................... 132
Part C. 8. Equity Analysis.............................................................................................. 133
Appendix ....................................................................................................................... 151
Final FFYs 2021-2025 MVMPO TIP May 2020
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020
The Merrimack Valley Planning Commission (MVPC) operates its programs, services and activities in compliance with federal nondiscrimination laws including Title VI of the Civil Rights Act of 1964 (Title VI), the Civil Rights Restoration Act of 1987, and related statutes and regulations. Title VI prohibits discrimination in federally assisted programs and requires that no person in the United States of America shall, on the grounds of race, color or national origin (including limited English proficiency) be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity receiving federal assistance. Related federal nondiscrimination laws administrated by the Federal Highway Administration, the Federal Transit Administration, or both, prohibit discrimination on the basis of age, sex and disability. These protected categories are contemplated within MVPC’s Title VI Program consistent with federal interpretation and administration. Additionally, MVPC provides meaningful access to its programs, services, and activities to individuals with limited English proficiency, in compliance with U.S. Department of Transportation policy and guidance on federal Executive Order 13166.
MVPC also complies with the Massachusetts Public Accommodation Law, M.G.L. Chapter
272, Sections 92a, 98, and 98a prohibiting making any distinction, discrimination, or restriction in admission to or treatment in a place of public accommodation based upon race, color, religious creed, national origin, sex, sexual orientation, disability, or ancestry. Likewise, MVPC complies with the Governor’s Executive Order 526, Section 4 requiring that all of its programs, activities, and services provided, performed, licensed, chartered, funded, regulated, or contracted for shall be conducted without unlawful discrimination based upon race, color, age, gender, ethnicity, sexual orientation, gender identity or expression, religion, creed, ancestry, national origin, disability,
veteran’s status (including Vietnam-era veterans), or background.
Final FFYs 2021-2025 MVMPO TIP May 2020 1
Additional Information
To request additional information regarding Title VI and related federal and state nondiscrimination obligations, please contact:
Title VI Program Coordinator
Merrimack Valley Metropolitan Planning Organization c/o Merrimack Valley Planning Commission
160 Main Street
Haverhill, MA 01830-5061 (978) 374-0519, extension 15 [email protected]
Complaint Filing
To file a complaint alleging a violation of Title VI or related federal nondiscrimination law, contact the Title VI Program Coordinator (above) within one hundred and eighty (180) days of the alleged discriminatory conduct.
To file a complaint alleging a violation of the Commonwealth’s Public Accommodation Law,
contact the Massachusetts Commission Against Discrimination within three hundred (300)
days of the alleged discriminatory conduct at:
Massachusetts Commission Against Discrimination (MCAD) One Ashburton Place, 6th Floor
Boston, MA 02109 (617) 994-6000
TTY: (617) 994-6196
Translation
English
If this information is needed in another language, please contact the MVMPO Title
VI/Nondiscrimination Coordinator at 978-374-0519 ext. 15.
Spanish
Si necesita esta información en otro idioma, por favor contacte al coordinador de MVMPO
del Título VI/Contra la Discriminación al 978-374-0519 ext. 15.
Portuguese
Caso estas informações sejam necessárias em outro idioma, por favor, contate o
Coordenador de Título VI e de Não Discriminação da MVMPO pelo telefone 978-374-
0519, Ramal 15.
Final FFYs 2021-2025 MVMPO TIP May 2020 2
Chinese Simple
如果需要使用其它语言了解信息,请联系Merrimack Valley大都会规划组织(MVMPO)《 民权法案》第六章协调员,电话978-374-0519,转15。
Chinese Traditional
如果需要使用其他語言瞭解資訊,請聯繫Merrimack Valley大都會規劃組織(MVMPO)《 民權法案》第六章協調員,電話978-374-0519,轉15。
Vietnamese
Nếu quý vị cần thông tin này bằng tiếng khác, vui lòng liên hệ Điều phối viên Luật VI/Chống phân biệt đối xử của MVMPO theo số điện thoại 978-374-0519, số máy nhánh 15.
French Creole
Si yon moun vle genyen enfòmasyon sa yo nan yon lòt lang, tanpri kontakte Kowòdinatè kont Diskriminasyon/MVMPO Title VI la nan nimewo 978-374-0519, ekstansyon 15.
Russian
Если Вам необходима данная информация на любом другом языке, пожалуйста, свяжитесь с Координатором Титула VI/Защита от дескриминации в MVMPO по тел: 978-374-0519, добавочный 15.
French
Si vous avez besoin d'obtenir une copie de la présente dans une autre langue, veuillez contacter le coordinateur du Titre VI/anti-discrimination de MVMPO en composant le 978-
374-0519, poste 15.
Italian
Se ha bisogno di ricevere queste informazioni in un’altra lingua si prega di contattare il coordinatore del MVMPO del Titolo VI e dell'ufficio contro la discriminazione al 978-374-
0519 interno 15.
Mon-Khmer, Cambodian
ប្រសិនបរើបោក-អ្ន កប្រូវការរកប្ប្រព័រ៌មានបនេះ
សូ មទាក់ទងអ្ន កសប្មរសប្មួលជំពូ កទី6/គ្មា នការប រសើ
978-374-0519 រចភ្ជា រ់បៅបលខ 15។
បអ្ើងររស់ MVMPO តាមរយៈបលខទូរស័ពទ
Arabic
ﻁﻱﻁﺥﺕﻝﺍﺓ ﻡﻅﻥﻡﻝﻉﺏﺍﺕﻝﺍﻱﺯﻡﺕﻝﺍﻉﻥﻡﻝ ﺓﺱﺩﺱﺍ
ﻝﺓﺍﺭﻕﻑﻝﺍﻕﺱﻥﻡﺏﻝﺍﺹﺕلاﺍ ﻯﺝﺭُﻱ،ﻯﺭﺥﺃ ﺓ ﻍﻝﺏﺕﺍﻡﻭﻝﻉﻡﻝﺍ ﻩﺫﻩ ﻯﻝﺇ ﺓ ﺝﺍﺡﺏﺕﻥﻙﺍﺫﺇ
.15 ﻡﺍﻕﺭلأﺍ ﻁﻍﺽﺍ ﻡﺙﻭ978-374-0519 :ﻑﺕﺍﻩ ﻝﺍﻯﻝﻉ ﻱﻝﺍﻑﻙﺍﻡ ﻱﺭﻱﻡ ﻱﻑﻱﺭﺽﺡﻝﺍ
Final FFYs 2021-2025 MVMPO TIP May 2020 3
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020 4
Merrimack Valley Metropolitan Planning Organization Endorsement of the
FFYs 2021-2025 Transportation Improvement Program
Whereas, the Merrimack Valley MPO has completed its review in accordance with Section
176(c) (4) of the Clean Air Act as amended in 1990 [42 U.S.C. 7251 (a)], and hereby certifies that the FFYs 2021-2025 TIP is financially constrained and that the
implementation of the Merrimack Valley Metropolitan Planning Organization 2020 Regional
Transportation Plan satisfies the conformity criteria specified in both 40 CFR Part 51 and
93 (8/15/1997) and 310 CMR 60.03 (12/30/1994).
Therefore, in accordance with 23 CFR Part 450 Section 322 (Development and content of the Metropolitan Transportation Plan) of the March 16, 2007 Final Rules for Statewide and Metropolitan Planning, the MPO hereby endorses the FFYs 2021-2025 Transportation Improvement Program.
Signatory Certification: Date: May 27, 2020
Stephanie Pollack | Joseph Costanzo | James Fiorentini | ||
Secretary/ CEO MassDOT | Administrator/CEO MVRTA | Mayor of Haverhill |
_ |
| |
Jonathan L. Gulliver MassDOT Highway | Paul Materazzo Town of Andover | Daniel Rivera Mayor of Lawrence |
Division Administrator |
John Cashell | Neil Harrington | Robert Snow | ||
Town of Georgetown | Town of Salisbury | Town of Rowley |
Theresa Park
MVPC Director
Final FFYs 2021-2025 MVMPO TIP May 2020 5
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020 6
The Merrimack Valley Region Metropolitan Planning Organization certifies that its conduct of the metropolitan transportation planning process complies with all applicable requirements, which are listed below, and that this process includes activities to support the development and implementation of the Regional Long-Range Transportation Plan and Air Quality Conformity Determination, the Transportation Improvement Program and Air Quality Conformity Determination and the Unified Planning Work Program.
1. 23 U.S.C. 134, 49 U.S.C. 5303, and this subpart.
2. Sections 174 and 176 (c) and (d) of the Clean Air Act, as amended (42 U.S.C. 7504, 7506 (c) and
(d)) and 40 CFR part 93.
3. Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d-1) and 49 CFR Part 21.
4. 49 U.S.C. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity.
5. Section 1101(b) of the FAST Act (Pub. L. 1194) and 49 CFR Part 26 regarding the involvement of disadvantaged business enterprises in U. S. DOT funded projects.
6. The provisions of the American with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and 49
CFR Parts 27, 37, and 38.
8. The Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age in programs or activities receiving Federal financial assistance.
9. Section 324 of Title 23 U.S.C. regarding the prohibition of discrimination based on gender.
10. Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR Part 27 regarding discrimination against individuals with disabilities.
11. Anti-lobbying restrictions found in 49 USC Part 20. No appropriated funds may be expended by a recipient to influence or attempt to influence an officer or employee of any agency, or a Member of Congress, in connection with the awarding of any Federal contract.
Signatory Certification: Date: May 27, 2020
Stephanie Pollack | Joseph Costanzo | James Fiorentini | ||
Secretary/ | Administrator/CEO | Mayor of Haverhill | ||
CEO MassDOT | MVRTA |
Jonathan L. Gulliver | _ Paul Materazzo | Daniel Rivera | ||
MassDOT Highway Division Administrator | Town of Andover | Mayor of Lawrence | ||
John Cashell Town of Georgetown | Neil Harrington Town of Salisbury | Robert Snow Town of Rowley |
Theresa Park
MVPC Director
Final FFYs 2021-2025 MVMPO TIP May 2020 7
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020 8
310 CMR 60.05: Global Warming Solutions Act Requirements for the Transportation Sector and the Massachusetts Department of Transportation
This will certify that the FFYs 2021-2025 Transportation Improvement Program for the Merrimack Valley Metropolitan Planning Organization is in compliance with all applicable requirements in the State Regulation 310 CMR 60.05: Global Warming Solutions Act Requirements for the Transportation Sector and the Massachusetts Department of Transportation. The regulation requires the
Metropolitan Planning Organizations (MPOs) to:
1. 310 CMR 60.05, 5(a)(1): Evaluate and report the aggregate transportation GHG emissions and impacts of RTPs and TIPs;
2. 310 CMR 60.05, 5(a)(2): In consultation with MassDOT, develop and utilize procedures to pri- oritize and select projects in RTPs and TIPs based on factors that include aggregate transpor- tation GHG emissions impacts;
3. 310 CMR 60.05, 5(a)(3): Quantify net transportation GHG emissions impacts resulting from the projects in RTPs and TIPs and certify in a statement included with RTPs and TIPs pursuant to
23 CFR Part 450 that the MPO has made efforts to minimize aggregate transportation GHG
emissions impacts;
4. 310 CMR 60.05, 5(a)(4): Determine in consultation with the RPA that the appropriate planning assumptions used for transportation GHG emissions modeling are consistent with local land use policies, or that local authorities have made documented and credible commitments to es- tablishing such consistency;
5. 310 CMR 60.05, 8(a)(2)(a): Develop RTPs and TIPs;
6. 310 CMR 60.05, 8(a)(2)(b): Ensure that RPAs are using appropriate planning assumptions;
7. 310 CMR 60.05, 8(a)(2)(c): Perform regional aggregate transportation GHG emissions of
RTPs and TIPs;
8. 310 CMR 60.05, 8(a)(2)(d): Calculate aggregate transportation GHG emissions for RTPs and
TIPs
9. 310 CMR 60.05, 8(a)(2)(e): Develop public consultation procedures for aggregate transporta- tion GHG reporting and related GWSA requirements consistent with current and approved re- gional public participation plans;
10. 310 CMR 60.05, 8(c): Prior to making final endorsements on the RTPs, TIPs, STIPs, and pro- jects included in these plans, MassDOT and the MPOs shall include the aggregate transporta- tion GHG emission impact assessment in RTPs, TIPs and STIPs and provide an opportunity for public review and comment on the RTPs, TIPs and STIPs.
11. 310 CMR 60.05, 8(a)(1)(c): After a final GHG assessment has been made by MassDOT and
the MPOs, MassDOT and the MPOs shall submit MPO-endorsed RTPs, TIPs or projects within
30 days of endorsement to the Department for review of the GHG assessment.
Signatory Certification: Date: May 27, 2020
Stephanie Pollack Joseph Costanzo James Fiorentini
Secretary/CEO MassDOT Administrator/CEO Mayor of Haverhill
MVRTA Advisory Board
Jonathan L. Gulliver Paul Materazzo Daniel Rivera
MassDOT Highway Town of Andover Mayor of Lawrence
Division Administrator
John Cashell Neil Harrington Robert Snow Theresa Park
Town of Georgetown Town of Salisbury Town of Rowley MVPC Director
Final FFYs 2021-2025 MVMPO TIP May 2020 9
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020 10
Federal transportation authorization legislation establishes funding categories for transportation projects that may be eligible for Federal funding and sets maximum funding levels per category for each year of the legislation. Projects in this TIP are planned to be primarily funded through the federal transportation act titled “Fixing America’s Surface Transportation Act (FAST Act)” that was signed into law December 4, 2015. The FAST Act funds $305 billion dollars for transportation for Federal Fiscal Years (FFYs) 2016 through
2020.
The previous legislation “Moving Ahead for Progress in the 21st Century (MAP-21)” established planning factors known as the “MAP-21 eight planning factors”. The FAST Act adds two new planning factors (I and J in the list that follows), the FAST Act stipulates that the metropolitan planning process...
“provide for consideration of projects and strategies that will-
A) support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity and efficiency;
B) increase the safety of the transportation system for motorized and
non-motorized users;
C) increase the security of the transportation system for motorized and non-motorized users;
D) increase the accessibility and mobility of people and for freight;
E) protect and enhance the environment, promote energy conservation, improve quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns;
F) enhance the integration and connectivity of the transportation system, across and between modes, for people and freight;
G) promote efficient system management and operation;
H) emphasize the preservation of the existing transportation system;
Final FFYs 2021-2025 MVMPO TIP May 2020 11
I) improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation; and
J) enhance travel and tourism.”
It is the responsibility of the Federal mandated, State designated, regional Metropolitan Planning Organizations (MPOs) to carry out the Federal transportation planning process in their respective urbanized areas and prepare many Federal transportation documents, including the Transportation Improvement Program (TIP). This process, and the MPOs themselves, were established with the intention to include local and regional input into the Federal transportation planning process.
Based on Federal regulations any transportation project funded through the Federal Highway Administration (FHWA), or the Federal Transit Administration (FTA) must be listed in the appropriate region's Transportation Improvement Program (TIP). MassDOT combines the 13 regional MPO TIPs with statewide projects to produce the Statewide TIP (STIP) from which Federal-aid highway and transit projects are chosen. Without such a listing, Federal Highway funds cannot be expended by the Massachusetts Department of Transportation (MassDOT) on local or State projects. Similarly, the Merrimack Valley Regional Transit Authority (MVRTA) can only receive federal funds for projects listed in the TIP and STIP.
Merrimack Valley Metropolitan Planning Organization (MVMPO)
The MVMPO was first created by the Governor of Massachusetts in 1972. The MVMPO covers the same 15-community geographic area that defines the MVPC region and the MVRTA
service area. The current MVMPO membership is as follows:
• Secretary of MassDOT –Stephanie Pollack
• MassDOT Highway Division Administrator –Jonathan L. Gulliver
• Merrimack Valley Planning Commission (MVPC) Director –Theresa Park
• Administrator/CEO Merrimack Valley Regional Transit Authority –Joseph Costanzo
• Mayor of Haverhill –James Fiorentini
• Mayor of Lawrence –Daniel Rivera
• Representing Region 1 (Amesbury, Newburyport, Salisbury) –Neil Harrington
• Representing Region 2 (Newbury, Rowley, West Newbury) –Robert Snow
• Representing Region 3 (Boxford, Georgetown, Groveland, Merrimac) –John Cashell
• Representing Region 4 (Andover, Methuen, North Andover) –Paul Materazzo
Ex officio, non-voting members of the MVMPO include:
Final FFYs 2021-2025 MVMPO TIP May 2020 12
• Federal Highway Administration –Massachusetts Division –Jeff McEwen
• Federal Transit Administration – Region I – Peter Butler
• Rockingham Planning Commission MPO (NH), Chairman RPC – Barbara Kravitz
• Boston MPO, President MAPC –Erin Wortman
• Northern Middlesex MPO, Chairman NMCOG –Pat Wojtas
• Nashua MPO (NH), Chairman NRPC –Karin Elmer
The TIP has been prepared in accordance with 23 CFR 450.326.
The development of the TIP starts with the Regional Transportation Plan (RTP). The MVMPO’s RTP is a twenty-year plan for transportation projects that can be programmed for implementation with Federal funds. The RTP is fiscally constrained and lists potential future projects in five-year blocks. Projects were chosen for the RTP based on MAP-21 transportation planning factors, meeting performance measure targets, existing roadway conditions,
problems identified through ongoing pavement, congestion, and safety analyses conducted by the MVMPO, local and state project priorities and fiscal factors. Each year, the MVMPO programs projects from the RTP that are ‘ready-to-go’ into its five-year Transportation Improvement Program (TIP). Only those projects that are specifically identified in the RTP, or are consistent with its recommendations, can be programmed in the TIP. The planning tasks conducted in developing the RTP and the TIP are included in the region’s Unified Planning Work Program (UPWP) which is produced for public review annually. The UPWP includes additional transportation planning activities such as intersection and roadway analyses and studies.
Only projects from the RTP first two time bands of years (i.e., 2020 to 2024 and 2025 to 2029) are programmed in the TIP. An inconsistency with spending shown in the RTP is that when the MVMPO’s FFY 2020 RTP was developed, it was assumed the construction of North Avenue in Haverhill would occur in the FFYs 2020 to 2024 time-band. The estimated project cost for this project and for the North Andover Route 114 project have increased significantly to the point where programming both of these projects in the 2021 to 2025 TIP is not financially feasible. Neither project would be ready to advertise until 2023 or later. The Route 114 project has a TEC score of 11.32, the Haverhill North Avenue project has a TEC score of 8.25. In addition the North Andover Route 114 project is further along in the design process, therefore the North Andover Route 114 project is programmed to start in FFY 2023 and then consumes all the re- gional target funding in FFYs 2024 and 2025 and will also need a small amount of FFY 2026 funding before funding may be available for Haverhill North Avenue.
Projects that appear in the TIP were initiated and selected from a number of sources. Bridge projects have been selected and developed by MassDOT's Bridge section largely based upon
Final FFYs 2021-2025 MVMPO TIP May 2020 13
the results of their ongoing bridge maintenance program. MassDOT has made it a priority to develop projects that would correct problems in “Structurally Deficient” (SD) bridges. The region’s Congestion Management Process is used to identify intersections and roadways where significant congestion exists and measures the levels of congestion at these locations. This information has been used by local communities to develop roadway projects that are programmed in the TIP. Similarly, locations identified as having safety problems in the region’s Safety Monitoring System or identified as a "crash cluster" by MassDOT, are used by the Department and local communities to develop TIP projects. Projects that help meet Performance Measures targets are programmed in the TIP.
Bicycle and pedestrian paths and accomodations on roadways and bridges are part of the Massachusetts 2019 Statewide Pedestrian Transportation Plan and 2019 Statewide Bicycle Transportation Plan which strive to consider pedestrians and bicyclists at “the same level of importance as drivers in planning, design and maintenance” including incorporating the safety of these users in projects. These Plans also conduct analyses which locate areas with Potential for Everyday Biking, Gaps in the High Comfort Bikeway Network, Potential for Walkable Trips, Transit Route, and High Pedestrian and Bicycle Crash locations used to
initiate projects as well as score projects for the Massachusetts Capital Investment Plan (CIP). All TIP projects are part of the (CIP) which has a category of Expansion Projects which include projects that “expand bicycle and pedestrian networks to provide more transportation options and address health and sustainability objectives”. Many bicycle and pedestrian projects are initiated by a municipality because the State provides funding for these projects in the Complete Streets, Shared Use Path, and the Safe Route to Schools Programs.
Federal legislation requires states to develop a Transportation Asset Management Plan (TAMP) that includes Performance Measures for NHS roadways and bridges as part of the as- set management process. MassDOT Highway Division submitted an initial TAMP to FHWA on April 30, 2018, the TAMP was finalized in September of 2019.
The Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Fixing America's Surface Transportation Act (FAST) require State DOTs and MPOs to establish performance measures, and targets for these measures, to be used in assessing the transportation system and programming projects for Federal funding categories provided in the Acts. The Final Rules establishing these measures have been released in three separate rule makings. PM1: "HSIP and Safety Performance Management Measures", PM2: "Pavement and Bridge Condition Performance Measures", and PM3: "System Performance/ Freight/ CMAQ Performance
Measures". These Rules define the measures to be used in each of the categories.
Final FFYs 2021-2025 MVMPO TIP May 2020 14
The PM1 HSIP and Safety Performance Measures apply to all public roads. The PM2 Pave- ment and Bridge Performance Measures apply only to NHS (National Highway System) roads and bridges. PM3 Performance Measures apply to various facilities as defined below.
MassDOT has established targets based on these performance measures and the MPOs have worked with MassDOT in either a) choosing the same targets, b) adapting them to the specific region, or c) choosing new targets as goals for the MPO. The MVMPO has adopted all of the targets established by MassDOT. MassDOT and the MPOs will work cooperatively to ex- change data and performance targets and measures as required by the legislation.
The following are the performance measures, divided into three categories, as defined by the
Final Federal Rules:
HSIP and Safety Performance Management Measures to be applied to all public roads
(PM1):
• Number of Fatalities
• Fatality rate per 100 million vehicle-miles traveled
• Number of Serious Injuries
• Serious injury rate per 100 million vehicle-miles traveled
• Number of non-motorized fatalities and non-motorized serious injuries
Pavement and Bridge Condition Performance Measures (PM2):
• Percentage of Pavements of the Interstate System in Good condition
• Percentage of Pavements of the Interstate System in Poor condition
• Percentage of Pavements of the non-Interstate NHS in Good condition
• Percentage of Pavements of the non-Interstate NHS in Poor condition
• Percentage of NHS bridges by deck area classified as in Good condition
• Percentage of NHS bridges by deck area classified as in Poor condition
MassDOT has submitted a draft NHS Transportation Asset Management Plan (TAMP), as re- quired by MAP-21, to address pavement and bridge conditions on the NHS system. The TAMP was finalized in September 2019.
System Performance/ Freight/ CMAQ Performance Measures (PM3):
• Percent of the Person-Miles Traveled on the Interstate that are Reliable
• Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reliable
• Truck Travel Time Reliability (TTTR) Index on the Interstate System
• Annual Hours of Peak Hour Excessive Delay Per Capita
• Percent of Non-SOV Travel on the NHS System
Final FFYs 2021-2025 MVMPO TIP May 2020 15
• Total Emission Reduction of all projects funded with CMAQ in areas designated as non- attainment or maintenance for ozone (O3), carbon monoxide (CO), or particulate matter (PM10 and PM2.5)
The MVMPO will work cooperatively with MassDOT to determine which performance measures the MPO will collect data for and measure, and which MassDOT will collect data for and measure and will exchange data and program projects for funding with consideration of meeting the targets established for each measure. The performance measures will be incorpo- rated into the Transportation Improvement Program (TIP) Transportation Evaluation Criteria (TEC) in the scoring categories as indicated in the TEC Scoring Criteria Chart in Section A.3.
of the TIP.
Targets are set by examining historic trends in the data and considering future plans for poten- tial improvements.
Safety Performance Measures (PM1)
The Merrimack Valley MPO has chosen to adopt the statewide safety performance measure targets set by MassDOT for Calendar Year (CY) 2020. In setting these targets, MassDOT has followed FHWA guidelines by using statewide crash data and Highway Performance Monitor- ing System (HPMS) data for vehicle miles traveled (VMT) in order to calculate 5 year, rolling average trend lines for all FHWA-defined safety measures.
Total Fatalities: Over the last seven years, the number of fatalities in Massachusetts has been relatively stable, fluctuating less than 1 percent with the exception of 2016, when the 5- year average reached 364. That said, the most recent data shows that the five-year average for fatalities in 2018, 358, is the second lowest it has been since the 2008 – 2012 five-year av- erage. The calendar year (CY) 2020 target of 347 was set to reflect an anticipated decrease in fatalities due to data enhancements, safety projects, and strategies and legislative proposals that were part of the 2018 Strategic Highway Safety Plan (SHSP), such as the primary seat belt and hands-free driving laws. It should be noted that MassDOT’s overarching goal is to-
wards zero deaths, which will be pursued through the continued implementation of SHSP strat- egies.
Similarly, the Merrimack Valley Region number of fatalities is relatively stable with slightly
lower numbers of 16 and 17 fatalities averaged over five years for the most recent three rolling
5-year averages ending in years 2016, 2017 and 2018 compared to 19 and 20 fatalities aver- aged over five years for the 5-year rolling averages ending in years 2012, 2013 and 2014.
Fatality Rate: Partly due to a 0.3% annual increase in VMT and an overarching downward trend in the fatality rate, it is anticipated that the fatality rate from 2013–2017 of 0.59 fatalities
Final FFYs 2021-2025 MVMPO TIP May 2020 16
per 100 million vehicle miles traveled will drop to 0.56 fatalities per 100 million vehicle miles traveled between 2016–2020. (Note: Statewide VMTs used to calculate the Projected CY20
Target Fatality Rate were adjusted after state adoption of the 0.56 per 100 million VMT target.)
The Merrimack Valley Region has also seen a steady downward trend in fatality rate from a high of 0.57 fatalities per 100 million VMT for the 5-year period ending in 2013, down to 0.45 fatalities per 100 million VMT for the 5-year period ending in 2018.
Total Incapacitating Injuries: Although this measure is particularly prone to contextual fac- tors, it is anticipated that there will be an overall decrease in the number of incapacitating inju- ries due to a continual downward trend line as well as the implementation of countermeasures that are being developed as part of the 2018 Strategic Highway Safety Plan.
The Merrimack Valley number of incapacitating injuries was lowest in the 2012 to 2016 5-year average period at 131, but 2013 to 2017 and 2014 to 2018 at 139 and 141 are significantly lower than the earlier periods that were around 160.
Incapacitating Injuries Rate: Similar to the fatality rate, it is anticipated that the increase in
VMT and a downward trend line will result in a drop in the rate of incapacitating injuries from
4.84 per 100 million VMT between 2013–2017 to 4.30 between 2016–2020. (Note: Statewide VMTs used to calculate the Projected CY20 Target Incapacitating Injury Rate were adjusted after state adoption of the 4.30 per 100 million VMT target.)
In the Merrimack Valley region the incapacitating injury rate has also decreased from the ear- lier years with a rate of 3.85 per 100 million VMT the 5-year average from 2014 to 2018 versus
4.6 from 2008 to 2012.
Total Number of Non-Motorized Fatalities and Incapacitating Injuries: The most recent data for non-motorized fatalities and incapacitating injuries indicates that the previously in- creasing trend decreased in 2017. The CY 2020 target of 505 has been set to reflect continued projected reductions in non-motorized fatalities and injuries due to a number of implementation strategies contained within the Statewide Bike Plan, Statewide Pedestrian Plan, and Strategic Highway Safety Plan.
The total number of non-motorized fatalities and incapacitating injuries has increased slightly in the most recent 5-year periods to 18 from 2012 to 2016 and 19 from 2013 to 2017 and 2014 to
2018. The earlier 5-year periods had an average of 16 from 2009 to 2013 and 17 the remain-
ing 3 time periods.
Final FFYs 2021-2025 MVMPO TIP May 2020 17
Figure 1 Statewide Total Fatalities and Fatal Crash Rates- 5-Year Averages
Total Fatalities
(5-year Averages)
400 Projected Projected 1.00
CY19 Target CY20 Target
350
300
362 359 362 361 364 357 358
353 347 0.90
0.80
0.70
250 j::'
0.60
en -roc:
Q) 0::: .Q
200 0.50
co 0
1..1.. coo
1..1.. ....
150 0.40 Q-5
100
50
0.30
0.20
0.10
0 0.00
'08-'12 '09-'13 '10-'14 '11-'15 '12-'16 '13-'17 '14-'18 '15-'19 '16-'20
- ActualFatalities - Projected Targets • Fatality Rate Projected Targets ---- Trend Line (Fatality Rate)
Graph Source: MassDOT
Final FFYs 2021-2025 MVMPO TIP May 2020 18
Figure 2 Merrimack Valley Total Fatalities and Fatal Crash Rates- 5-Year Averages
Merrimack Valley Total Fatalities
(5-year Averages)
20 19
15
C/)
20 20
18
17 17
16
1.00
0.90
0.80
0.70 Q)
(\5c:::
0.60 .Q._
=:z-:-::::
Q) •····
nl
u.
0.50
0.40
E
nla
u"_E-,...
.....
Q)
Q
0.30
5
0.20
0.10
0
08'-12' 09'-13' 10'-14' 11'-15'
- Actual Fatalities
12'-16'
13'-17'
14'-18'
0.00
• Fatality Rate
••••••••• MV Trend Line (Fatality Rate)
Final FFYs 2021-2025 MVMPO TIP May 2020 19
Figure 3 Statewide Total Incapacitating Injuries and Incapacitating Injury Crash Rates
5 Year Averages
Total Incapacitating Injuries
(5-year Averages)
4000 10
3595 Projected Projected
3500 3438 CY19 Target CY20 Target 9
3146 8
2801
3000
7
.!!l
(/) co
·2500 0:::
:J :::::.
:E .::!, c:
Ccl .Q
2000 0>
'(3 coo co 0 co '-
1500
1000
500
O.<!J
3 5
2
0 0
'08-'12 '09-'13 '10-'14 '11-'15 '12-'16 '13-'17 '14-'18 '15-'19 '16-'20
- Actual Injuries - Projected Targets • Injury Rate Injury Rate Targets - --- Trend Line (Injury Rate)
Graph Source: MassDOT
Final FFYs 2021-2025 MVMPO TIP May 2020 20
Figure 4 Merrimack Valley Total Incapacitating Injuries and Incapacitating Injury Crash Rates
5-Yr Averages
Merrimack Valley Total Incapacitating Injuries
(5-year Averages)
180
------------------------------,- 10.00
161
159
160
140
(/)
·120
·:c::::1:
C) 100
c::
:;:::;
ro
-,.....--,--i===:r----r-sr------------------r 9.00
144 141
8.00
7.00
6.00
5.00
ro
c::
80
4.00
60
3.00
40 2.00
20 1.00
. ,&. ..._ ..._ -L. 0.00
0
08'-12'
09'-13'
10'-14' 11'-15'
12'-16' 13'-17' 14'-18'
- Actual Injuries • Injury Rate ----- Trend Line (Injury Rate)
Final FFYs 2021-2025 MVMPO TIP May 2020 21
600
550
500
480
501
(5-year Averages)
530 539 541
518
505
Projected
CY19 Target
541
Projected CY20
Target
505
450
400
350
300
250
200
150
100
50
0
'08-'12 '09-'13 '10-'14 '11-'15 '12-'16 '13-'17 '14-'18 '15-'19 '16-'20
Graph Source: MassDOT
Actual Injuries & Fatalities Projected Targets
Final FFYs 2021-2025 MVMPO TIP May 2020 22
(5-year Averages)
20
18 17
16
16
17 17
19 19
18
14
12
10
8
6
4
2
0
08'-12' 09'-13' 10'-14' 11'-15' 12'-16' 13'-17' 14'-18'
Actual Injuries & Fatalities
Final FFYs 2021-2025 MVMPO TIP May 2020 23
In recent years, MassDOT and the Merrimack Valley MPO have invested in “complete streets”, bicycle and pedestrian infrastructure, intersection and safety improvements in both the Capital Investment Plan (CIP) and Statewide Transportation Improvement Pro- gram (STIP) to address increasing mode share and to incorporate safety mitigation ele- ments into projects. Moving forward, Merrimack Valley MPO, alongside MassDOT, is actively seeking to improve data collection and methodology for bicycle and pedestrian VMT counts and to continue analyzing crash clusters and crash counts that include both motorized and non-motorized modes in order to address safety issues at these loca- tions.
Bridge & Pavement Performance Measures (PM 2)
The Merrimack Valley MPO has chosen to adopt the 2-year (2020) and 4-year (2022) statewide bridge and pavement performance measure targets set by MassDOT. MassDOT was required to adopt a statewide target by May 20th, 2018, with MPOs ei- ther adopting the statewide target or establishing their own by November 2018. In set- ting these targets, MassDOT has followed FHWA guidelines by measuring bridges and pavement condition using the 9-point National Bridge Inventory Standards (NBIS); the International Roughness Index (IRI); the presence of pavement rutting; and the pres- ence of pavement cracking. 2-year and 4-year targets were set for six individual perfor- mance measures: percent of bridges in good condition; percent of bridges in poor condi- tion; percent of Interstate pavement in good condition; percent of Interstate pavement in poor condition; percent of non-Interstate pavement in good condition; and percent of
non-Interstate pavement in poor condition. All of the above performance measures are tracked in greater detail in MassDOT’s Transportation Asset Management Plan (TAMP), which was finalized in September 2019. It is posted here: https://www.mass.gov/ser-
vice-details/massdot-asset-management.
Targets for bridge-related performance measures were determined by identifying which bridge projects are programmed and projecting at what rate bridge conditions deterio- rate. The bridge-related performance measures measure the percentage of deck area, rather than the total number of bridges.
Performance targets for pavement-related performance measures were based on a sin- gle year of data collection, and thus were set to remain steady under the guidance of FHWA. These measures are to be revisited at the 2-year mark (2020), once three years of data are available, for more informed target setting.
MassDOT continues to measure pavement quality and to set statewide short-term and long-term targets in the MassDOT Performance Management Tracker using the Pave- ment Serviceability Index (PSI), which differs from IRI. These measures and targets are used in conjunction with federal measures to inform program sizing and project selec-
tion.
Final FFYs 2021-2025 MVMPO TIP May 2020 24
Performance Measure
Bridges in good condition Bridges in poor condition Interstate Pavement in
good condition
Interstate Pavement in poor condition
Non-Interstate Pavement in good condition
Non-Interstate Pavement in poor condition
Reliability, Congestion, & Emissions Performance Measures (PM3)
Merrimack Valley MPO has chosen to adopt the 2-year (2020) and 4-year (2022) statewide reliability, congestion, and emissions performance measure targets set by MassDOT. MassDOT was required to adopt a statewide target by May 20th, 2018, with MPOs either adopting the statewide target or establishing their own by November 2018. MassDOT followed FHWA regulation in measuring Level of Travel Time Reliability (LOTTR) on both the Interstate and non-Interstate NHS as well as Truck Travel Time Reliability (TTTR) on the Interstate system using the National Performance Manage ment Research Dataset (NPMRDS) provided by FHWA. These performance measures aim to identify the predictability of travel times on the roadway network by comparing
the average travel time along a given segment against longer travel times. For LOTTR, the performance of all segments of the Interstate and of the non-Interstate NHS are de fined as either reliable or unreliable based on a comparison between the 50th percentile travel time and the 80th percentile travel time, and the proportion of reliable segments is reported. For TTTR, the ratio between the 50th percentile travel time and the 90th per centile travel time for trucks only along the Interstate system is reported as a statewide measure. As this data set has but one year of consistent data, FHWA guidance has been to set conservative targets and to adjust future targets once more data becomes available. To that end, MassDOT's reliability performance targets are set to remain the same.
The Merrimack Valley MPO an agency whose planning area includes communities in the Boston Urbanized Area (UZA), and as a signatory to the 2018 Boston UZA Memo randum of Understanding (Boston UZA MOU)-has also adopted 2-year (2020) and 4- year (2022) Boston UZA-wide congestion performance measure targets. These perfor mance measures are the percentage of non-single occupancy vehicle (SOV) travel and
Final FFYs 2021-2025 MVMPO TIP May 2020 25
the Peak Hour Excessive Delay (PHED). Targets were developed in coordination with state Departments of Transportation and neighboring MPOs with planning responsibility for portions of the Boston UZA.
The percentage of non-SOV travel is approximated using the U.S. Census Bureau’s American Community Survey (ACS) Journey-to-Work data. In the Boston UZA, the pro- portion of non-SOV travel has been steadily increasing and is projected to continue in- creasing at a rate of 0.32% annually.
PHED is measured by totaling the number of hours spent in excessive delay (defined as travel time at 20 miles per hour or at 60% of the posted speed limit, whichever is
greater) in peak hours (between 6:00am and 10:00, and between 3:00pm and 7:00pm) divided by the total UZA population. As of target-setting, there was only one year of data available. As such, the performance targets have been set flat until further data is avail- able.
Emissions reduction targets are measured as the sum total of all emissions reductions anticipated through CMAQ-funded projects in non-attainment or air quality maintenance areas (currently the cities of Lowell, Springfield, Waltham, and Worcester, and the town of Oak Bluffs) identified in the Statewide Transportation Improvement Program (STIP).
This anticipated emissions reduction is calculated using the existing CMAQ processes.
Final FFYs 2021-2025 MVMPO TIP May 2020 26
Measure Current (2017) 2-year 4-year (2022) (2020)
Non-Interstate LOTTR Interstate LOTIR
,TITR
PHED (Boston UZA)
% non-SOV (Boston UZA)
I
Emissions Reductions
80% 80% 80%
68% 68% 68%
1.85 1.85 1.85
18.31 18.31 18.31
33.6% (2016) 34.82% 35.46%
Baseline (FFY 14- 1,622 co TBD CO (Spring-
17) 497.9 Ozone field)
1.1 Ozone
Final FFYs 2021-2025 MVMPO TIP May 2020 27
MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table
Performance Measure Cat- egory | Performance Measure | Recent Data | Targets |
PM1: HSIP and Safety | Number of Fatalities Statewide (All Public Roads) | 358 average number of fatalities/ year for 2014 to 2018 | CY 2019 Target = 353 CY 2020 Target = 347 fatalities |
PM1: HSIP and Safety | Fatality rate per 100 million vehicle-miles traveled. | 0.58 fatalities per 100 million ve- hicles miles traveled per year av- erage for 2014 to 2018 | CY 2019 Target = 0.58 CY 2020 Target = 0.56 fatalities per 100 million vehicle miles traveled |
PM1: HSIP and Safety | Number of Incapacitating Injuries Statewide (All Public Roads) | 2,810 average number of inca- pacitating injuries per year aver- age from 2014 to 2018 | CY 2019 Target = 2,801 CY 2020 Target = 2,689 serious injuries |
PM1: HSIP and Safety | Serious injury rate per 100 million vehicle- miles traveled. | 4.57 incapacitating injuries per 100 million vehicle miles traveled per year average for 2014 to 2018 | CY 2019 Target = 4.37 CY 2020 Target = 4.30 serious injuries per 100 million vehicle miles traveled |
PM1: HSIP and Safety | Number of Non-motorized Fatalities and Non-motorized Serious Injury Statewide (All Public Roads) | 505 average number of com- bined serious injuries and fatali- ties per year for non-motorized modes for 2014 to 2018 | CY 2019 Target = 541 CY 2020 Target = 505 combined fatalities and serious injuries for non- motorized modes |
Final FFYs 2021-2025 MVMPO TIP May 2020 28
MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table (Cont.)
Performance Measure Cat- egory | Performance Measure | Recent Data | Targets |
PM2: Pave- ment and Bridge Condi- tion | Percentage of Pavements of the Interstate System in Good Condition Statewide | 74.2% in CY 2017 | CY 2020 Target = 70% CY 2022 Target = 70% |
PM2: Pave- ment and Bridge Condi- tion | Percentage of Pavements of the Interstate System in Poor Condition Statewide | 0.1% in CY 2017 | CY 2020 Target = 4% CY 2022 Target = 4% |
PM2: Pave- ment and Bridge Condi- tion | Percentage of Pavements of the non-Inter- state NHS in Good Condition Statewide | 32.9 % in CY 2017 | CY 2020 Target = 30% CY 2022 Target = 30% |
PM2: Pave- ment and Bridge Condi- tion | Percentage of Pavements of the non-Inter- state NHS in Poor Condition Statewide | 31.4% in CY 2017 | CY 2020 Target = 30% CY 2022 Target = 30% |
Final FFYs 2021-2025 MVMPO TIP May 2020 29
MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table (Cont.)
Performance Measure Cat- egory | Performance Measure | Recent Data | Targets |
PM2: Pave- ment and Bridge Condi- tion | Percentage of NHS bridges by deck area in Good Condition Statewide | 15.22% Currently | CY 2020 Target = 15% CY 2022 Target = 16% |
PM2: Pave- ment and Bridge Condi- tion | Percentage of NHS bridges by deck area in Poor Condition Statewide | 12.37% Currently | CY 2020 Target = 13% CY 2022 Target = 12% |
PM3: System Performance/ Freight/ CMAQ | Percent of Person-Miles Traveled on the In- terstate that are Reliable Statewide | 68 % in CY 2017 | CY 2020 Target = 68% CY 2022 Target = 68% |
PM3: System Performance/ Freight/ CMAQ | Percent of Person-Miles Traveled on the Non-Interstate NHS that are Reliable Statewide | 80% in CY 2017 | CY 2020 Target = 80% CY 2022 Target = 80% |
Final FFYs 2021-2025 MVMPO TIP May 2020 30
MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table (Cont.)
Performance Measure Cat- egory | Performance Measure | Recent Data | Targets |
PM3: System Performance/ Freight/ CMAQ | Truck Travel Time Reliability (TTTR) Index on the Interstate System Statewide | TTTR index in CY 2017 = 1.85 | CY 2020 Target = 1.85 CY 2022 Target = 1.85 |
PM3: System Performance/ Freight/ CMAQ | Annual Hours of Peak Hour Excessive De- lay (PHED) per Capita in the UZA | PHED per capita in CY 2017 = 18.31 hours per person in the UZA | 2018-2019 Two-year Target = 18.3 2018-2021 Four-year Target = 18.3 |
PM3: System Performance/ Freight/ CMAQ | Percent of Non-SOV Travel on the NHS System in the UZA | CY 2016 Non-SOV Travel on the NHS in the UZA = 33.6% | CY 2020 Target = 34.5% CY 2022 Target = 35.1% |
Final FFYs 2021-2025 MVMPO TIP May 2020 31
Year (s) Program- med | City / Town | Project Description | Total Cost Programmed | Federal Performance Target(s) Project Will Help Meet |
2024- 2025 | Andover | Andover- Bridge Rehabilitation, A-09- 036, I-495 over St 28 (SB), A-09-037, I- 495 over B&M and MBTA, A-09-041, I- 495 over St 28 (NB) (# 606522) | $36,054,012 | 1) Percentage of NHS bridges classified as in Good condition. 2) Percentage of Pavements of the In- terstate System in Good Condition and in Poor Condition 3) Percent of the Person-Miles Traveled on the Interstate that are Reliable. 4) Truck Travel Time Reliability (TTTR) Index on the Interstate System. |
2022 | George- town / Box- ford | Georgetown - Boxford Border to Boston Trail, from Georgetown Road to West Main Street (Route 97) (# 607541) | $2,520,436 | 1) Number of non-motorized fatalities and non-motorized serious injury. 2) Percent change in Tailpipe CO2 Emissions on the NHS Compared to Calendar Year 2017 Level. |
2024 | George- town / Newbury | Georgetown - Newbury Border to Bos- ton Trail, (Northern Georgetown to By- field Section) (# 607542) | $5,685,060 | Number of non-motorized fatalities and non-motorized serious injury. |
Final FFYs 2021-2025 MVMPO TIP May 2020 32
Year (s) Program- med | City / Town | Project Description | Total Cost Programmed | Federal Performance Target(s) Project Will Help Meet |
2021 | Groveland | Groveland – Groveland Community Trail, from Main Street to King Street (# 608298) | $1,984,861 | 1) Number of non-motorized fatalities and non-motorized serious injury. 2) Percent change in Tailpipe CO2 Emissions on the NHS Compared to Calendar Year 2017 Level. |
2021- 2023 | Haverhill | Haverhill – Bridge Replacement, H-12- 039, I-495 (NB & SB) over Merrimack River (# 605306) (AC Yrs 4 to 6 of 6) | $46,503,796 | 1) Percentage of NHS bridges classified as in Good condition. 2) Percentage of Pavements of the In- terstate System in Good Condition and in Poor Condition 3) Percent of the Person-Miles Traveled on the Interstate that are Reliable. 4) Truck Travel Time Reliability (TTTR) Index on the Interstate System. |
2023- 2025 | Haverhill | Haverhill – Bridge Replacement, H-12- 040, I-495 (NB & SB) over Merrimack River (#609466) (AC Yrs 1,2 & 3 of 4) | $94,747,200 | 1) Percentage of NHS bridges classified as in Good condition. 2) Percentage of Pavements of the In- terstate System in Good Condition and in Poor Condition 3) Percent of the Person-Miles Traveled on the Interstate that are Reliable. 4) Truck Travel Time Reliability (TTTR) Index on the Interstate System. |
Final FFYs 2021-2025 MVMPO TIP May 2020 33
Year (s) Program- med | City / Town | Project Description | Total Cost Programmed | Federal Performance Target(s) Project Will Help Meet |
2024- 2025 | Haverhill | Haverhill – Bridge Replacement, H-12- 007 &H-12-025, Bridge Street (SR 125) over the Merrimack River (# 605304) (AC Yrs 1 & 2 of 5) | $45,861,496 | 1) Percentage of NHS bridges classified as in Good condition. 2) Percentage of Pavements of the Non- Interstate NHS in Good Condition and in Poor Condition 3) Percent of the Person-Miles Traveled on the Non- Interstate NHS that are Reli- able. |
2021 | Haverhill | Haverhill – Intersection Improvements at Rt 110 / Rt 108 (#608761) | $1,980,067 | 1) Number and Rate of Fatalities 2) Number and Rate of Serious Injuries 3) Number of non-motorized fatalities and non-motorized serious injury. 4) Percent change in Tailpipe CO2 Emis- sions on the NHS Compared to Calendar Year 2017 Level. 5) Percent of the Person-Miles Traveled on the non-Interstate NHS that are Relia- ble. |
Final FFYs 2021-2025 MVMPO TIP May 2020 34
Year (s) Program- med | City / Town | Project Description | Total Cost Programmed | Federal Performance Target(s) Project Will Help Meet |
2022 | Lawrence | Lawrence – Intersection Improvements at Merrimack Street and South Broad- way (Route 28) (# 609509) | $1,610,960 | 1) Number and Rate of Fatalities 2) Number and Rate of Serious Injuries 3) Number of non-motorized fatalities and non-motorized serious injury. 4) Percent change in Tailpipe CO2 Emis- sions on the NHS Compared to Calen- dar Year 2017 Level. 5) Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reli- able. |
2021 | Lawrence | Lawrence – Intersection Improvements at South Broadway (Route 28) and Mount Vernon Street (# 609251) | $1,013,739 | 1) Number and Rate of Fatalities 2) Number and Rate of Serious Injuries 3) Number of non-motorized fatalities and non-motorized serious injury. 4) Percent change in Tailpipe CO2 Emis- sions on the NHS Compared to Calen- dar Year 2017 Level. 5) Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reli- able. |
Final FFYs 2021-2025 MVMPO TIP May 2020 35
Year (s) Program- med | City / Town | Project Description | Total Cost Programmed | Federal Performance Target(s) Project Will Help Meet |
2023 | Lawrence | Lawrence – Lawrence Manchester Rail Corridor (LMRC) Rail Trail (# 608930) | $16,087,005 | Number of non-motorized fatalities and non-motorized serious injury |
2022 | Methuen | Methuen – Intersection Improvements at Riverside Drive and Burnham Road (# 610658) | $967,200 | Number of non-motorized fatalities and non-motorized serious injury |
2022 | Newbury - New- buryport - Salisbury | Newbury - Newburyport - Salisbury - Resurfacing and related work on Route 1 (# 608494) | $9,807,200 | Percentage of Pavements of the non-In- terstate NHS in Good condition. |
2021 | New- buryport | Newburyport – Riverfront Clipper City Rail Trail Construction (# 610663) | $1,900,802 | Number of non-motorized fatalities and non-motorized serious injury. |
2023- 2025 | North Andover | North Andover - Corridor Improvements on Route 114, between Route 125 (Andover Street) & Stop & Shop Drive- way (# 608095) | $26,906,532 | 1) Number of non-motorized fatalities and non-motorized serious injury. 2) Percentage of Pavements of the non- Interstate NHS in Good condition. 3) Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reli- able. 4) Number and Rate of Serious Injuries |
Final FFYs 2021-2025 MVMPO TIP May 2020 36
Year (s) Program- med | City / Town | Project Description | Total Cost Programmed | Federal Performance Target(s) Project Will Help Meet |
2025 | Rowley | Rowley – Safety Improvements at Route 1, Central and Glen Streets (# 609392) | $2,368,068 | 1) Number and rate of fatalities. 2) Number and rate of Serious Injuries |
2023 | Salisbury | Salisbury – Reconstruction of Route 1 (Lafayette Road) (# 602202) | $6,837,285 | Number of non-motorized fatalities and non-motorized serious injury. |
2021 | MVRTA | MVRTA – Flex to FTA to Replace Yr 2009 Buses with new Buses Delivery 2022 (7 of 9) (# S10777) | $3,467,361 | Percent of Person-Miles Traveled on the Non-Interstate NHS that are Reliable Statewide |
Final FFYs 2021-2025 MVMPO TIP May 2020 37
Transit Asset Management (TAM) Plan Performance Management Targets
The MVRTA completed its TAM Plan March 6, 2020. The Performance Management Tar- gets were adopted by the MVRTA Advisory Board on May 7, 2020. The Merrimack Valley MPO adopted these targets at its May 27, 2020 MPO meeting.
The following information is from the MVRTA Transit Asset Management Plan prepared
3/6/2020.
Annual Performance Targets and Measures
As a recipient of Federal Transit Administration funds, the MVRTA is required to develop and maintain a Transit Asset Management Plan per FTA’s Final Rule at 49 CFR Part 625. As defined by the Rule, Transit Asset Management (TAM) is the strategic and systematic practice of processing, operating, inspecting, maintaining, rehabilitating and replacing transit capital assets to manage their performance, risks and cost over their life cycles to provide safe, cost effective and reliable public transportation.
The preparation of the TAM is based on identifying the transit assets which the MVRTA owns and has direct Capital responsibility for and the performance measures included in the Final Rule that relate to these identified assets.
Performance Measure | |
Equipment Non-revenue support-service and maintenance vehicles | Percentage of vehicles met or exceeded Useful Life Benchmark |
Rolling Stock Revenue vehicles by mode, bus/ van | Percent of vehicles met or exceeded Useful Life Benchmark |
Facilities Maintenance and administra- tive facilities: and passenger stations (buildings) and park- ing facilities | Percentage of Assets with condition rating below 3.0 on FTA TERM Scale. |
Final FFYs 2021-2025 MVMPO TIP May 2020 38
Using these Performance Measures leads to the setting of targets against the defined Use
ful Life Benchmark (ULB). Which FTA defines as:
The expected lifecycle of a capital asset for a particular Transit Provider's operating environment, or the acceptable period of use in service for a particular Transit Provider's op erating environment.
The MYRTA has defined the ULB as presented in FTA circular C 5010.1E for buses and vans:
Minimum Service-life for Buses and Vans
For TAM Plan dated 3/6/2020, the MYRTA has prepared the following targets:
Transit TAM Targets
Percent of revenue vehicles that have met or exceeded their useful life benchmark:
FFY 2020 | FFY 2021 | FFY 2022 | FFY 2023 | |
Bus | 0% | 18% | 8% | 8% |
Van | 0% | 70% | 0% | 26% |
Final FFYs 2021-2025 MVMPO TIP May 2020 39
Non-revenue vehicles - percent of service vehicles that have met or exceeded their useful
life benchmark:
FFY 2020 | FFY 2021 | FFY 2022 | FFY 2023 | |
Maintenance Trucks | 0% | 0% | 0% | 0% |
SUV (Supervisory Vehi- cles) | 12% | 12% | 25% | 12% |
Facility - percent of facilities rated below 3 on the FTA condition scale:
Passenger/ Parking facilities 0% (McGovern Center, Gateway Surface Parking, Haverhill Intermodal Parking, Costello Center)
Administrative/ maintenance facilities 0% (85 Railroad Ave. HQ)
Updates to these targets will be done in conjunction with the preparation of the next TAM Plan and the FY 2022-2026 Capital Plan.
In May of 2020 the Merrimack Valley MPO voted to adopt the transit TAM performance measure targets set by MVRTA for FFY 2020 through FFY 2023.
Public Transportation Agency Safety Plan (PTASP) Final Rule.
The MVRTA as a recipient of FTA Urban Area Funding Grants needs to develop a plan to implement a Safety Management System (SMS) that includes safety performance targets. Originally with a deadline of July 2020, Regional Transit Authorities (RTA’s) now have until December 2020 to develop the plan. More information can be found at: https://www.transit.dot.gov/about/news/us-department-transportation-provides-greater-flex-
ibility-transit-agencies-meet-safety .
Final FFYs 2021-2025 MVMPO TIP May 2020 40
The FFYs 2021-2025 Merrimack Valley Metropolitan Planning Organization’s Transportation Improvement Program (TIP) contains Federal-aid project programming information for five years. For each year, gross estimates of project costs are listed in the federal fiscal year of the proposed advertise date. Federal fiscal years begin on October 1 and run through September 30. For example, FFY 2021 begins on October 1, 2020 and ends on September 30, 2021. The advertising dates shown for roadway projects were determined based on information provided by the Capital Expenditure and Program Office within MassDOT, the MassDOT District 4 Office, and MVMPO member communities. The MVRTA and MassDOT's Rail and Transit Division determined programming dates for transit projects.
Projects are programmed in the region’s TIP based on a number of factors. These include the project’s score based upon the MPO’s Transportation Evaluation Criteria (TEC), project cost and the availability of STBG funding in the years covered in the document.
Road and bridge project selection is also largely dependent upon the current and expected design status for each project, which can be affected by such factors as environmental permitting and Right-of-Way (ROW) status. For bridge projects, information from MassDOT's Bridge section is given primary consideration when scheduling projects.
Transportation Evaluation Criteria
In 2003, the MPOs worked with the then Massachusetts Executive Office of Transportation and Public Works (EOTPW) to develop objective evaluation criteria that could be applied
to transportation projects in the Commonwealth. Early in 2004, EOTPW asked planning
staff from the then MassHighway Planning, the MassHighway district offices and the regional planning agencies to apply these criteria to projects within their respective Metropolitan Planning Organizations (MPOs). Application of these criteria include not only an evaluation of the magnitude of improvement in the condition, mobility, and safety of transportation projects, but also an evaluation of their community effects and support, the land use and economic development impact, and the environmental effects. A score valued from -3 to 3 is assigned to each of the criteria. In fact, there is at least one score associated with each of the FAST Act ten planning factors. The scores within each category are averaged and then the category averages are added together to reach the total score. The following chart illustrates the data and scoring criteria for each TEC element as well as the planning factors considered in each element, and which TEC
elements will be affected by performance measures.
Final FFYs 2021-2025 MVMPO TIP May 2020 41
Consideration of whether a project contributes to Climate Resiliency has been added to
the TEC process for the MVMPO 2021 to 2025 TIP in the Environmental Effects section of the evaluation form, under the Air Quality/Climate Effects scoring component. The project receives one point under this criteria if the project involves widening a culvert and the project receives one point if it raises a facility (for example a bridge, roadway or trail) in a
flood prone area.
Final FFYs 2021-2025 MVMPO TIP May 2020 42
TEC Element | Data | Scoring | Additional Notes | Planning Factors Con- sidered |
Condition | ||||
A. Magnitude of pavement condition im- provements | Use Pavement Condi- tion Index (PCI) (if available) to rate cur- rent condition as excel- lent, good, fair, or poor. If not available, use pavement condi- tion description from other sources. | Poor = 3 to 2 Fair = 2 to 1 Good = 1 to 2 Excellent = 0 to 1 | Pavement condi- tions often vary across the project limits, and therefore scores have a range. Excellent current condition may score a 1 if project is not expected to be pro- grammed for sev- eral years. | Preservation; Safety; Resili- ency & reliability; Economic Vitality. Contributes to meeting Pavement Performance Measure Targets of 70% In- terstate or 30% Non-Inter- state NHS Pavements in Good Condition and/or 4% max. Interstate or 30% max. Non-Interstate Pavements in Poor Condition Statewide |
B. Magnitude of improvement of other infra- structure | Types and number of upgrades | Major Upgrade such as widening a bridge = 3 Multiple upgrades from list of drainage im- provements, new side- walks, new signals, sig- nal upgrades, adding turn lanes, etc. = 3 to 2 One or two of above upgrades = 2 to 1 No Upgrades = 0 | Preservation; Safety; Resili- ency & reliability; Accessibil- ity & mobility; Environmental and economic sustainability; Enhance travel & tourism; Note that all roadway pro- jects consider drainage im- provements. |
Final FFYs 2021-2025 MVMPO TIP May 2020 43
TEC Element | Data | Scoring | Additional Notes | Planning Factors Con- sidered |
Mobility | ||||
A. Effect on magnitude and duration of congestion | Magnitude of current congestion, measured by Level of Service, traffic delays, or queue lengths, if available. If there is not currently congestion, then score is zero unless project causes congestion. | Significant reduction in congestion = 3 Moderate reduction in congestion = 2 Small reduction in con- gestion = 1 No change in conges- tion = 0 Small increase in con- gestion = -1 Moderate increase in congestion = -2 Significant increase in congestion = -3 | If there is not cur- rently congestion, then score is zero unless project causes new conges- tion. | Economic Vitality; Accessi- bility and Mobility; Resili- ency and reliability; En- hance travel and tourism. Contributes to meeting Sys- tem Performance Measure Targets of 68% Interstate or 80% Non-Interstate NHS person-miles travelled that are reliable Statewide and/or 1.85 Truck Travel Time Reliability Index Statewide |
B. Effect on travel time and connec- tivity / access | Types and numbers of upgrades, such as, im- proves travel time by widening shoulders, or signal improvements; provides new access, connects existing trails, etc. | Major Upgrade such as providing new roadway access = 3 Multiple upgrades from signal improvements, new sidewalks, adding turn lanes, new trail = 3 to 2 One or two of above upgrades, or new = 2 to 1 No Upgrades = 0 | Additional point (not above 3) if providing connectivity be- tween schools, busi- nesses, and other activity centers. | Economic Vitality; Accessi- bility and Mobility; Resili- ency and reliability; Connec- tivity; Enhance travel and tourism. |
Final FFYs 2021-2025 MVMPO TIP May 2020 44
TEC Element | Data | Scoring | Additional Notes | Planning Factors Considered |
Mobility (Cont.) | ||||
C. Effect on other modes using the fa- cility | Types and num- bers of upgrades to Other modes (means of travel) | Major Upgrade for Other mode of transportation = 3 Multiple upgrades from adding bike lanes, new sidewalks, wheelchair ramps, proximity to transit facilities = 3 to 2 One or two of above upgrades = 2 to 1 No Upgrades to Other modes = 0 | Economic Vitality; Safety; Security; Accessibility and Mobility; Environmental and economic sustainability; Connectivity; Resiliency and reliability; Enhance travel and tourism. Contributes to meeting Sys- tem Performance Measure Target of 34.5% Non-SOV travel on the NHS in the UZA | |
D. Effect on re- gional and lo- cal traffic | Whether affects traffic outside of the project limits lo- cally, and beyond that, regionally | Is on the NHS, a State num- bered route, connector, or highly traveled local road; and: Substantially improves traffic regionally = 3 Moderately improves traffic re- gionally = 2 to 1 Substantially or moderately im- proves traffic locally = 2 to 1 Neutral = 0 Negative scores if adversely af- fects traffic to the degrees and geography above. | Economic Vitality; Accessi- bility and Mobility; Efficient System Management; En- hance travel and tourism. |
Final FFYs 2021-2025 MVMPO TIP May 2020 45
TEC Element | Data | Scoring | Additional Notes | Planning Factors Considered |
Safety and Security | ||||
A. Effect on crash rate compared to State average | Whether location is designated a State defined Crash Cluster location (HSIP eligible) and the EPDO score assigned by that performance meas- ure, or crash rate compared to State average, other safety concerns | High EPDO score, crash clus- ter, Top 100 crash locations = 3 Higher than average crash rate/ EPDO score = 2 Lower than average crash rate, but safety concerns are being addressed = 1 No effect on crash rate = 0 | Safety; Efficient System Management; Resiliency and Reliability. Contributes to meeting HSIP and Safety Performance Measure Targets for number of fatalities and serious inju- ries, rates of fatality and se- rious injury Statewide on all public roads. | |
B. Effect on bicy- cle and pe- destrian safety | Includes improve- ments that effect bi- cycle and pedes- trian safety or is detrimental to pe- destrian bicycle safety. | Major Upgrade, separate bike lane, or shared use path = 3 Multiple upgrades from list of: widening shoulders for bikes; new or improved sidewalks; new pedestrian signals; wheel- chair ramps; etc. = 3 to 2 One or two of above upgrades = 2 to 1 No Upgrades = 0 Could use negative scores if detrimental to bike / pedestrian safety | Additional point (not above 3) if improvements are near schools or other areas fre- quented by bi- cyclists and/ or pedestrians, or there is a his- tory of crashes involving bikes and/or pedes- trians. | Safety; Resiliency and Reli- ability; Enhance Travel and Tourism. Contributes to meeting HSIP and Safety Performance Measure Targets for Num- ber of non-motorized fatali- ties and serious injuries Statewide on all public roads. |
Final FFYs 2021-2025 MVMPO TIP May 2020 46
TEC Element | Data | Scoring | Additional Notes | Planning Factors Considered |
Safety and Security (Cont.) | ||||
C. Effect on transpor- tation security and evacuation | Is on the NHS. Is a community desig- nated evacuation route. Is within 10 miles of a nuclear power plant. | Will significantly improve travel along an evacuation route = 3 Is an evacuation route within 10 miles of a nu- clear power plant, or is on the NHS and improves travel = 2 Is an evacuation route or Is within 10 miles of a nu- clear power plant, or in on the NHS = 1 Is not any of the 3 listed in the data column = 0 | Security; Safety. | |
Community Effects and Support | ||||
A. Residential effects: ROW, noise, aes- thetic, cut through traffic, and other. | Degree of effect on residential aspects. | Improves these aspects: Significantly = 3 Moderately = 2 Slightly = 1 No effect on these as- pects = 0 Creates negative effects from these aspects: Slightly = -1 Moderately = -2 Significantly = -3 | Environmental Sus- tainability; |
Final FFYs 2021-2025 MVMPO TIP May 2020 47
TEC Element | Data | Scoring | Additional Notes | Planning Factors Considered |
Community Effects and Support (Cont.) | ||||
B. Public, local government, legislative, and regional support | Degree of support. | Improves these aspects: Greatly Supported = 3 Moderately Supported = 2 Somewhat Supported = 1 Not Supported, or unknown = 0 Some Opposition = -1 | ||
C. Effect on ser- vice to minority or low-income neighborhoods. (Title VI and EJ) | Increased or de- creased service to Title VI and EJ neighborhoods | Improves service to Title VI or EJ neighborhoods: Signifi- cantly = 3 Moderately = 2 Slightly = 1 No effect on Title VI or EJ neighborhood = 0 Slightly decreased service = - 1 Moderately decreased service = - 2 Significantly decreased service = - 3 | Quality of Life; Acces- sibility and Mobility; Resiliency and Relia- bility; Enhance Travel and Tourism. |
Final FFYs 2021-2025 MVMPO TIP May 2020 48
TEC Element | Data | Scoring | Additional Notes | Planning Factors Considered |
Community Effects and Support (Cont.) | ||||
D. Other impacts / benefits to mi- nority or low-in- come neighbor- hoods. (Title VI and EJ) | Number / degree of positive or negative impacts to Title VI and EJ neighbor- hoods | Positive Impacts to Title VI or EJ neighborhoods: Signifi- cant = 3 Moderate = 2 Slight = 1 No effect on Title VI or EJ neighborhood = 0 Negative Impacts to Title VI or EJ neighborhoods: Slight = - 1 Moderate = - 2 Significant = - 3 | Quality of Life. | |
E. Effect on devel- opment and re- development of housing stock | Number / degree of positive or negative effects on develop- ment and redevel- opment of housing stock | Positive Impacts to develop- ment / redevelopment of hous- ing stock: Significant = 3 Moderate = 2 Slight = 1 No effect on development or redevelopment of housing stock = 0 Negative Impacts to develop- ment / redevelopment of hous- ing stock: Slight = - 1 Moderate = - 2 Significant = - 3 | Economic Vitality; Quality of Life. |
Final FFYs 2021-2025 MVMPO TIP May 2020 49
TEC Element | Data | Scoring | Additional Notes | Planning Factors Considered |
Land Use and Economic Development | ||||
A. Business ef- fects: ROW, noise, traffic, parking, freight access and other. | Degree of effect on business aspects. | Improves these aspects: Sig- nificantly = 3 Moderately = 2 Slightly = 1 No effect on these aspects = 0 Creates negative effects from these aspects: Slightly = -1 Moderately = -2 Significantly = -3 | Economic Vitality; Ac- cessibility and Mobil- ity. | |
B. Sustainable de- velopment ef- fects. Con- sistent with Mer- rimack Valley Priority Growth Strategy (MVPGS). | Number / degree of positive or negative effects on sustaina- ble development and proximity to State and/or Re- gional Priority De- velopment Areas (PDA) | Positive Impacts to sustainable development: Significant = 3 Moderate = 2 Slight = 1 No effect on development or redevelopment of housing stock = 0 Negative Impacts to develop- ment / redevelopment of hous- ing stock: Slight = - 1 Moderate = - 2 Significant = - 3 | Additional points, (not above 3) if lo- cated in or near a State or Regional Priority Develop- ment Area | Economic Vitality; Consistency with State and local planned growth. |
Final FFYs 2021-2025 MVMPO TIP May 2020 50
TEC Element | Data | Scoring | Additional Notes | Planning Factors Considered |
Land Use and Economic Development (Cont.) | ||||
C. Consistent with regional land- use and eco- nomic develop- ment plans and Merrimack Val- ley Priority Growth Strategy (MVPGS). | Degree of con- sistency with re- gional plans | Consistent with regional plans: Significantly = 3 Moderately = 2 Slightly = 1 Neutral = 0 Not Consistent with regional Plans: Slightly = - 1 Moderately = - 2 Significantly = - 3 | Additional points (not above 3) if lo- cated in or near a Regional Priority Development Area | Economic Vitality; Consistency with State and local planned growth and economic develop- ment plans. |
D. Effect on job creation. | Estimated job crea- tion | Effect on job creation: Significant = 3 Moderate = 2 Slight = 1 Neutral = 0 Elimination of jobs: Slight = - 1 Moderate = - 2 Significant = - 3 | Economic Vitality. |
Final FFYs 2021-2025 MVMPO TIP May 2020 51
TEC Element | Data | Scoring | Addi- tional Notes | Planning Factors Considered |
Environmental Effects | ||||
A. Air Quality / Climate effects | Green House Gas Analysis Results | Effect on Air Quality: Quantified decrease in emissions = 2 or 1 Qualitative decrease in emissions = 1 No effect on emissions = 0 Qualitative increase in emissions = -1 Quantified increase in emissions = - 2 or - 1 Climate Effects Resiliency: A culvert is being widened = 1 A facility (ex. bridge, road or trail) in a flood prone area is being raised = 1 | Protect and Enhance the Environment. Preservation; Resili- ency & reliability; Re- duce or mitigate stormwater impacts; Contributes to meet- ing CMAQ Perfor- mance Measure Tar- get of 18.3 Annual Hours of Peak Hour Excessive Delay (PHED) per Capita in the UZA | |
B. Water Quality / supply effects; wetlands ef- fects. | Number / degree of positive or nega- tive effects on wa- ter quality / supply effects; wetlands effects. | Effect on Water Quality / supply and wet- lands: Positive effect: Significant = 3 Moderate = 2 Slight = 1 Neutral = 0 Negative Effect: Slight = - 1 Moderate = - 2 Significant = - 3 | Protect and Enhance the Environment; Re- duce or mitigate stormwater impacts. |
Final FFYs 2021-2025 MVMPO TIP May 2020 52
TEC Element | Data | Scoring | Addi- tional Notes | Planning Fac- tors Considered |
Environmental Effects (Cont.) | ||||
C. Historic and cultural re- source effects | Proximity / degree of positive or nega- tive effects on his- toric and cultural resources | Positive effect on historic and cultural re- sources: Significant = 3 Moderate = 2 Slight = 1 Neutral = 0 Negative Effect: Slight = - 1 Moderate = - 2 Significant = - 3 | Often con- siders im- proved ac- cess to nearby re- sources. | Economic Vitality; Accessibility and Mo- bility; Quality of Life; Enhance Travel and Tourism. |
D. Effect on wild- life habitat and endangered species. | Location of project in State Estimated Habitat of Rare Wildlife or State Priority Habitat of Rare Species | Positive effect on wildlife or endangered species in a State designated area: Significant = 3 Moderate = 2 Slight = 1 Not in a wildlife or endangered species area = 0 Negative effect on wildlife or endanger species in a State designated area.: Slight = - 1 Moderate = - 2 Significant = - 3 | Protect and Enhance the Environment. |
Final FFYs 2021-2025 MVMPO TIP May 2020 53
The resulting Transportation Evaluation Criteria (TEC) scores for selected projects in the Merrimack Valley region that were derived by applying these criteria are shown in Appendix C. It is the goal of the MVMPO that these criteria ratings, along with information related to the readiness of projects, will make the planning process, and more specifically, the selection and prioritization of projects, more transparent to the general public. A sample project evaluation sheet showing the various criteria is in Appendix D.
The use of these TEC scores also allows the Merrimack Valley MPO to meet FAST Act re- quirements for programming Transportation Alternatives (TA) funding (similar to TAP fund- ing from the previous legislation). TA funding is a set-aside of Surface Transportation
Block Grant Programming (STBG) through a competitive process and, in general, helps to
manage performance by focusing available funding on the highest regional priorities. It also helps to draw attention to the reader that FAST Act is a very Performance Measure - oriented piece of legislation.
The principal objective of this document is the provision of an additional point for public access to and review of the transportation planning process. This FFYs 2021-2025
Transportation Improvement Program was developed in accordance with the Public Participation Process established for the Merrimack Valley Metropolitan Planning Organization (MVMPO). The MVMPO amended its current Public Involvement Process in March of 2017, it is contained in the MVMPO Public Participation Plan as Amended through March 2017 on the MVPC website under Transportation Reports. The Process applies to the development of the Transportation Improvement Program (TIP), the Regional Transportation Plan (RTP) and the Unified Planning Work Program (UPWP). The Public Involvement Process endorsed by the MVMPO is also used by the MVRTA as its public involvement process. The notice of public involvement and time established for review and comment for the development of this TIP satisfies the Program of Project requirements established by the Federal Transit Administration (FTA).
The Merrimack Valley MPO’s Public Participation Plan as amended through March 2017, reflects the consultation requirements identified in the FAST Act of 2015 and prior federal transportation authorizations, and the existing transportation planning regulations developed by the U.S. Department of Transportation for the develop- ment of Regional Transportation Plans and Transportation Improvement Programs. This document identifies a number of stakeholders to be consulted in developing these docu- ments. In developing the Draft FFYs 2021-2025 Transportation Improvement Program, all
MVMPO stakeholders were given notice that the process of developing the FFYs 2021-
Final FFYs 2021-2025 MVMPO TIP May 2020 54
2025 TIP was beginning. Stakeholders were also notified of the availability of the draft doc- ument for public review and comment.
Listed below are categories of interested individuals, organizations and other stakeholders (Interested Parties) identified by the MVMPO for inclusion in the PPP. They are defined based on the individual groups identified in the FAST Act of 2015 and prior federal trans- portation authorizations, and the existing transportation planning regulations developed by the U.S. Department of Transportation.
The MVMPO continues to add individuals, organizations or other stakeholders to this list and their addition is not considered an act requiring the formal amendment of the PPP. Similarly, any of the individuals or organizations identified below may request to be re- moved from the mailing list and such action does not necessitate a formal PPP amend- ment.
Individuals, including:
• Interested individuals, business persons
• Merrimack Valley Transportation Committee (MVTC) members
• Libraries
• City/Town Clerks
• MVMPO Region Congressional Delegation
• MVMPO Region Legislative Delegation
Affected public agencies, including:
• Boards of Selectmen / City Councils
• Chief Elected Officials
• City and Town Engineers
• Federal Emergency Management Agency
• Federal Highway Administration
• Federal Transit Administration
• Greater Derry-Salem Cooperative Alliance for Regional Transportation
(CART)
• Local Departments of Public Works
• Local Police Departments
• Local Traffic and Safety Committees
Final FFYs 2021-2025 MVMPO TIP May 2020 55
• Massachusetts Department of Environmental Protection
• MBTA Commuter Rail Officials
• Massachusetts Executive Office of Housing and Economic Development
• Massachusetts Executive Office of Public Safety and Security
• MassDOT
• Merrimack Valley Regional Transit Authority
• Metropolitan Area Planning Council
• Nashua Regional Planning Commission
• Rockingham Planning Commission
• U.S. Environmental Protection Agency
Representatives of public transportation employees, including:
• Truck Driver’s Union Local #170
Freight shippers, including:
• P.J. Murphy Transportation
• JB Hunt
• Estes Express
• Shaheen Brothers
• ABF Freight
• PanAm Railways
• Bonney’s Express
Providers of freight transportation services, including:
• United Parcel Service
• Federal Express
Final FFYs 2021-2025 MVMPO TIP May 2020 56
Private profit- and non-profit providers of transportation in the
region, including:
• Assist Incorporated
• C&J Transportation
• Cape Ann Transit Authority (CATA)
• Central Wheelchair and Van Transportation
• EMT Corporation
• Local Taxi Companies
• Northern Essex Elder Transportation (NEET)
• Other Transportation Providers Identified in the Regional Transportation Plan
• The Coach Company
• TransCare
Representatives of users of public transportation, including:
• American Training, Inc.
• Cambridge College
• Community Action Incorporated (CAI)
• Emmaus, Inc.
• Elder Services of the Merrimack Valley
• Local Senior Centers/Councils on Aging
• Northeast Independent Living Program
• Merrimack College
• Merrimack Valley Hospice
• Merrimack Valley Workforce Investment Board, Inc.
• Northern Essex Community College
• Office of Employment Services
Representatives of bicyclist and pedestrian advocacy organizations, including:
• Andover Trails Committee
• Bay Circuit Alliance
• Coastal Trails Coalition
• Essex National Heritage Commission
• Essex County Trail Association
• Groveland Open Space and Recreation Committee
Final FFYs 2021-2025 MVMPO TIP May 2020 57
• MassBike
• Merrimack Valley Off-Road Trails Committee
Representatives for the community of individuals with disabilities, including:
• Executive Office of Health and Human Services
• Northeast Independent Living Program
• Department of Mental Health
• Massachusetts Commission for the Blind
• Area Nursing Homes
• United Cerebral Palsy
• CLASS Inc.
• Fidelity House
• Association of Retarded Persons (ARC)
Organizations and facilities that serve low-income and minority households who traditionally have been underserved by existing transportation systems and may face challenges accessing employment and other services, includ- ing:
• MVRTA Transit Centers in Amesbury, Haverhill and Lawrence (post notices)
• Social Security Offices
• Employment Offices (post notices)
• Ethnic, Civic/Social, Faith-Based and Veterans Organizations
• Merrimack Valley Goodwill
• Area Hospitals
• Salvation Army
• Groundwork Lawrence
• Lawrence Community Works
• United Way of the Merrimack Valley
• Methuen Arlington Neighborhood, Inc.
• YMCA/YWCA
Final FFYs 2021-2025 MVMPO TIP May 2020 58
Agencies and officials responsible for other planning activities within the MPA
that are affected by transportation, including:
a. State and local planned growth:
1. Area Planning Boards
2. Mass Development
3. Merrimack Valley Transportation Management Association
4. The Junction Transportation Management Organization
b. Economic development:
1. Chambers of Commerce
2. Economic Development Administration
3. Local Community Development Directors
4. Merrimack Valley Economic Development Council
c. Environmental agencies and federal lands:
1. Andover Village Improvement Society (AVIS)
2. Essex County Greenbelt Association
3. Local Conservation Commissions
4. MassRiverways
5. Merrimack River Watershed Council
6. National Park Service
7. Powwow River Watershed Association
8. Parker River Clean Water Association
9. Shawsheen River Watershed Association
10. Trustees of Reservations
11. U.S. Environmental Protection Agency (EPA)
12. U.S. Fish and Wildlife Service
d. Airport operations:
1. Lawrence Airport Commission
e. Other Interested Parties
1. Conservation Law Foundation
The notices were sent directly to almost 500 email addressees representing these groups. Notices were put in newspapers and on cable community television directing the public to
the MVPC website which contained the notice and the materials for review.
Final FFYs 2021-2025 MVMPO TIP May 2020 59
In addition to these direct mailings, and in accordance with this process, public notice of the Draft FFYs 2021-2025 Transportation Improvement Program was published in the Lawrence Eagle Tribune, Newburyport Daily News, Haverhill Gazette (Published Weekly) and Rumbo News informing the public of its right to comment on the document which would be available on the MVPC website from May 1, 2020 through May 21, 2020. It said
that comments would be received through May 21, 2020 and that two separate Virtual pub- lic hearings on the document would take place on May 13, 2020 from 1:00 p.m. to 2:00
p.m. and from 6:00 p.m. to 7:00 p.m. The meetings were held Virtually due to COVID-19
Virus restrictions. The MVMPO will summarize comments that are received during the 21- day review and comment period and will include this summary in the Final FFYs 2021-
2025 TIP.
Public input in developing the TIP was sought at the following meetings in 2019 and 2020:
• October 23, 2019, January 22, 2020, February 26, 2020, March 25, 2020 (held Virtually due to COVID-19 Virus restrictions), April 22,2020 (held Virtually due to COVID-19 Virus restrictions) and May 27,2020 (held Virtually due to COVID-19
Virus restrictions) MVMPO Meetings;
• February 6, 2020, March 5, 2020 and May 7, 2020 (held Virtually due to COVID-
19 restrictions) MVRTA Advisory Board meetings held at the MVRTA Office;
• February 20, 2020, April 16, 2020 (held Virtually due to COVID-19 Virus restrictions) and May 21, 2020 (held Virtually due to COVID-19 Virus restrictions) Merrimack Valley Planning Commission (MVPC) meetings;
• February 12, 2020 DPW Directors/Stormwater Collaborative Meeting
• May 1, 2020 Community Planners Meeting (held Virtually due to COVID-19
Virus restrictions)
The above meetings were held at the Merrimack Valley Planning Commission unless otherwise stated.
Final FFYs 2021-2025 MVMPO TIP May 2020 60
Changes being made starting with the FFYs 2021 to 2025 TIP
A few changes have been made to the TIP Amendment/ Adjustment procedures beginning with the FFYs 2021 to 2025 TIP to align with MassDOT’s Amendment procedures for the State Transportation Improvement Program (STIP). The changes are:
• Cost change thresholds constituting a Major change requiring an Amendment will apply to decreases in cost, as well as increases, approved by MassDOT Office of Transportation Planning (OTP), and will apply to projects in any Fiscal Year, not just Fiscal Year 1;
• Moving a project between any years, not just advancement of other than a Fiscal
Year 2 project, requires an Amendment.
• Major change in project/ project phase initiation dates or design has been changed to major change in project scope large enough to necessitate an additional review by MassDOT’s Project Review Committee (PRC) typically accompanied by major project cost change.
• Adding Exceptions to these procedures and Exception to 21-day review period. (See final paragraph of the Procedures below.)
Resulting Procedures
The following amendment/adjustment procedures are hereby adopted to consist of the following:
Adjustments
Minor adjustments to the TIP do not require formal MPO action and can be made via the administrative action of the Merrimack Valley MPO. These minor adjustments are limited
to:
• Changing the scope and description of a project as long as they are minor changes;
• Changing funding amounts that are less than a ten percent increase in project cost if project cost is more than $5 million dollars;
• Changing funding amounts that are an increase of less than $500,000 if project cost is $5 million dollars or less;
• Changing funding sources.
Final FFYs 2021-2025 MVMPO TIP May 2020 61
Amendments
Major changes continue to require MPO action through the formal amendment process. Major changes would require a twenty-one-day public review and comment period that includes a public hearing. These changes include, but are not limited to:
• Moving a currently programmed project earlier or later than an originally programmed year;
• MassDOT Office of Transportation Planning (OTP) approved ten percent or more increases, or decreases, in the construction cost estimate for a project costing more than $5 million dollars;
• MassDOT OTP approved project cost increase, or decrease, of $500,000 or more, in the construction cost estimate for a project costing $5 million dollars or less;
• Adding a new project.
• Deleting a project
• Major change in project scope large enough to necessitate an additional review by MassDOT’s Project Review Committee (PRC) – typically accompanied by major project cost change.
• Exceptions
Although the MVMPO typically holds a 21-day public comment period for amendments, in the event of extenuating circumstances beyond the agency’s control, the comment period may be shortened or waived in consultation with FHWA Division Office and/or the FTA Regional Office. Additionally, MassDOT may make exceptions to the procedures outlined above and treat amendments as adjustments and/or adjustments as administrative modifications, but these exceptions will also require coordination with and concurrence by MassDOT’s
federal partners and the affected MPO.
Final FFYs 2021-2025 MVMPO TIP May 2020 62
SAFETEA-LU contained a number of earmarked transportation projects that were to receive federal funding. Specific funding amounts were obligated to each of these projects, but no additional funding was included in SAFETEA-LU to complete them. Consequently, states with these projects must implement them within the annual federal authorization limits established in the legislation. The Merrimack Valley region contains eleven such
projects which are shown below along with their status:
Highway High Priority Projects | Status |
Amesbury/Newburyport – Rehabilitation of I-95 Whittier Bridge | Project Complete |
Andover – Design, Engineering and Construction at I-93 The Junction Interchange, (Andover, Tewksbury, and Wilmington) | Project Deactivated |
Haverhill – Construct Haverhill intermodal center access and vehicle capacity improvements. | Project Complete |
Lawrence – Design and construct Canal and Union Street Corridor improvements. | Project Complete |
Lawrence – Construct access improvements to the Lawrence Gateway Project. | Project Complete |
Methuen – Design, engineering and construction of Methuen Rotary alternative at I-93 and Routes 110 and 113. | Project Complete |
Newbury – Rehabilitation and paving of Parker River Road | Project Complete |
North Andover – Improvements to Mass. Ave., Andover St., Osgood St., Salem St and Johnson St. in the Old Town Center of North Andover | Project Complete |
Parker River National Wildlife Refuge – Preliminary engineering for Rehabilitation and paving of Sunset Drive in National Wildlife Refuge | Project Complete |
Salisbury to Boxford – Design, Engineer, Permit and Construct “Border to Boston Bikeway” rail trail project | Project Under Design |
Final FFYs 2021-2025 MVMPO TIP May 2020 63
Transit Projects for Bus and Bus-Related Facilities and Clean Fuels Grant Program | Status |
Haverhill – Design and Construct Intermodal Transit Parking Improvements. | Project Complete (see above) |
Lawrence – Gateway Intermodal and Quadrant Area Reuse Project. | Project Complete (see above) |
Newburyport – Design and Construct Intermodal Facility | Project Complete |
Final FFYs 2021-2025 MVMPO TIP May 2020 64
Advance Construction is a Federal-aid fund management tool, which as described by the
Federal Highway Administration website:
“…allows states to begin a project even in the absence of sufficient Federal-aid obligation authority to cover the Federal share of project costs. It is codified in Title 23, Section 115. Advance construction eliminates the need to set aside full obligational authority before starting projects…At some future date when the state does have sufficient obligational authority, it may convert an advance-constructed project to a Federal-aid project by obligating the permissible share of its Federal-aid funds and receiving subsequent reimbursements.”
In other words, the state pays for the project with non-Federal-aid funds to begin with and can later seek reimbursement of the Federal share of the funding category’s project cost by obligating Federal-aid funding in future years.
Projects must meet the following criteria before they can be designated to use the Advanced
Construction (AC) funding mechanism:
1. The project’s estimated Federal participating cost exceeds the total regional annual target (i.e. sum of HSIP, CMAQ, TA and Non HSIP/CMAQ/TA), and
2. Construction, based on an engineering review of the project, will take place during all the years for which federal funding is programmed.
The following projects are programmed in the FFY 2021-2025 TIP using this Advance
Construction (AC) method:
Haverhill – Bridge Replacement, H-12-039, I-495 (NB & SB) over Merrimack
River
North Andover- Corridor Improvements on Route 114, between Rt 125 (Andover St)
& Stop & Shop Driveway
Haverhill - Bridge Replacement, H-12-040, I-495 (NB & SB) over Merrimack
River
Haverhill - Bridge Replacement, H-12-007 & H-12-025, Bridge Street (SR 125) over Merrimack River and the Abandoned B&M RR (Proposed Bikeway)
Andover - Bridge Rehabilitation, A-09-036, I-495 over St 28 (SB), A-09-037, I-
495 over B&M and MBTA, A-09-041, I-495 over St 28 (NB)
Final FFYs 2021-2025 MVMPO TIP May 2020 65
Projects listed in the TIP must show the sources of funding that will be used to complete the project. The projects in the FFYs 2021 -2025 TIP are slated to use funding from the following Federal-aid funding programs identified in the FAST Act federal transportation funding authorization. Please note that in some cases Federal-aid funding is from older funding programs established in earlier legislation such as SAFETEA-LU and MAP-21. Projects may also receive non-Federal Aid funding which is shown in the project listings.
Bridge Replacement and Rehabilitation ((BR) (continued in FAST Act)) - funds replacement and repair of Structurally Deficient or unsafe bridges in urban and rural areas on any public road. Bridges can be on the federal aid system (BR ON) or off system (BR OFF).
Funding: Federal - 80%, State - 20%
Congestion Mitigation and Air Quality Improvement Program ((CMAQ) (continued in FAST Act) – funds projects that reduce congestion and improve air quality.
Funding: Federal - 80%, State - 20%
High Priority Projects (HPP) (Carryover from SAFETEA-LU) – funds up to 80% of the costs of specific transportation projects identified in SAFETEA-LU. These projects have a separate allocation, but do not receive additional funds, and are therefore subject to the state’s federal authorization limit.
Funding: Federal- 80%, State – 20%
Highway Safety Improvement Program ((HSIP) (continued in FAST Act)) - funds safety improvement projects at high crash locations and Railway-Highway Crossings.
Funding: Federal - 90%, State – 10%
National Highway Performance Program (NHPP) (continued in FAST Act) - funds projects on all National Highway System Roadways.
Funding: Varies, generally Federal - 80%, State – 20%, but for the Interstate System, Federal - 90%, State – 10%
Non-Federal Aid (NFA) - funds construction, reconstruction, and improvement projects on roads and bridges in urban and rural areas.
Funding: State - 100% (Transportation Bond Bill), or Private - 100%
Final FFYs 2021-2025 MVMPO TIP May 2020 66
Surface Transportation Block Grant Program (STBG) (STP) – (also known as the Surface Transportation Program (STP) from previous legislation) - funding for any Federal-aid highway, bridge and tunnel projects on any public road, pedestrian and bicycle infrastructure, and transit capital projects, including intercity bus terminals.
STP Enhancements ((STP E) ((SAFETEA-LU; not continued in MAP-21)) - a portion of Surface Transportation Program funding for enhancement projects chosen by states and localities.
Funding: Federal -80%, State - 20%
Transportation Alternatives Program (TAP) – (MAP-21, replaced in FAST Act with Transportation Alternatives (TA) set aside of STBG funds) - funds for projects which can be defined as transportation alternatives including bicycle and pedestrian facilities, enhanced mobility, community improvements, environmental mitigations, and various other types of transportation alternatives as defined in FAST Act.
Funding: Federal - 80%, State - 20%
Final FFYs 2021-2025 MVMPO TIP May 2020 67
Projects from the following Federal-aid (FAST Act) and non-Federal-aid funding categories are shown in the FFY 2021-2025 TIP.
Section 5307 (Capital and Planning) (continued in FAST Act) - funds routine capital projects and planning assistance in urban areas. This is an urban formula grant program for MVRTA Preventative Maintenance and ADA costs.
Funding: Federal - 80%, State - 20% (Bond Issue Funds) (capital and planning
expenses)
State funding for the MVRTA's operating budget is provided through an agreement with the
Transit Division of MassDOT. Local funds are derived from community assessments based on the number of route miles and special services operated within each community.
The Merrimack Valley Planning Commission will provide the 20% match for the planning activities it will conduct for the Merrimack Valley Regional Transit Authority under its Section 5307 transit planning contract with the Authority.
Section 5309 (continued in FAST Act) - funds capital projects in urban areas which can be characterized as major capital investments in public transportation equipment and facilities. This is a discretionary grant program.
Funding: Federal - 80%, State - 20% (Transportation Bond Issue)
Section 5310 (continued in FAST Act))- provides capital funds, through the State, to private non-profit corporations and organizations to assist them in providing transportation services to meet the special needs of elderly and disabled persons.
Funding: Federal - 80%, Funding Applicant - 20%
Section 5339 (continued in FAST Act) - provides capital funds, through the State, for bus and bus related equipment and facilities.
Funding: Federal - 80%, Funding Applicant - 20%
Final FFYs 2021-2025 MVMPO TIP May 2020 68
The TIP includes sections that identify the MPO’s priority road and bridge projects using a format prescribed by MassDOT’s Office of Transportation Planning. MassDOT is aligning the FFYs 2021 to 2025 Statewide Transportation Improvement Program (STIP) with the MassDOT Capital Investment Plan (CIP). The CIP identifies three capital planning priorities: reliability, modernization and expansion investments. The STIP will now align program names with CIP investment priorities as follows:
Reliability
• Bridge program (including investments in inspections, systematic maintenance, on- system NHS bridges, on-system non-NHS bridges, and off-system bridges)
• Interstate pavement program
• Non-Interstate DOT pavement program
• Roadway improvements program
• Safety improvements program
Modernization
• ADA retrofits program
• Intersection improvements program
• Intelligent Transportation Systems program
• Roadway reconstruction program
Expansion
• Bicycles and Pedestrians program
• Capacity program
For the FFYs 2021 to 2025 TIP, the Regional Target funding amounts, distributed via statewide formula to the regions across the state, are initially programmed by the regions as STBG (also known as STP) funding category projects and MassDOT will inform regions if projects are to be partitioned by the HSIP, CMAQ and TAP categories.
Section 1A / Regionally Prioritized Projects
• Federal-Aid STBG Projects Using MVMPO Target Authority (STBG)
• Federal-Aid HSIP Projects Using MVMPO Target (HSIP)
• Federal-Aid CMAQ Projects Using MVMPO Target (CMAQ)
• Federal-Aid TAP (now set aside of STBG funding) Projects Using MVMPO Target
(TAP)
Final FFYs 2021-2025 MVMPO TIP May 2020 69
Section 1B / Earmark or Discretionary Grant Funded Projects (Provided by MassDOT)
• Federal-Aid Earmark or Discretionary Grant Funded Projects
Section 2A / State Prioritized Reliability Projects (Provided by MassDOT)
• Bridge Program / Inspections
• Bridge Program / Off-System
• Bridge Program / On-System (NHS)
• Bridge Program / On-System (Non-NHS)
• Bridge Program / Systematic Maintenance
• Interstate Pavement
• Non-Interstate Pavement
• Roadway Improvements
• Safety Improvements
Section 2B / State Prioritized Modernization Projects (Provided by MassDOT)
• ADA Retrofits
• Intersection Improvements
• Intelligent Transportation Systems
• Roadway Reconstruction
Section 2C / State Prioritized Expansion Projects (Provided by MassDOT)
• Bicycles and Pedestrians
• Capacity
Section 3 / Planning / Adjustments / Pass-throughs (Provided by MassDOT)
• Planning / Adjustments / Pass-throughs
Section 4 / Non-Federally Aided Projects (Provided by MassDOT)
• Non-Federal Aid
Final FFYs 2021-2025 MVMPO TIP May 2020 70
Each highway project in the TIP contains the following information:
Amendment/Adjustment Type – used to identify the type of amendment when changes are made to the document.
STIP Program – STIP program names as defined in the Organization of Highway Project
Listings section above.
MassDOT Project ID - project identification numbers given by MassDOT for each highway and bridge project.
MPO – identifies the Metropolitan Planning Organization within which the project is located.
Municipality Name – identifies the community where the project is located.
MassDOT Project Description–includes the community, or communities, in which the project is located and a brief description of work to be funded under the project. This description is exactly the same as MassDOT has input to its project information pages.
MassDOT District -MassDOT highway district number (Merrimack Valley MPO is part of
District 4);
Funding Source - abbreviation for the funding category from which funding is expected. (Funding categories and abbreviations are explained at the beginning of Part A.8.);
Total Programmed Funds- estimated cost of project in Fiscal Year in which advertising is expected; *
Federal Funds – portion of Total Programmed Funds provided by Federal Funding;
Non-Federal Funds– portion of Total Programmed Funds not provided by Federal Funding, but required as matching funds in order to receive Federal Funds;
Additional Information - a) Planning / Design / Construction; b) total project cost and funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-State Non-Federal match; g) earmark details; h) TAP project proponent; i) other information.
* Inflation increases project costs and therefore the project costs have been increased by
4% each future year of the TIP.
Final FFYs 2021-2025 MVMPO TIP May 2020 71
Each transit project in the TIP contains the following information: Project Number – Transit Project number from MassDOT
Agency – MVRTA (Merrimack Valley Regional Transit Authority) is the regional transit authority;
Line Item – The FTA Line Item number
Project Description – a brief description of work to be funded under the project;
Carry Over – indicates whether Carry over funding is being used;
Federal Funds – Portion of Total Programmed Funds provided by Federal Funding;
RTACAP – Regional Transit Authority State Capital Assistance - portion of Total Programmed Funds not provided by Federal Funding, but required as matching funds in order to receive Federal Funds, coming from State source;
SCA – State Contract Assistance - portion of Total Programmed Funds not provided by Federal Funding, but required as matching funds in order to receive Federal Funds, coming from State source;
TDC –Transportation Development Credits, and
Local Funds – portion of Total Programmed Funds not provided by Federal Funding but required as matching funds in order to receive Federal Funds, coming from local funding sources other than State funding sources.
Total - estimated total cost of project.
Final FFYs 2021-2025 MVMPO TIP May 2020 72
Final FFYs 2021-2025 MVMPO TIP May 2020 73
Merrimack Valley Region Program
STIP: 2021 - 2025 (D) | ||||||||||
Other Information ▼ Present information as follows, if applicable: MassDOT Funding Total Federal Non-Federal a) Planning / Design / or Construction; b) total project cost and Program Project ID MPO Municipality MassDOT Project Description District Source Programmed Funds Funds funding sources used; c) advance construction status; d) MPO project Funds score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information | ||||||||||
Federal 2021 Fiscal Year | ||||||||||
Section 1A / Regionally Prioritized Projects $10,346,830 $8,277,464 $2,069,366 | ||||||||||
Bicycle and Pedestrian | 608298 | Merrimack Valley | Groveland | GROVELAND- GROVELAND COMMUNITY TRAIL, FROM MAIN STREET TO KING STREET | 4 | STBG | $1,984,861 | $1,587,889 | $396,972 | a) Construction; b) $1,984,861 STBG; d) TEC = 4.87 out of 18. |
Roadway Reconstructi on | 608761 | Merrimack Valley | Haverhill | HAVERHILL- INTERSECTION RECONSTRUCTION ON ROUTE 108 (NEWTON ROAD) AT ROUTE 110 (KENOZA AVENUE AND AMESBURY ROAD) | 4 | STBG | $1,980,067 | $1,584,054 | $396,013 | a) Construction; b) $1,980,067 STBG; d) TEC = 8.87 out of 18. |
Roadway Reconstructi on | 609251 | Merrimack Valley | Lawrence | LAWRENCE- INTERSECTION IMPROVEMENTS AT SOUTH BROADWAY (ROUTE 28) AND MOUNT VERNON STREET | 4 | STBG | $1,013,739 | $810,991 | $202,748 | a) Construction; b) $1,013,739 STBG; d) TEC = 7.02 out of 18. |
Bicycle and Pedestrian | 610663 | Merrimack Valley | Newburyport | NEWBURYPORT- RIVERFRONT CLIPPER CITY RAIL TRAIL CONSTRUCTION | 4 | STBG | $1,900,802 | $1,520,642 | $380,160 | a) Construction; b) $1,900,802 STBG; d) TEC = 7.00 out of 18. |
Flex to FTA | S10777 | Merrimack Valley | MVRTA FLEX TO FTA TO REPLACE YR 2009 BUSES WITH NEW BUSES DELIVERY 2022 (7 of 9) | STBG | $3,467,361 | $2,773,889 | $693,472 | b) $3,467,361 STBG; e) FTA. | ||
STBG Programmed $10,346,830 $8,277,464 $2,069,366 |
Target Funds Available for Merrimack Valley Region Projects $431,823 $345,458 $86,365 | ||||||||||
Section 2A / State Prioritized Reliability Projects $15,305,880 $12,244,704 $3,061,176 | ||||||||||
Bridge On- system NHS | 605306 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 039, I-495 (NB & SB) OVER MERRIMACK RIVER | 4 | NHPP | $15,305,880 | $12,244,704 | $3,061,176 | Project ACd over 2018-2023. |
* Only includes funds counting against obligation authority
Final FFYs 2021-2025 MVMPO TIP May 2020 74
Merrimack Valley Region Program
STIP: 2021 - 2025 (D) | ||||||||||
Other Information ▼ Present information as follows, if applicable: MassDOT Funding Total Programmed Non-Federal a) Planning / Design / or Construction; b) total project cost and Program Project ID MPO Municipality MassDOT Project Description District Source Funds Federal Funds Funds funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information | ||||||||||
Federal Fiscal 2022 Year | ||||||||||
Section 1A / Regionally Prioritized Projects $2,578,160 $2,062,528 $515,632 | ||||||||||
Intersection Improvements | 609509 | Merrimack Valley | Lawrence | LAWRENCE- INTERSECTION IMPROVEMENTS AT MERRIMACK STREET AND SOUTH BROADWAY (ROUTE 28) | 4 | STBG | $1,610,960 | $1,288,768 | $322,192 | a) Construction; b) $1,610,960 STBG (inflated 4% from 2021 cost); d) TEC = 10.7 out of 18. |
Intersection Improvements | 610658 | Merrimack Valley | Methuen | METHUEN- INTERSECTION IMPROVEMENTS AT RIVERSIDE DRIVE AND BURNHAM ROAD | 4 | STBG | $967,200 | $773,760 | $193,440 | a) Construction; b) $967,200 STBG (inflated 4% from 2021 cost); d) TEC = 6.52 out of 18. |
STBG Programmed $2,578,160 $2,062,528 $515,632 |
Target Funds Available for Merrimack Valley Region Projects $8,419,971 $6,735,977 $1,683,994 | ||||||||||
Section 2A / State Prioritized Reliability Projects $28,010,883 $22,408,706 $5,602,177 | ||||||||||
Non-Interstate Pavement | 608494 | Merrimack Valley | Multiple | NEWBURY- NEWBURYPORT- SALISBURY- RESURFACING AND RELATED WORK ON ROUTE 1 | 4 | NHPP | $9,807,200 | $7,845,760 | $1,961,440 | a) Construction; b) 9,807,200 NHPP (inflated 4% from 2021 cost). |
Bridge On- system NHS | 605306 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 039, I-495 (NB & SB) OVER MERRIMACK RIVER | 4 | NHPP | $18,203,683 | $14,562,946 | $3,640,737 | Project ACd over 2018-2023. |
Section 2C / State Prioritized Expansion Projects $2,520,436 $2,016,349 $504,087 | ||||||||||
Bicycle and Pedestrian | 607541 | Merrimack Valley | Multiple | GEORGETOWN- BOXFORD- BORDER TO BOSTON TRAIL, FROM GEORGETOWN ROAD TO WEST MAIN STREET (ROUTE 97) | 4 | CMAQ | $2,520,436 | $2,016,349 | $504,087 | a) Construction; b) $2,423,496 CMAQ (inflated 4% from 2021 cost); d) TEC = 5.22. |
* Only includes funds counting against obligation authority
Final FFYs 2021-2025 MVMPO TIP May 2020 75
Merrimack Valley Region Program
STIP: 2021 - 2025 (D) | ||||||||||
Other Information ▼ Present information as follows, if applicable: MassDOT Total a) Planning / Design / or Construction; b) total project cost and Program MPO Municipality MassDOT Project Description District Funding Programmed Federal Non-Federal funding sources used; c) advance construction status; d) MPO project Project ID Source Funds Funds Funds score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information | ||||||||||
Federal Fiscal 2023 Year | ||||||||||
Section 1A / Regionally Prioritized Projects $11,238,340 $8,990,672 $2,247,668 | ||||||||||
Roadway Reconstruction | 602202 | Merrimack Valley | Salisbury | SALISBURY- RECONSTRUCTION OF ROUTE 1 (LAFAYETTE ROAD) | 4 | STBG | $6,837,284 | $5,469,827 | $1,367,457 | a) Construction; b) $6,837,285 (Inflated 8% from 2021 cost); d) TEC = 8.93 out of 18. |
Roadway Reconstruction | 608095 | Merrimack Valley | North Andover | NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN ROUTE 125 (ANDOVER STREET) & STOP & SHOP DRIVEWAY | 4 | STBG | $4,401,056 | $3,520,845 | $880,211 | a) Construction; b) $27,061,794 (Inflated 8% from 2021 cost) = FFY 2023 ($4,401,056) + FFY 2024 ($11,385,638) + FFY 2025 ($11,119,839)+ beyond 2025 ($155,261); c) A/C Years 1-4 FFY 2023- 2026; d)TEC = 11.32 out of 18. |
STBG Programmed $11,238,340 $8,990,672 $2,247,668 |
Target Funds Available for Merrimack Valley Region Projects $0 $0 $0 | ||||||||||
Section 2A / State Prioritized Reliability Projects $30,859,874 $24,687,899 $6,171,975 | ||||||||||
Bridge On- system NHS | 605306 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 039, I-495 (NB & SB) OVER MERRIMACK RIVER | 4 | NHPP | $12,994,233 | $10,395,386 | $2,598,847 | Project ACd over 2018-2023. |
Bridge On- system NHS | 609466 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 040, I-495 (NB & SB) OVER MERRIMACK RIVER | 4 | NHPP | $17,865,641 | $14,292,513 | $3,573,128 | Project ACd over 2023-2026. |
Section 2C / State Prioritized Expansion Projects $16,087,005 $12,869,604 $3,217,401 | ||||||||||
Bicycle and Pedestrian | 608930 | Merrimack Valley | Lawrence | LAWRENCE- LAWRENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL | 4 | CMAQ | $16,087,005 | $12,869,604 | $3,217,401 | a) Construction; b) $16,087,005 CMAQ (inflated 8% from 2021 cost); d) TEC = 11.25 out of 18. |
* Only includes funds counting against obligation authority
Final FFYs 2021-2025 MVMPO TIP May 2020 76
Merrimack Valley Region Program
STIP: 2021 - 2025 (D) | ||||||||||
Other Information ▼ Present information as follows, if applicable: MassDOT a) Planning / Design / or Construction; b) total project cost and Program MPO Municipality MassDOT Project Description District Funding Source Total Programmed Federal Funds Non-Federal funding sources used; c) advance construction status; d) MPO project Project ID Funds Funds score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information | ||||||||||
Federal Fiscal 2024 Year | ||||||||||
Section 1A / Regionally Prioritized Projects $11,385,638 $9,108,510 $2,277,128 | ||||||||||
Roadway Reconstruction | 608095 | Merrimack Valley | North Andover | NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN ROUTE 125 (ANDOVER STREET) & STOP & SHOP DRIVEWAY | 4 | STBG | $11,385,638 | $9,108,510 | $2,277,128 | a) Construction; b) $27,061,794 (Inflated 8% from 2021 cost) = FFY 2023 ($4,401,056) + FFY 2024 ($11,385,638) + FFY 2025 ($11,119,839)+ beyond 2025 ($155,261); c) A/C Years 1-4 FFY 2023- 2026; d)TEC = 11.32 out of 18. |
STBG Programmed $11,385,638 $9,108,510 $2,277,128 | ||||||||||
Total Programmed for Merrimack Valley Region Projects* $11,385,638 $9,108,510 $2,277,128 Program Target for Merrimack Valley Region Projects $11,385,638 $9,108,510 $2,277,128 | ||||||||||
Total Programmed for Merrimack Valley Region Projects* $11,385,638 $9,108,510 $2,277,128 Program Target for Merrimack Valley Region Projects $11,385,638 $9,108,510 $2,277,128 | ||||||||||
Target Funds Available for Merrimack Valley Region Projects $0 $0 $0 | ||||||||||
Section 2A / State Prioritized Reliability Projects $76,149,623 $60,919,698 $15,229,925 | ||||||||||
Bridge On- system NHS | 606522 | Merrimack Valley | Andover | ANDOVER- BRIDGE REHABILITATION, A-09- 036, I-495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB) | 4 | NHPP | $15,056,661 | $12,045,329 | $3,011,332 | Project ACd over FFY 2024-2028. |
Bridge On- system NHS | 609466 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 040, I-495 (NB & SB) OVER MERRIMACK RIVER | 4 | NHPP | $43,180,558 | $34,544,446 | $8,636,112 | Project ACd over 2023-2026. |
Bridge On- system NHS | 605304 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 007 & H-12-025, BRIDGE STREET (SR 125) OVER THE MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY) | 4 | NHPP | $17,912,404 | $14,329,923 | $3,582,481 | Project ACd over 2024-2028. |
Section 2C / State Prioritized Expansion Projects $5,685,060 $4,548,048 $1,137,012 | ||||||||||
Bicycle and Pedestrian | 607542 | Merrimack Valley | Multiple | GEORGETOWN- NEWBURY- BORDER TO BOSTON TRAIL (NORTHERN GEORGETOWN TO BYFIELD SECTION) | 4 | CMAQ | $5,685,060 | $4,548,048 | $1,137,012 | a) Construction; b) $5,685,060 CMAQ (inflated 12% from 2021 cost); d) TEC = 5.22 out of 18. |
* Only includes funds counting against obligation authority
Final FFYs 2021-2025 MVMPO TIP May 2020 77
Merrimack Valley Region Program
STIP: 2021 - 2025 (D) | ||||||||||
Other Information ▼ Present information as follows, if applicable: MassDOT a) Planning / Design / or Construction; b) total project cost and Program MPO Municipality MassDOT Project Description District Funding Total Programmed Federal Funds Non-Federal funding sources used; c) advance construction status; d) MPO project Project ID Source Funds Funds score; e) name of entity receiving a transfer; f) name of entity paying the non-state non-federal match; g) earmark details; h) TAP project proponent; i) other information | ||||||||||
Federal Fiscal 2025 Year | ||||||||||
Section 1A / Regionally Prioritized Projects $11,119,839 $8,895,871 $2,223,968 | ||||||||||
Roadway Reconstruction | 608095 | Merrimack Valley | North Andover | NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN ROUTE 125 (ANDOVER STREET) & STOP & SHOP DRIVEWAY | 4 | STBG | $11,119,839 | $8,895,871 | $2,223,968 | a) Construction; b) $27,061,794 (Inflated 8% from 2021 cost) = FFY 2023 ($4,401,056) + FFY 2024 ($11,385,638) + FFY 2025 ($11,119,839)+ beyond 2025 ($155,261); c) A/C Years 1-4 FFY 2023- 2026; d)TEC = 11.32 out of 18. |
STBG Programmed $11,119,839 $8,895,871 $2,223,968 |
Target Funds Available for Merrimack Valley Region Projects $0 $0 $0 | ||||||||||
Section 2A / State Prioritized Reliability Projects $82,647,444 $66,117,955 $16,529,489 | ||||||||||
Bridge On- system NHS | 606522 | Merrimack Valley | Andover | ANDOVER- BRIDGE REHABILITATION, A-09- 036, I-495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB) | 4 | NHPP | $20,997,351 | $16,797,881 | $4,199,470 | Project ACd over FFY 2024-2028. |
Bridge On- system NHS | 609466 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 040, I-495 (NB & SB) OVER MERRIMACK RIVER | 4 | NHPP | $33,701,001 | $26,960,801 | $6,740,200 | Project ACd over 2023-2026. |
Bridge On- system NHS | 605304 | Merrimack Valley | Haverhill | HAVERHILL- BRIDGE REPLACEMENT, H-12- 007 & H-12-025, BRIDGE STREET (SR 125) OVER THE MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY) | 4 | NHPP | $27,949,092 | $22,359,274 | $5,589,818 | Project ACd over 2024-2028. |
Section 2B / State Prioritized Modernization Projects $2,368,068 $2,131,261 $236,807 | ||||||||||
Intersection Improvements | 609392 | Merrimack Valley | Rowley | ROWLEY- SAFETY IMPROVEMENTS AT ROUTE 1, CENTRAL AND GLEN STREETS | 4 | HSIP | $2,368,068 | $2,131,261 | $236,807 | a) Construction; b) $2,368,068 HSIP (inflated 16% from 2021 cost; d) TEC = 4.08 out of 18. |
Merrimack Valley Region Total Program Summary $306,303,080 $245,279,271 $61,023,809 |
* Only includes funds counting against obligation authority
Final FFYs 2021-2025 MVMPO TIP May 2020 78
Final FFYs 2021-2025 MVMPO TIP May 2020 79
FTA Section 5307 | ||||||||||
Project Number | Agency | Line Item | Project Description | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008602 | MVRTA | 114211 | SGR Replace 1 model yr 2016 supervisory ve- hicle | $38,320 | $9,580 | $0 | $0 | $0 | $47,900 | |
MVRTA | Replace Model Yr 2009 buses delivery 2022 (2 of 9) | $495,337 | $495,337 | $990,674 | ||||||
RTD0009132 | MVRTA | 114409 | SGR Replace Security Cam- era system at McGovern Cen- ter | 2020 - $104,800 | $104,800 | $26,200 | $131,000 | |||
RTD0008595 | MVRTA | 300901 | OPERATING ASSISTANCE | $558,120 | $0 | $558,120 | $0 | $0 | $1,116,240 |
Final FFYs 2021-2025 MVMPO TIP May 2020 80
FTA Section 5307 (Cont.) | ||||||||||
Project Number | Agency | Line Item | Project Description | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008592 | MVRTA | 117A00 | PREVENTIVE MAINTENANCE | $2,796,775 | $0 | $699,195 | $0 | $0 | $3,495,970 | |
RTD0008594 | MVRTA | 442400 | SHORT RANGE TRANSIT PLANNING | $80,000 | $0 | $0 | $0 | $20,000 | $100,000 | |
RTD0009131 | MVRTA | 114305 | Riverbank stabi- lization Con- struction | 2020 - $1,400,265 | $1,400,265 | $350,065 | $0 | $0 | $0 | $1,750,330 |
RTD0008596 | MVRTA | 111215 | Replace 16 Model Yr 2015 vans with new Delivery 2021 | $590,240 | $590,240 | $0 | $0 | $0 | $1,180,480 |
Final FFYs 2021-2025 MVMPO TIP May 2020 81
FTA Section 5307 (Cont.) | ||||||||||
Project Number | Agency | Line Item | Project Description | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008593 | MVRTA | 117C00 | NON-FIXED ROUTE ADA PARA SERVICE | $1,392,850 | $0 | $348,215 | $0 | $0 | $1,741,065 | |
FTA Section 5307 Total | $7,456,707 | $1,471,422 | $1,605,530 | $0 | $20,000 | $10,553,659 | ||||
Non-Federal Aid | ||||||||||
Project Number | Agency | Line Item | Project Description | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total | |
MVRTA | MVRTA FLEX TO FTA TO REPLACE YR 2009 BUSES WITH NEW BUSES DELIVERY 2022 (7 OF 9) (STBG MATCH ON HWY TIP PROJECT #S10777) (NON-FEDERAL AID) | $693,472 | $693,472 | |||||||
Non-Federal Aid Total | $693,472 | $693,472 |
Final FFYs 2021-2025 MVMPO TIP May 2020 82
FTA Section 5307 | ||||||||||
Project Number | Agency | Line Item | Project Description | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008609 | MVRTA | 114211 | SGR Replace 2 model year 2016 supervi- sory vehicles | $78,190 | $19,550 | $0 | $0 | $0 | $97,740 | |
RTD0008597 | MVRTA | 117A00 | PREVENTIVE MAINTENANCE | $2,889,070 | $0 | $722,265 | $0 | $0 | $3,611,335 | |
RTD0008599 | MVRTA | 442400 | SHORT RANGE TRANSIT PLANNING | $80,000 | $0 | $0 | $0 | $20,000 | $100,000 | |
RTD0008600 | MVRTA | 300901 | OPERATING ASSISTANCE | $644,945 | $0 | $644,945 | $0 | $0 | $1,289,890 | |
RTD0008598 | MVRTA | 117C00 | NON-FIXED ROUTE ADA PARA SERVICE | $1,441,305 | $0 | $360,325 | $0 | $0 | $1,801,630 | |
Federal Aid Total | $5,133,510 | $19,550 | $1,727,535 | $20,000 | $6,900,595 |
Final FFYs 2021-2025 MVMPO TIP May 2020 83
FTA Section 5307 | ||||||||||
Project Num- ber | Agency | Line Item | Project De- scription | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008604 | MVRTA | 300901 | OPERATING ASSISTANCE | $739,365 | $0 | $739,365 | $0 | $0 | $1,478,730 | |
RTD0008606 | MVRTA | 111202 | Replace 4 Model Yr 2011 buses delivery 2023 | $1,004,800 | $1,004,800 | $0 | $0 | $2,009,600 | ||
RTD0008960 | MVRTA | 114211 | SGR Replace 1 model year 2017 supervi- sory vehicle | $40,265 | $10,070 | $0 | $0 | $0 | $50,335 | |
RTD0008608 | MVRTA | 442400 | SHORT RANGE TRANSIT PLANNING | $80,000 | $0 | $0 | $20,000 | $100,000 | ||
RTD0008603 | MVRTA | 117A00 | PREVENTIVE MAINTENANCE | $2,984,410 | $0 | $746,100 | $0 | $0 | $3,730,510 |
Final FFYs 2021-2025 MVMPO TIP May 2020 84
FTA Section 5307 (Cont.) | ||||||||||
Project Number | Agency | Line Item | Project Description | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008607 | MVRTA | 111215 | Replace 6 model yr 2017 vans delivery 2023 | $234,810 | $234,810 | $0 | $0 | $469,620 | ||
RTD0008605 | MVRTA | 117C00 | NON-FIXED ROUTE ADA PARA SERVICE | $1,488,870 | $0 | $372,220 | $0 | $0 | $1,861,090 | |
FTA Section 5307 Total | $6,572,520 | $1,249,680 | $1,857,685 | $0 | $20,000 | $9,699,885 |
Final FFYs 2021-2025 MVMPO TIP May 2020 85
FTA Section 5307 | ||||||||||
Project Number | Agency | Line Item | Project De- scription | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008961 | MVRTA | 114211 | SGR Replace 1 model year 2018 supervi- sory vehicle | $41,475 | $10,370 | $0 | $0 | $0 | $51,845 | |
RTD0008614 | MVRTA | 442400 | SHORT RANGE TRANSIT PLANNING | $80,000 | $0 | $0 | $0 | $20,000 | $100,000 | |
RTD0008611 | MVRTA | 117000 | PREVENTIVE MAINTENANCE | $2,894,615 | $0 | $723,650 | $0 | $0 | $3,618,265 | |
RTD0008613 | MVRTA | 117C00 | Non-fixed Route ADA paratransit service | $1,444,205 | $0 | $361,050 | $0 | $0 | $1,805,255 | |
RTD0008610 | MVRTA | 111202 | SGR Replace model yr 2011 Buses Delivery 2024 (4 of 8) | $1,049,485 | $1,049,485 | $2,098,970 |
Final FFYs 2021-2025 MVMPO TIP May 2020 86
FTA Section 5307 (Cont.) | ||||||||||
Project Number | Agency | Line Item | Project Description | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008612 | MVRTA | 300901 | OPERATING ASSISTANCE | $714,840 | $0 | $714,840 | $0 | $0 | $1,429,680 | |
FTA Section 5307 Total | $6,224,620 | $1,059,855 | $1,799,540 | $0 | $20,000 | $9,104,015 |
Final FFYs 2021-2025 MVMPO TIP May 2020 87
FTA Section 5307 | ||||||||||
Project Num- ber | Agency | Line Item | Project De- scription | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008963 | MVRTA | PREVENTIVE MAINTENANCE | $2,952,505 | $0 | $738,125 | $0 | $0 | $3,690,630 | ||
RTD0008965 | MVRTA | NON-FIXED ROUTE ADA PARA SERVICE | $1,473,090 | $0 | $368,275 | $0 | $0 | $1,841,365 | ||
RTD0008962 | MVRTA | SHORT RANGE TRANSIT PLANNING | $80,000 | $0 | $0 | $0 | $20,000 | $100,000 | ||
RTD0008964 | MVRTA | OPERATING ASSISTANCE | $729,135 | $0 | $729,135 | $0 | $0 | $1,458,270 | ||
RTD0008615 | MVRTA | SGR Replace Model Yr 2012 Buses 4 of 8 Delivery 2025 | $1,096,920 | $1,096,920 | $2,193,840 |
Final FFYs 2021-2025 MVMPO TIP May 2020 88
FTA Section 5307 (Cont.) | ||||||||||
Project Num- ber | Agency | Line Item | Project Description | Carry Over | Federal Funds | RTACAP | SCA | TDC | Local Funds | Total |
RTD0008966 | MVRTA | SGR Replace 1 model year 2019 supervi- sory vehicle | $42,305 | $10,575 | $0 | $0 | $0 | $52,880 | ||
FTA Section 5307 Total | $6,373,955 | $1,107,495 | $1,835,535 | $0 | $20,000 | $9,336,985 |
Final FFYs 2021-2025 MVMPO TIP May 2020 89
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020 90
Final FFYs 2021-2025 MVMPO TIP May 2020 91
Year (s) Programmed | City / Town | Project Description | Total Cost Programmed |
2021 | Groveland | Groveland - Groveland Community Trail, from Main Street to King Street (# 608298) | $1,984,861 |
2021 | Haverhill | Haverhill – Intersection Improvements at Rt 110 / Rt 108 (# 608761) | $1,980,067 |
2022 | Lawrence | Lawrence – Intersection Improvements at Merrimack Street and South Broad- way (Route 28) (# 609509) | $1,610,960 |
2021 | Lawrence | Lawrence – Intersection Improvements at South Broadway (Route 28) and Mount Vernon Street (# 609251) | $1,013,739 |
2022 | Methuen | Methuen – Intersection Improvements at Riverside Drive and Burnham Road (# 610658) | $967,200 |
2021 | New- buryport | Newburyport – Riverfront Clipper City Rail Trail Construction (# 610663) | $1,900,802 |
2023-2025 | North Andover | North Andover - Corridor Improvements on Route 114, between Route 125 (And- over Street) & Stop & Shop Driveway (# 608095) * | $26,906,532* |
2023 | Salisbury | Salisbury – Reconstruction of Route 1 (Lafayette Road) | $6,837,284 |
* North Andover Route 114 is AC’d FFY 2023 to 2026, FFY 2026 = $ 155,262, Total Pro-
ject Cost =$27,061,794
Final FFYs 2021-2025 MVMPO TIP May 2020 92
Year (s) Programmed | City / Town | Project Description | Total Cost Programmed |
2021 | MVRTA | MVRTA – Flex to FTA to Replace Yr 2009 Buses with new Buses Delivery 2022 (7 of 9) ( # S10777 ) | $3,467,361 |
Final FFYs 2021-2025 MVMPO TIP May 2020 93
Project Description | Total Cost Programmed |
Groveland Total | $1,984,861 |
Haverhill Total | $1,980,067 |
Lawrence Total | $2,624,699 |
Methuen Total | $967,200 |
Newburyport Total | $1,900,802 |
North Andover Total | $26,906,532 |
Salisbury Total | $6,837,284 |
MVRTA Total | $3,467,361 |
Regional Total | $46,668,806 |
Final FFYs 2021-2025 MVMPO TIP May 2020 94
Year (s) Programmed | City / Town | Project Description | Total Cost Programmed |
2024-2025 | Andover | Andover- Bridge Rehabilitation, A-09- 036, I-495 over St 28 (SB), A-09-037, I- 495 over B&M and MBTA, A-09-041, I- 495 over St 28 (NB) (# 606522) | $36,054,012* |
2022 | Georgetown / Boxford | Georgetown - Boxford Border to Boston Trail, from Georgetown Road to West Main Street (Route 97) (# 607541) | $2,520,436 |
2024 | Georgetown / Newbury | Georgetown - Newbury Border to Boston Trail, (Northern Georgetown to Byfield Section) (# 607542) | $5,685,060 |
2021 | Groveland | Groveland - Groveland Community Trail, from Main Street to King Street (# 608298) | $1,984,861 |
2024-2025 | Haverhill | Haverhill- Bridge Replacement, H-12- 007 & H-12-025, Bridge Street (SR 125) over the Merrimack River and the Aban- doned B&M RR (Proposed Bikeway) (# 605304) | $45,861,496 |
2021-2023 | Haverhill | Haverhill - Bridge Replacement, H-12- 039, I-495 (NB & SB) over Merrimack River (# 605306) | $46,503,796* |
2023-2025 | Haverhill | Haverhill - Bridge Replacement, H-12- 040, I-495 (NB & SB) over Merrimack River (# 609466) | $94,747,200 |
* Andover (# 606522) is AC’d FFY 2024 to 2028, Total Project Cost =$131,458,071
Haverhill (# 605304) is AC’d FFY 2024 to 2028, Total Project Cost = $116,320,512
Haverhill (# 605306) is AC’d FFY 2018 to 2023, Total Project Cost = $108,833,832
Haverhill (# 609466) is AC’d FFY 2023 to 2026, Total Project Cost = $99,783,090
Final FFYs 2021-2025 MVMPO TIP May 2020 95
Year (s) Programmed | City / Town | Project Description | Total Cost Programmed |
2021 | Haverhill | Haverhill – Intersection Reconstruction on Route 108 (Newton Road) at Route 110 (Kenoza Avenue and Amesbury Road) (# 608761) | $1,980,067 |
2021 | Lawrence | Lawrence – Intersection Improvements at South Broadway (Route 28) and Mount Vernon Street (# 609251) | $1,013,739 |
2022 | Lawrence | Lawrence – Intersection Improvements at Merrimack Street and South Broad- way (Route 28) (# 609509) | $1,610,960 |
2023 | Lawrence | Lawrence – Lawrence Manchester Rail Corridor (LMRC) Rail Trail (# 608930) | $16,087,005 |
2022 | Methuen | Methuen – Intersection Improvements at Riverside Drive and Burnham Road (# 610658) | $967,200 |
2022 | Newbury - Newburyport - Salisbury | Newbury - Newburyport - Salisbury - Re- surfacing and related work on Route 1 (# 608494) | $9,807,200 |
2021 | Newburyport | Newburyport – Riverfront Clipper City Rail Trail Construction | $1,900,802 |
Final FFYs 2021-2025 MVMPO TIP May 2020 96
Year (s) Programmed | City / Town | Project Description | Total Cost Programmed |
2023-2025 | North Andover | North Andover - Corridor Improvements on Route 114, between Route 125 (And- over Street) & Stop & Shop Driveway (# 608095) | $26,906,533* |
2025 | Rowley | Rowley – Safety Improvements at Route 1, Central and Glen Streets (# 609392) | $2,368,068 |
2023 | Salisbury | Salisbury – Reconstruction of Route 1 (Lafayette Road) (# 602202) | $6,837,284 |
2021 | MVRTA | MVRTA – Flex to FTA to Replace Yr 2009 Buses with new Buses Delivery 2022 (7 of 9) ( #S10777 ) | $3,467,361 |
*North Andover (# 608095) is AC’d FFY 2023 to 2026, Total Project Cost =$27,061,794
Final FFYs 2021-2025 MVMPO TIP May 2020 97
Project Description | Total Cost Programmed |
Andover Total | $36,054,012 |
Boxford Total | $1,260,218 |
Georgetown Total | $4,102,748 |
Groveland Total | $1,984,861 |
Haverhill Total | $189,092,559 |
Lawrence Total | $18,711,704 |
Methuen Total | $967,200 |
Newbury Total | $6,111,597 |
Newburyport Total | $5,169,869 |
North Andover Total | $26,906,533 |
Rowley Total | $2,368,068 |
Salisbury Total | $10,106,350 |
MVRTA Total | $3,467,361 |
Regional Total | $306,303,080 |
Final FFYs 2021-2025 MVMPO TIP May 2020 98
Final FFYs 2021-2025 MVMPO TIP May 2020 99
The TIP must be financially constrained, meaning projects included in the TIP must have
an identified funding source. Funding levels for Federal Fiscal Years 2021-2025 have been developed cooperatively between the State and the MPOs as part of the TIP development process. The following tables depict the resulting financial plan for each of the five fiscal years. FHWA provides the state with the expected Federal Funding available for each year of the TIP this estimated Title 23 Base Obligation Authority is listed first to which is added
a “Planned redistribution request” estimated to be $50,000,000 each year of the TIP. (Toward the end of the FFY any state that has not spent their Federal Obligation Authority returns that authority, and the Federal government redistributes those funds to the other states.) The Total estimated Federal Funds available to Massachusetts is estimated to be between approximately 671 million dollars and 711 million dollars for each of FFYs 2021 to
2025. The State then subtracts annual debt service payments for the Accelerated Bridge Program (ABP) Grant Application Notes (GANs) which range from 82 million dollars to almost 94 million dollars for each year over the five years of the TIP. The State generally provides the 20% match required for the Federal funds resulting in estimated funds ranging from approximately 728 million dollars to approximately 763 million dollars available Statewide for highway program funding for each of the five years of the TIP.
MassDOT Highway Division, Office of Transportation Planning (OTP), and the Federal Aid Programming and Reimbursement Office (FAPRO) then decide the amount of funding needed for Statewide items such as Interstate Maintenance, district-wide contracts, planning and transportation demand management. Those funds are subtracted from the total and the remaining is available for regional priorities, which ranges from $243,332,161 in FFY 2021 to $257,035,098 in FFY 2025.
This funding is then allocated to MPOs based upon the existing Massachusetts Association of Regional Planning Agencies (MARPA) TIP target distribution formula. This “MARPA” formula is based mainly on each MPO’s road mileage and population. The MVMPO’s share is 4.4296%, resulting in the funding available for regional priorities to be;
$10,778,653 in FFY 2021; $10,998,131 in FFY 2022; $11,238,340 in FFY 2023;
$11,385,638 in FFY 2024 and $11,119,839 in FFY 2025.
In FFY 2017 MassDOT ended funding for the regional major infrastructure program after the I-91 Viaduct in Springfield project had been completed. These funds will be reallocated to the Regional Target program for prioritization by MPOs across the state.
Inflation increases project costs and therefore project costs have been increased 4% per year.
Final FFYs 2021-2025 MVMPO TIP May 2020
100
Final FFYs 2021-2025 MVMPO TIP May 2020 101
Final FFYs 2021-2025 MVMPO TIP May 2020 102
The following table shows the total federal programmed amounts in this TIP for each of the five years covered in this document. The funding summaries below show the total Operating and Maintenance costs versus Capital and Other costs, for each year of the TIP. A fiscal constraint finding for the State Transportation Improvement Program will include the cost of operating
and maintaining the existing MVMPO transportation system.
Merrimack Valley Metropolitan Planning Organization FFY 2021-2025 Transportation Improvement Program (FHWA - related funding categories only)
Total Costs including Federal and State Match*
Figures include Federal Aid “target” program & statewide funding
Fiscal Year | Federal Programmed Operating/ Maintenance Costs*(inc. Match) | Federal Programmed Capital and Other Costs*(inc. Match) | Total Federal + Match Programmed* | Total Federal + Match Estimated Available Funds* |
2021 | $21.77 | $3.88 | $25.65 | $26.08 |
2022 | $30.59 | $2.52 | $33.11 | $41.53 |
2023 | $42.10 | $16.09 | $58.19 | $58.19 |
2024 | $87.53 | $5.69 | $93.22 | $93.22 |
2025 | $96.14 | $0 | $96.14 | $96.14 |
* Millions of dollars
The financial plan contained herein is financially constrained and indicates that the Merrimack Valley Metropolitan Planning Organization's FFYs 2021-2025 TIP reflects an emphasis on the maintenance and operation of the current roadway and bridge system with the ability to provide additional capital improvements. Only projects for which funds can be expected have been included.
Appendix B of this document includes a list of Non-federal-aid transportation projects in the region. The projects listed in Appendix B are an integral part of the planning, programming, and priority setting process of the MVMPO but have no available funding source.
Final FFYs 2021-2025 MVMPO TIP May 2020 103
The following tables contain a breakdown of the project cost totals and federal aid cost portions by federal aid funding categories for each fiscal year and the expected available resources to cover the cost.
Cost Estimates and Available Resources
Summary by Funding Category
Highway Projects Federal Fiscal Year 2021
Highway FFY 2021 | Estimated Needs MVMPO (in 1000s) Federal Portion of Cost | Estimated Needs MVMPO (in 1000s) Total Project Cost | Available Resources MVMPO Projects (in 1000s) (From Region Target if not Statewide Category) | |||
Regional Target Congestion Mitigation/AQ Program (CMAQ) | $0 | $0 | $0 | |||
Regional Target Highway Safety Program (HSIP) | $0 | $0 | $0 | |||
Regional Target Surface Transportation Block Grant Program (STBG) | $8,277.46 | $10,346.83 | $10,778.65 | |||
Regional Target Transportation Alternatives Program (TAP) | $0 | $0 | $0 | |||
Regional Target Subtotals | $8,277.46 | $10,346.83 | $10,778.65 | |||
Statewide On-System Bridges (NHPP-On) | $12,244.70 | $15,305.88 | $15,305.88 | |||
Total FFY 2021 | $20,522.16 | $25,652.71 | $26,084.53 |
Final FFYs 2021-2025 MVMPO TIP May 2020 104
Cost Estimates and Available Resources
Summary by Funding Category
Highway Projects Federal Fiscal Year 2022
Highway FFY 2022 | Estimated Needs MVMPO (in 1000s) Federal Portion of Cost | Estimated Needs MVMPO (in 1000s) Total Project Cost | Available Resources MVMPO Projects (in 1000s) (From Region Target if not Statewide Category) |
Regional Target Congestion Mitigation/AQ Program (CMAQ) | $0 | $0 | $0 |
Regional Target Highway Safety Program (HSIP) | $0 | $0 | $0 |
Regional Target Surface Transportation Block Grant Program (STBG) | $2,062.53 | $2,578.16 | $10,998.13 |
Regional Target Transportation Alternatives Program (TAP) | $0 | $0 | $0 |
Regional Target Subtotals | $2,062.53 | $2,578.16 | $10,998.13 |
Statewide Bicycle and Pedestrians (CMAQ) | $2,016.35 | $2,520.44 | $2,520,44 |
Statewide On-System Bridges (NHPP) | $14,562.95 | $18,203.68 | $18,203.68 |
Statewide Non-Interstate Pavement (NHPP) | $7,845.76 | $9,807.20 | $9,807.20 |
Total FFY 2022 | $26,487.59 | $33,109.48 | $41,529.45 |
Final FFYs 2021-2025 MVMPO TIP May 2020 105
Cost Estimates and Available Resources
Summary by Funding Category
Highway Projects Federal Fiscal Year 2023
Highway FFY 2023 | Estimated Needs MVMPO (in 1000s) Federal Portion of Cost | Estimated Needs MVMPO (in 1000s) Total Project Cost | Available Resources MVMPO Projects (in 1000s) (From Region Target if not Statewide Category) |
Regional Target Congestion Mitigation/AQ Program (CMAQ) | |||
Regional Target Highway Safety Program (HSIP) | |||
Regional Target Surface Transportation Block Grant Program (STBG) | $8,990.67 | $11,238.34 | $11,238.34 |
Regional Target Transportation Alternatives Program (TAP) | |||
Regional Target Subtotals | $8,990.67 | $11,238.34 | $11,238.34 |
Statewide On-System Bridges (NHPP-On) | $24.687.90 | $30,859.87 | $30,859.87 |
Statewide Bicycle and Pedestrians (CMAQ) | $12,869.60 | $16,087.01 | $16,087.01 |
Total FFY 2023 | $46,548.17 | $58,185.22 | $58,185.22 |
Final FFYs 2021-2025 MVMPO TIP May 2020 106
Cost Estimates and Available Resources
Summary by Funding Category
Highway Projects Federal Fiscal Year 2024
Highway FFY 2024 | Estimated Needs MVMPO (in 1000s) Federal Portion of Cost | Estimated Needs MVMPO (in 1000s) Total Project Cost | Available Resources MVMPO Projects (in 1000s) (From Region Target if not Statewide Category) | |
Regional Target Surface Transportation Block Grant Program (STBG) | $9,108.51 | $11,385.64 | $11,385.64 | |
Regional Target Subtotals | $9,108.51 | $11,385.64 | $11,385.64 | |
Statewide Bicycle and Pedestrians (CMAQ) | $4,548.05 | $5,685.06 | $5,685.06 | |
Statewide (SW) Bridges On-System (NHPP-On) | $60,919.70 | $76,149.62 | $76,149.62 | |
Total FFY 2024 | $74,576.26 | $93,220.32 | $93,220.32 |
Final FFYs 2021-2025 MVMPO TIP May 2020 107
Cost Estimates and Available Resources
Summary by Funding Category
Highway Projects Federal Fiscal Year 2025
Highway FFY 2025 | Estimated Needs MVMPO (in 1000s) Federal Portion of Cost | Estimated Needs MVMPO (in 1000s) Total Project Cost | Available Resources MVMPO Projects (in 1000s) (From Region Target if not Statewide Category) | |
Regional Target Surface Transportation Block Grant Program (STBG) | $8,895.87 | $11,119.84 | $11,119.84 | |
Regional Target Subtotals | $8,895.87 | $11,119.84 | $11,119.84 | |
Statewide (SW) Bridges On-System (NHPP-On) | $66,117.96 | $82,647.44 | $82,647.44 | |
Statewide Intersection Improvements (HSIP) | $2,131.26 | $2,368.07 | $2,368.07 | |
Total FFY 2025 | $77,145.09 | $96,135.35 | $96,135.35 |
Final FFYs 2021-2025 MVMPO TIP May 2020 108
Planning Justification for Transit Projects
The Merrimack Valley region's FFYs 2021-2025 TIP federal aid transit projects are to be carried out using Sections 5307 received by the MVRTA from the FTA with the exception of the provision of operating assistance, the planning justification for the Section 5307 projects are contained in the Merrimack Valley Regional Transit Authority's Five-Year Capital Program for 2021-2025.
MVRTA Financial Status
The FAST Act requires that projects appearing in the TIP must have an identified source of funding that will allow them to be completed within the time period contemplated. Transit
projects appearing in the FY 2021-2025 TIP meet this criterion.
Final FFYs 2021-2025 MVMPO TIP May 2020 109
Merrimack Valley Metropolitan Planning Organization FFYs 2021-2025 Transportation Improvement Program (FTA related funding categories only)
Total Costs including Federal, State and Local*
Fiscal Year | Federal Programmed Operating/ Maintenance Costs* (inc. Match) | Federal Programmed Capital and Other Costs* (inc. Match) | Total Federal + Match Programmed* | Total Federal + Match Estimated Available Funds* |
2021 | $10.45 | $0.10 | $10.55 | $10.55 |
2022 | $6.80 | $0.10 | $6.90 | $6.90 |
2023 | $9.60 | $0.10 | $9.70 | $9.70 |
2024 | $9.00 | $0.10 | $9.10 | $9.10 |
2025 | $9.24 | $0.10 | $9.34 | $9.34 |
* Millions of dollars
Final FFYs 2021-2025 MVMPO TIP May 2020 110
Cost Estimates and Available Resources
Summary by Funding Category
2021 Transit Projects
FTA Funding Program Summaries (Federal dollars only)
Merrimack Valley Regional Transit Authority FTA Funding Programs | Estimated Authorization FFY 2021 | Regional TIP FFY 2021 | Balance FFY 2021 |
Section 5307 Capital and Planning Formula | $6,170,880 | $4,540,742 | $1,630,138 |
Section 5307 Transit Enhancements | |||
Subtotal | $6,170,880 | $4,540,742 | $1,630,138 |
Section 5307 Capital and Planning Formula Carryover | $2,915,965 | $2,915,965 | $0 |
Section 5307 Operating Carryover | |||
Section 5307 Transit Enhancements Car- ryover | |||
Subtotal | $2,915,965 | $2,915,965 | $0 |
Section 5307 Total | $9,086,845 | $7,456,707 | $1,630,138 |
Section 5309 Bus | |||
Section 5309 Fixed Guideway | |||
Section 5309 Total | |||
Section 5310 Elderly and Disabled | |||
Section 5310 Elderly and Disabled Carryo- ver | |||
Federal Aid Total | $9,086,845 | $7,456,707 | $1,630,138 |
Other Transit Funding |
Final FFYs 2021-2025 MVMPO TIP May 2020 111
Cost Estimates and Available Resources
Summary by Funding Category
2022 Transit Projects
FTA Funding Program Summaries (Federal dollars only)
Merrimack Valley Regional Transit Authority FTA Funding Programs | Estimated Authorization FFY 2022 | Regional TIP FFY 2022 | Balance FFY 2022 |
Section 5307 Capital and Planning Formula | $6,299,235 | $3,503,372 | $2,795,863 |
Section 5307 Transit Enhancements | |||
Subtotal | $6,299,235 | $3,503,372 | $2,795,863 |
Section 5307 Capital and Planning Formula Carryover | $1,630,138 | $1,630,138 | $0 |
Section 5307 Operating Carryover | |||
Section 5307 Transit Enhancements Carryover | |||
Subtotal | $1,630,138 | $1,630,138 | $0 |
Section 5307 Total | $7,929,373 | $5,133,510 | $2,795,863 |
Section 5309 Bus | |||
Section 5309 Fixed Guideway | |||
Section 5309 Total | |||
Section 5310 Elderly and Disabled | |||
Section 5310 Elderly and Disabled Carryover | |||
Federal Aid Total | $7,929,373 | $5,133,510 | $2,795,863 |
Other Transit Funding (Non-Federal Aid) |
Final FFYs 2021-2025 MVMPO TIP May 2020 112
Cost Estimates and Available Resources
Summary by Funding Category
2023 Transit Projects
FTA Funding Program Summaries (Federal dollars only)
Merrimack Valley Regional Transit Authority FTA Funding Programs | Estimated Authorization FFY 2023 | Regional TIP FFY 2023 | Balance FFY 2023 |
Section 5307 Capital and Planning Formula | $6,430,260 | $3,776,657 | $2,653,603 |
Section 5307 Transit Enhancements | |||
Subtotal | $6,430,260 | $3,776,657 | $2,653,603 |
Section 5307 Capital and Planning Formula Carryover | $2,795,863 | $2,795,863 | $0 |
Section 5307 Operating Carryover | |||
Section 5307 Transit Enhancements Carryover | |||
Subtotal | $2,795,863 | $2,795,863 | $0 |
Section 5307 Total | $9,226,123 | $6,572,520 | $2,653,603 |
Section 5309 Bus | |||
Section 5309 Fixed Guideway | |||
Section 5309 Total | |||
Section 5310 Elderly and Disabled | |||
Section 5310 Elderly and Disabled Carryover | |||
Section 5339 Bus and Bus Related Equipment and Facilities | |||
Federal Aid Total | $9,226,123 | $6,572,520 | $2,653,603 |
Other Transit Funding (Non-Federal Aid) | $0 | $0 | $0 |
Final FFYs 2021-2025 MVMPO TIP May 2020 113
Cost Estimates and Available Resources
Summary by Funding Category
2024 Transit Projects
FTA Funding Program Summaries (Federal dollars only)
Merrimack Valley Regional Transit Authority FTA Funding Programs | Estimated Authorization FFY 2024 | Regional TIP FFY 2024 | Balance FFY 2024 |
Section 5307 Capital and Planning Formula | $6,564,010 | $3,571,017 | $2,992,993 |
Section 5307 Transit Enhancements | |||
Subtotal | $6,564,010 | $3,571,017 | $2,992,993 |
Section 5307 Capital and Planning Formula Carryover | $2,653,603 | $2,653,603 | $0 |
Section 5307 Operating Carryover | |||
Section 5307 Transit Enhancements Carryover | |||
Subtotal | $2,653,603 | $2,653,603 | $0 |
Section 5307 Total | $9,217,613 | $6,224,620 | $2,992,993 |
Section 5309 Bus | |||
Section 5309 Fixed Guideway | |||
Section 5309 Total | |||
Section 5310 Elderly and Disabled | |||
Section 5310 Elderly and Disabled Carryover | |||
Section 5339 Bus and Bus Related Equipment and Facilities | |||
Federal Aid Total | $9,217,613 | $6,224,620 | $2,992,993 |
Other Transit Funding (Non-Federal Aid) | $0 | $0 | $0 |
Final FFYs 2021-2025 MVMPO TIP May 2020 114
Cost Estimates and Available Resources
Summary by Funding Category
2025 Transit Projects
FTA Funding Program Summaries (Federal dollars only)
Merrimack Valley Regional Transit Authority FTA Funding Programs | Estimated Authorization FFY 2025 | Regional TIP FFY 2025 | Balance FFY 2025 |
Section 5307 Capital and Planning Formula | $6,700,540 | $3,380,962 | $3,319,578 |
Section 5307 Transit Enhancements | |||
Subtotal | $6,700,540 | $3,380,962 | $3,319,578 |
Section 5307 Capital and Planning Formula Carryover | $2,992,993 | $2,992,993 | $0 |
Section 5307 Operating Carryover | |||
Section 5307 Transit Enhancements Carryover | |||
Subtotal | $2,992,993 | $2,992,993 | $0 |
Section 5307 Total | $9,693,533 | $6,373,955 | $3,319,578 |
Section 5309 Bus | |||
Section 5309 Fixed Guideway | |||
Section 5309 Total | |||
Section 5310 Elderly and Disabled | |||
Section 5310 Elderly and Disabled Carryover | |||
Section 5339 Bus and Bus Related Equipment and Facilities | |||
Federal Aid Total | $9,693,533 | $6,373,955 | $3,319,578 |
Other Transit Funding (Non-Federal Aid) | $0 | $0 | $0 |
Final FFYs 2021-2025 MVMPO TIP May 2020 115
State Fiscal Year 2019 (Actual), 2020 (Adopted Budget), and 2021 to 2025 (Projected)
The numbers below represent actual numbers for the previous year, the current year budget/forecast approved by the MVRTA Advisory Board, and Projections for the out-years. These numbers indicate that there are sufficient revenues projected to meet the operating needs of the MVRTA.
Audit | Adopted Budget | DRAFT Budget | Projected | Projected | Projected | Projected | |
Operating Revenue | Actual | Current | Yr One | Yr Two | Yr Three | Yr Four | Yr Five |
2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | |
Farebox | $1,907,935 | $1,851,640 | $1,957,500 | $1,888,855 | $1,907,735 | $1,926,185 | $1,944,815 |
Section 5307 | $4,195,800 | $4,313,850 | $4,637,100 | $4,749,280 | $4,657,960 | $4,887,350 | $5,128,040 |
Section 5311 | |||||||
CMAQ/TDM | |||||||
Fully Funded* | |||||||
Job Access/ Reverse Commute | |||||||
New Freedom |
Final FFYs 2021-2025 MVMPO TIP May 2020 116
MVRTA Transit Operations and Maintenance Summary Table
State Fiscal Year 2019 (Actual), 2020 (Adopted Budget), and 2021 to 2025 (Projected) (Continued)
Audit | Adopted Budget | Draft Budget | Projected | Projected | Projected | Projected | |
Operating Revenue | Actual | Current | Yr One | Yr Two | Yr Three | Yr Four | Yr Five |
2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | |
Advertising | $25,000 | $25,000 | $30,000 | $25,000 | $25,000 | $25,000 | $25,000 |
Interest Income | $2,000 | $10,000 | $12,000 | $10,000 | $10,000 | $10,000 | $10,000 |
Rental Income | |||||||
State Contract Assistance** | $6,836,165 | $7,253,005 | $7,509,670 | $7,694,700 | $7,887,070 | $8,084,245 | $8,286,350 |
Local Assessment | $3,725,510 | $3,810,715 | $4,607,705 | $4,007,285 | $4,109,345 | $4,214,010 | $4,321,340 |
Other: (Define) | $962,855 | $1,041,510 | $1,109,365 | $1,083,585 | $1,105,260 | $1,127,360 | $1,149,900 |
Total Revenue | $17,646,465 | $18,305,720 | $19,863,340 | $19,458,705 | $19,702,370 | $20,274,150 | $20,865,445 |
Final FFYs 2021-2025 MVMPO TIP May 2020 117
MVRTA Transit Operations and Maintenance Summary
State Fiscal Year 2019 (Actual), 2020 (Adopted Budget), and 2021 to 2025 (Projected) (Continued)
Operating Expenses *** | Actual | Current | Yr One | Yr Two | Yr Three | Yr Four | Yr Five | |
2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | ||
Total (See Below) | $17,646,465 | $18,305,720 | $19,863,340 | $19,458,705 | $19,702,370 | $20,274,150 | $20,865,445 |
Footnotes:
* Fully funded refers to contract work often to Human Service Agencies
** Operating assistance provided by the State
*** Description of Operating Expenses: Salaries and Wages; Fringe Benefits: Legal, Accounting and Professional Services; Promotion/Marketing; Insurance; Equipment Leases and Rentals; Real Property Leases and Rentals; Non-capitalized Maintenance/Repair; Fuel costs; Tire costs; Office Supplies and Equipment; Interest expense; Utilities; Management Fees;
Travel and Training; and Other miscellaneous expense items.
Final FFYs 2021-2025 MVMPO TIP May 2020 118
Project ID | Location | Project Description | Mass DOT District | Funding Category | Total Programmed Funds | Project Status |
602418 | Amesbury | Amesbury – Reconstruction of Elm Street | 4 | STBG | $7,223,053 | Advertised 7/13/2019. |
608027 | Haverhill | Haverhill – Bradford Rail Trail Exten- sion from Route 125 to Railroad Street | 4 | STBG/ TAP | $1,766,108 | 100% Design March 2020. Amend # 6 Increased Project Cost from $848,345 to $1,766,108. |
605306 | Haverhill | Haverhill – Bridge Replacement, H- 12-039, I-495 (NB & SB) over Merri- mack River | 4 | NHPP-ON | $15,305,880 | Contract Awarded 5/14/2018. Under Construction. AC Year 3 of 6. Total project cost to $118,786,388. |
Final FFYs 2021-2025 MVMPO TIP May 2020 119
5307 | ||||||||
Project Number | Project Description | Carry Over | Federal Funds | State Funds | TDC | Local Funds | Total | Project Status |
RTD0007680 | Preventive Maintenance Ex- pense | $2,658,530 | $664,630 | $0 | $0 | $3,323,160 | Ongoing | |
RTD0007681 | Non-Fixed Route ADA para serv | $1,322,605 | $330,650 | $0 | $0 | $1,653,255 | Ongoing | |
RTD0007682 | SHORT RANGE TRANSIT PLANNING | $80,000 | $0 | $0 | $20,000 | $100,000 | Ongoing | |
RTD0007683 | OPERATING ASSISTANCE | $430,775 | $430,775 | $0 | $0 | $861,550 | Ongoing | |
RTD0007687 | Replace 3 Model Yr 2007 buses delivery 2020 | $1,101,720 | $275,430 | $0 | $0 | $1,377,150 | Complete | |
RTD0007695 | SGR Riverbank stabilization Construction | $1,400,265 | $350,065 | $0 | $0 | $1,750,330 | Moved to FFY 2021 | |
RTD0007696 | SGR Replace 1 model year 2013 supervisory vehicle | $37,225 | $9,305 | $46,530 | Complete |
Final FFYs 2021-2025 MVMPO TIP May 2020 120
5307 | ||||||||
Project Number | Project Description | Federal Funds | State Funds | TDC | MAP | Local Funds | Total | Project Status |
RTD0008295 | Northern Essex Elder Transport Driving For- ward 2020 | $12,500 | $0 | $0 | $12,500 | $25,000 | Ongoing | |
Purchase On-board Automatic Passenger Counter (APC) | $371,280 | $0 | $92,820 | $0 | $371,280 | Ongoing | ||
RTD0008311 | Town of Andover Buy replacement van (1) | $55,280 | $13,820 | $69,100 | Ongoing | |||
RTD0008320 | Town of Salisbury Buy van for service expansion (1) | $54,400 | $13,600 | $68,000 | Ongoing |
Final FFYs 2021-2025 MVMPO TIP May 2020 121
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP May 2020 122
This section documents the latest air quality conformity determination for the 1997 ozone Na- tional Ambient Air Quality Standards (NAAQS) in the Merrimack Valley MPO Region. It covers the applicable conformity requirements according to the latest regulations, regional designation status, legal considerations, and federal guidance. Further details and background information are provided below:
The 1990 Clean Air Act Amendments (CAAA) require metropolitan planning organizations within nonattainment and maintenance areas to perform air quality conformity determinations prior to the approval of Long-Range Transportation Plans (LRTPs) and Transportation Im- provement Programs (TIPs), and at such other times as required by regulation. Clean Air Act (CAA) section 176(c) (42 U.S.C. 7506(c)) requires that federally funded or approved highway and transit activities are consistent with (“conform to”) the purpose of the State Implementation Plan (SIP). Conformity to the purpose of the SIP means that means Federal Highway Admin- istration (FHWA) and Federal Transit Administration (FTA) funding and approvals are given to highway and transit activities that will not cause or contribute to new air quality violations, worsen existing violations, or delay timely attainment of the relevant NAAQS or any interim milestones (42 U.S.C. 7506(c)(1)). EPA’s transportation conformity rules establish the criteria and procedures for determining whether metropolitan transportation plans, transportation im- provement programs (TIPs), and federally supported highway and transit projects conform to the SIP (40 CFR Parts 51.390 and 93).
A nonattainment area is one that the U.S. Environmental Protection Agency (EPA) has desig- nated as not meeting certain air quality standards. A maintenance area is a nonattainment
area that now meets the standards and has been re-designated as maintaining the standard. A
conformity determination is a demonstration that plans, programs, and projects are consistent with the State Implementation Plan (SIP) for attaining the air quality standards. The CAAA re- quirement to perform a conformity determination ensures that federal approval and funding go
to transportation activities that are consistent with air quality goals.
Final FFYs 2021-2025 MVMPO TIP May 2020 123
The entire Commonwealth of Massachusetts was previously classified as nonattainment for ozone, and was divided into two nonattainment areas. The Eastern Massachusetts ozone nonattainment area included Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, and Worcester counties. Berkshire, Franklin, Hampden, and Hampshire counties comprised the Western Massachusetts ozone nonattainment area. With these classi- fications, the 1990 Clean Air Act Amendments (CAAA) required the Commonwealth to reduce its emissions of volatile organic compounds (VOCs) and nitrogen oxides (NOx), the two major precursors to ozone formation to achieve attainment of the ozone standard.
The 1970 Clean Air Act defined a one-hour national ambient air quality standard (NAAQS) for ground-level ozone. The 1990 CAAA further classified degrees of nonattainment of the one- hour standard based on the severity of the monitored levels of the pollutant. The entire com- monwealth of Massachusetts was classified as being in serious nonattainment for the one-hour ozone standard, with a required attainment date of 1999.The attainment date was later ex- tended, first to 2003 and a second time to 2007.
In 1997, the EPA proposed a new, eight-hour ozone standard that replaced the one- hour standard, effective June 15, 2005. Scientific information had shown that ozone could affect hu- man health at lower levels, and over longer exposure times than one hour. The new standard was challenged in court, and after a lengthy legal battle, the courts upheld it. It was finalized in June 2004.The eight-hour standard is 0.08 parts per million, averaged over eight hours and not to be exceeded more than once per year. Nonattainment areas were again further classified based on the severity of the eight-hour values. Massachusetts as a whole was classified as being in moderate nonattainment for the eight-hour standard, and was separated into two non- attainment areas—Eastern Massachusetts and Western Massachusetts.
In March 2008, EPA published revisions to the eight-hour ozone NAAQS establishing a level of
0.075 ppm, (March 27, 2008; 73 FR 16483). In 2009, EPA announced it would reconsider this standard because it fell outside of the range recommended by the Clean Air Scientific Advisory Committee. However, EPA did not take final action on the re-consideration so the standard would remain at 0.075 ppm.
After reviewing data from Massachusetts monitoring stations, EPA sent a letter on December
16, 2011 proposing that only Dukes County would be designated as nonattainment for the new proposed 0.075 ozone standard. Massachusetts concurred with these findings.
On May 21, 2012, (77 FR 30088), the final rule was published in the Federal Register, defining the 2008 NAAQS at 0.075 ppm, the standard that was promulgated in March 2008. A second rule published on May 21, 2012 (77 FR 30160), revoked the 1997 ozone NAAQS to occur one
year after the July 20, 2012 effective date of the 2008 NAAQS.
Final FFYs 2021-2025 MVMPO TIP May 2020 124
Also, on May 21, 2012, the air quality designations areas for the 2008 NAAQS were published in the Federal Register. In this Federal Register, the only area in Massachusetts that was des- ignated as nonattainment is Dukes County. All other Massachusetts counties were designated as attainment/unclassified for the 2008 standard. On March 6, 2015, (80 FR 12264, effective April 6, 2015) EPA published the Final Rulemaking, “Implementation of the 2008 National Am- bient Air Quality Standards (NAAQS) for Ozone: State Implementation Plan Requirements; Fi- nal Rule.” This rulemaking confirmed the removal of transportation conformity to the 1997
Ozone NAAQS.
However, on February 16, 2018, the United States Court of Appeals for the District of Colum- bia Circuit in South Coast Air Quality Mgmt. District v. EPA (“South Coast II,” 882 F.3d 1138) held that transportation conformity determinations must be made in areas that were either non- attainment or maintenance for the 1997 ozone NAAQS and attainment for the 2008 ozone NAAQS when the 1997 ozone NAAQS was revoked. These conformity determinations are re- quired in these areas after February 16, 2019. On November 29, 2018, EPA issued Transpor- tation Conformity Guidance for the South Coast II Court Decision (EPA-420-B-18-050, Novem- ber 2018) that addresses how transportation conformity determinations can be made in areas. According to the guidance, both Eastern and Western Massachusetts, along with several other areas across the country, are now defined as “orphan nonattainment areas” – areas that were designated as nonattainment for the 1997 ozone NAAQS at the time of its revocation (80 FR
12264, March 6, 2015) and were designated attainment for the 2008 ozone NAAQS in EPA’s
original designations rule for this NAQS (77 FR 30160, May 21, 2012)
After 2/16/19, as a result of the court ruling and the subsequent federal guidance, transporta- tion conformity for the 1997 NAAQS – intended as an “anti-backsliding” measure – now applies to both of Massachusetts’ orphan areas. Therefore, this conformity determination is being
made for the 1997 ozone NAAQS on the Merrimack Valley MPO FFY 2021-2025 Transporta-
tion Improvement Program and 2020-2040 Regional Transportation Plan.
The transportation conformity regulation at 40 CFR 93.109 sets forth the criteria and procedures for determining conformity. The conformity criteria for TIPs and RTPs include: latest planning assumptions (93.110), latest emissions model (93.111), consultation (93.112), transportation control measures (93.113(b) and (c), and emissions budget and/or interim emissions (93.118 and/or 93.119).
For the 1997 ozone NAAQS areas, transportation conformity for TIPs and RTPs for the 1997 ozone NAAQS can be demonstrated without a regional emissions analysis, per 40 CFR
93.109(c). This provision states that the regional emissions analysis requirement applies one
year after the effective date of EPA’s nonattainment designation for a NAAQS and until the ef-
fective date of revocation of such NAAQS for an area. The 1997 ozone NAAQS revocation
Final FFYs 2021-2025 MVMPO TIP May 2020 125
was effective on April 6, 2015, and the South Coast II court upheld the revocation. As no re- gional emission analysis is required for this conformity determination, there is no requirement to use the latest emissions model, or budget or interim emissions tests.
Therefore, transportation conformity for the 1997 ozone NAAQS for the Merrimack Valley MPO FFY 2021-2025 Transportation Improvement Program and 2020-2040 Regional Transportation Plan can be demonstrated by showing that remaining requirements in Table 1 in 40 CFR 93.109 have been met. These requirements, which are laid out in Section 2.4 of EPA’s guidance and addressed below, include:
Latest planning assumptions (93.110)
• Consultation (93.112)
• Transportation Control Measures (93.113)
• Fiscal Constraint (93.108)
Latest Planning Assumptions:
The use of latest planning assumptions in 40 CFR 93.110 of the conformity rule generally ap- ply to regional emissions analysis. In the 1997 ozone NAAQS areas, the use of latest planning assumptions requirement applies to assumptions about transportation control measures (TCMs) in an approved SIP (See following section on Timely Implementation of TCMs).
Consultation:
The consultation requirements in 40 CFR 93.112 were addressed both for interagency consul- tation and public consultation. Interagency consultation was conducted with FHWA, FTA, US EPA Region 1, MassDEP, and the other Massachusetts MPOs, with the most recent conform- ity consultation meeting held on March 6, 2019 (this most recent meeting focused on under- standing the latest conformity-related court rulings and resulting federal guidance). This ongo- ing consultation is conducted in accordance with the following:
• Massachusetts’ Air Pollution Control Regulations 310 CMR 60.03 “Conformity to the State Implementation Plan of Transportation Plans, Programs, and Projects Developed, Funded or Approved Under Title 23 USC or the Federal Transit Act”
• The Commonwealth of Massachusetts Memorandum of Understanding by and between Massachusetts Department of Environmental Protection, Massachusetts Executive Of- fice of Transportation and Construction, Massachusetts Metropolitan Planning Organi- zations concerning the conduct of transportation-air quality planning in the development and implementation of the state implementation plan” (note: this MOU is currently being updated)
Public consultation was conducted consistent with planning rule requirements in 23 CFR 450.
Final FFYs 2021-2025 MVMPO TIP May 2020 126
Title 23 CFR Section 450.324 and 310 CMR 60.03(6)(h) requires that the development of the TIP, RTP, and related certification documents provide an adequate opportunity for public review and comment. Section 450.316(b) also establishes the outline for MPO public participation pro- grams. The Merrimack Valley MPO's Public Participation Plan was formally adopted in 2017. (MVMPO Public Participation Plan as Amended through March 2017) is posted on the MVPC.org website under Transportation - Merrimack Valley Metropolitan Planning Organization – Other MPO Documents. The Public Participation Plan ensures that the public will have access to the TIP/RTP and related documents, provides for public notification of the availability of the TIP/RTP and the public's right to review the document and comment thereon, and provides a 21-day public review and comment period prior to the adoption of the TIP/RTP and related certification documents.
The public comment period for this conformity determination commenced on May 1, 2020. Fol- lowing the 21-day public comment period, any comments received will be incorporated into the document. This allows ample opportunity for public comment and MPO review of the draft doc- ument. The public comment period will close on May 21, 2020 and subsequently, the Merrimack Valley MPO is expected to endorse this air quality conformity determination before June 2020. These procedures comply with the associated federal requirements.
Timely Implementation of Transportation Control Measures:
Transportation Control Measures (TCMs) have been required in the SIP in revisions submitted to EPA in 1979 and 1982. All SIP TCMs have been accomplished through construction or through implementation of ongoing programs. All of the projects have been included in the Re- gion's Transportation Plan (present or past) as recommended projects or projects requiring fur- ther study. These projects are:
Extension/ Addition of Bus Routes Construction of Park and Ride Lots Intersection Improvements
Demand Responsive Transit
Institution of Express/ Shuttle Bus Services
Subscription Van Service
Double peak-hour fixed route bus service in Lawrence and Haverhill
DEP submitted to EPA its strategy of programs to show Reasonable Further Progress of a
15% reduction of VOCs in 1996 and the further 9% reduction of NOx toward attainment of the National Ambient Air Quality Standards (NAAQS) for ozone in 1999. Within that strategy there are no specific TCM projects. The strategy does call for traffic flow improvements to reduce congestion and, therefore, improve air quality. Other transportation-related projects that have been included in the SIP control strategy are listed below:
• Enhanced Inspection and Maintenance Program
Final FFYs 2021-2025 MVMPO TIP May 2020 127
• California Low Emission Vehicle Program
• Reformulated Gasoline for On- and Off-Road Vehicles
• Stage II Vapor Recovery at Gasoline Refueling Stations
• Tier I Federal Vehicle Standards
Fiscal Constraint:
Transportation conformity requirements in 40 CFR 93.108 state that TIPs and transportation
plans must be fiscally constrained consistent with DOT’s metropolitan planning regulations at
23 CFR part 450. The Merrimack Valley MPO 2021-2025 Transportation Improvement Pro- gram and 2020-2040 Regional Transportation Plan are fiscally constrained, as demonstrated in the MVMPO RTP Fiscal Constraint Chapter and in the MVMPO TIP Part C.1. Highway Pro- gram Financial Plan and Part C.2. Transit program Financial Plan.
In summary and based upon the entire process described above, the Merrimack Valley MPO has prepared this conformity determination for the 1997 Ozone NAAQS in accordance with EPA’s and Massachusetts’ latest conformity regulations and guidance. This conformity deter- mination process demonstrates that the FFY 2021-2025 Transportation Improvement Program and the 2020-2040 Regional Transportation Plan meet the Clean Air Act and Transportation Conformity Rule requirements for the 1997 Ozone NAAQS, and have been prepared following all the guidelines and requirements of these rules during this time period.
Therefore, the implementation of the Merrimack Valley MPO’s FFY 2021-2025 Transportation
Improvement Program and the 2020-2040 Regional Transportation Plan are consistent with the air quality goals of, and in conformity with, the Massachusetts State Implementation Plan.
Final FFYs 2021-2025 MVMPO TIP May 2020 128
Projects Required for Implementation of ADA
Another requirement of 23 CFR 450.324 is that projects required for the implementation of the Americans with Disabilities Act (ADA) should be so marked. There are no projects in this TIP listing that are required for the implementation of the Americans with Disabilities Act and therefore no projects are marked as such. There are projects to replace existing accessible transit vehicles with new accessible transit vehicles, but these are replacements not implementations.
The Merrimack Valley Planning Commission (MVPC) operates its programs, services and activities in compliance with federal nondiscrimination laws including Title VI of the Civil Rights Act of 1964 (Title VI), the Civil Rights Restoration Act of 1987, and related statutes and regulations. Title VI prohibits discrimination in federally assisted programs and requires that
no person in the United States of America shall, on the grounds of race, color or national origin (including limited English proficiency) be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity receiving federal assistance. Related federal nondiscrimination laws administrated by the Federal Highway Administration, the Federal Transit Administration, or both, prohibit discrimination on the basis of age, sex and disability. These protected categories are contemplated within MVPC’s Title VI Program consistent with federal interpretation and administration. Additionally, MVPC provides meaningful access to its programs, services, and activities to individuals with limited English proficiency, in compliance with U.S. Department of Transportation policy and guidance on federal Executive Order 13166.
MVPC also complies with the Massachusetts Public Accommodation Law, M.G.L. Chapter
272, Sections 92a, 98, and 98a prohibiting making any distinction, discrimination, or restriction in admission to or treatment in a place of public accommodation based upon race, color, religious creed, national origin, sex, sexual orientation, disability, or ancestry. Likewise, MVPC complies with the Governor’s Executive Order 526, Section 4 requiring that all of its programs, activities, and services provided, performed, licensed, chartered, funded, regulated, or contracted for shall be conducted without unlawful discrimination based upon race, color, age, gender, ethnicity, sexual orientation, gender identity or expression, religion, creed, ancestry, national origin, disability, veteran’s status (including Vietnam-era veterans), or
background.
Final FFYs 2021-2025 MVMPO TIP May 2020 129
Additional Information
To request additional information regarding Title VI and related federal and state nondiscrimination obligations, please contact:
Title VI Program Coordinator
Merrimack Valley Metropolitan Planning Organization c/o Merrimack Valley Planning Commission
160 Main Street
Haverhill, MA 01830-5061 (978) 374-0519, extension 15 [email protected]
Complaint Filing
To file a complaint alleging a violation of Title VI or related federal nondiscrimination law, contact the Title VI Program Coordinator (above) within one hundred and eighty (180) days of the alleged discriminatory conduct.
To file a complaint alleging a violation of the Commonwealth’s Public Accommodation Law,
contact the Massachusetts Commission Against Discrimination within three hundred (300)
days of the alleged discriminatory conduct at:
Massachusetts Commission Against Discrimination (MCAD) One Ashburton Place, 6th Floor
Boston, MA 02109 (617) 994-6000
TTY: (617) 994-6196
Translation
English
If this information is needed in another language, please contact the MVMPO Title
VI/Nondiscrimination Coordinator at 978-374-0519 ext. 15.
Spanish
Si necesita esta información en otro idioma, por favor contacte al coordinador de MVMPO del
Título VI/Contra la Discriminación al 978-374-0519 ext. 15.
Portuguese
Caso estas informações sejam necessárias em outro idioma, por favor, contate o
Coordenador de Título VI e de Não Discriminação da MVMPO pelo telefone 978-374-0519, Ramal 15.
Final FFYs 2021-2025 MVMPO TIP May 2020 130
Chinese Simple
如果需要使用其它语言了解信息,请联系Merrimack Valley大都会规划组织(MVMPO)《民权 法案》第六章协调员,电话978-374-0519,转15。
Chinese Traditional
如果需要使用其他語言瞭解資訊,請聯繫Merrimack Valley大都會規劃組織(MVMPO)《民權 法案》第六章協調員,電話978-374-0519,轉15。
Vietnamese
Nếu quý vị cần thông tin này bằng tiếng khác, vui lòng liên hệ Điều phối viên Luật VI/Chống phân biệt đối xử của MVMPO theo số điện thoại 978-374-0519, số máy nhánh 15.
French Creole
Si yon moun vle genyen enfòmasyon sa yo nan yon lòt lang, tanpri kontakte Kowòdinatè kont
Diskriminasyon/MVMPO Title VI la nan nimewo 978-374-0519, ekstansyon 15.
Russian
Если Вам необходима данная информация на любом другом языке, пожалуйста, свяжитесь с Координатором Титула VI/Защита от дескриминации в MVMPO по тел: 978-374-0519, добавочный 15.
French
Si vous avez besoin d'obtenir une copie de la présente dans une autre langue, veuillez contac- ter le coordinateur du Titre VI/anti-discrimination de MVMPO en composant le 978-374-0519, poste 15.
Italian
Se ha bisogno di ricevere queste informazioni in un’altra lingua si prega di contattare il coordi-
natore del MVMPO del Titolo VI e dell'ufficio contro la discriminazione al 978-374-0519 interno
15.
Mon-Khmer, Cambodian
ប្រសិនបរើបោក-អ្ន កប្រូវការរកប្ប្រព័រ៌មានបនេះ
សូ មទាក់ទងអ្ន កសប្មរសប្មួលជំពូ កទី6/គ្មា នការប រសើ
374-0519 រចភ្ជា រ់បៅបលខ 15។
បអ្ើងររស់ MVMPO តាមរយៈបលខទូរស័ពទ 978-
Arabic
ﻱﻑﻱﺭﺽﺡﻝﺍﻁﻱﻁﺥﺕﻝﺍﺓ ﻡﻅﻥﻡﻝﻉﺏﺍﺕﻝﺍﻱﺯﻡﺕﻝﺍﻉﻥﻡﻝ ﺓﺱﺩﺱﺍ
ﻝﺓﺍﺭﻕﻑﻝﺍﻕﺱﻥﻡﺏﻝﺍﺹﺕلاﺍ ﻯﺝﺭُﻱ،ﻯﺭﺥﺃ ﺓ ﻍﻝﺏﺕﺍﻡﻭﻝﻉﻡﻝﺍ ﻩﺫﻩ ﻯﻝﺇ ﺓ ﺝﺍﺡﺏ ﺕﻥﻙﺍﺫﺇ
.15 ﻡﺍﻕﺭلأﺍ ﻁﻍﺽﺍ ﻡﺙﻭ 978-374-0519 :ﻑﺕﺍﻩ ﻝﺍ ﻯﻝﻉﻱﻝﺍﻑﻙﺍﻡ ﻱﺭﻱﻡ
Final FFYs 2021-2025 MVMPO TIP May 2020 131
Environmental Justice from a transportation perspective is the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation, and enforcement of transportation laws, regulations, and policies.
"Each Federal agency shall make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of its programs, policies, and activities on minority populations and low-income populations."
MVMPO Merrimack Valley Transportation Committee Equity Working Group
The MVMPO Merrimack Valley Transportation Committee’s (MVTC) purpose is to advise the MVMPO and participate in the MVMPO region’s federally certified transportation planning process. Its membership provides for the involvement of local government officials, transportation professionals, transportation providers, and individuals experienced in economic development, freight, commuter rail, smart growth, environmental issues, regional planning, and other interest groups, ensuring broad representation and a geographical balance of its participants.
MVTC Equity Working Group
The MVMPO is responsible for promoting, securing and evaluating public involvement in its transportation planning process. In particular, it is responsible for identifying and seeking meaningful participation of the region’s minority and low-income (Environmental Justice) populations – and in working to reduce participation barriers for such populations.
The MVMPO’s established EJ process includes identification of Census-based statistical areas within its region where:
a) the percentage of minority populations exceeds the average percentage of minority population for the region as a whole;
b) household incomes are 65% or less of area median income (AMI), and
c) there are concentrations of households with limited English proficiency (LEP).
The MVMPO established an Equity Working Group to provide the MVMPO members and staff with the perspectives of individuals and organizations representing low-income and minority populations. It is also an opportunity for MVMPO staff and EJ stakeholders to exchange information, evaluate policies, plans and projects, and generate ideas for future projects. The
MVMPO staff regularly consults with members of the Equity Working Group.
Final FFYs 2021-2025 MVMPO TIP May 2020 132
To help inform the work of the MVMPO, it is helpful to have members of the Equity Working Group who have individual and/or collective knowledge and expertise in working with EJ populations on:
a) Disabilities b) Education
c) English proficiency d) Elder Affairs
e) Faith-based community service f) Minority advocacy
g) Neighborhood organization
h) Non-profit community development i) Public Health
j) Veterans Affairs
k) Workforce training and development
The following tables illustrate a geographic and social equity analysis of highway funding in the
Merrimack Valley MPO region. Haverhill, Lawrence and Methuen are designated as Title VI and Environmental Justice (EJ) communities. The Title VI communities have Census Tracts with higher than average percentage of minorities than the regional average percentage and the same three communities are EJ communities with lower than average median income in some Census Tracts.
The following table shows the percent of population in Title VI / EJ communities relative to the percent of Federal highway funding programmed in the 2021 to 2025 TIP.
Region Population (ACS 11 to 15) | Percent of Total Population | TIP Project In- vestment | Percent of Projects by To- tal Investment | |
Within Title VI / EJ community | 189,490 | 55% | $212,238,824 | 69% |
Outside Title VI / EJ community | 154,420 | 45% | $94,064,256 | 31% |
Total | 343,910 | 100% | $306,303,080 | 100% |
This table illustrates consistency between the percent of population in Title VI/ EJ areas and
the percent of funding in those areas.
Final FFYs 2021-2025 MVMPO TIP May 2020 133
Persons with Limited English Proficiency (LEP) are those who self-report on the Census as speaking English ‘less than very well’. USDOT guidance defines “Safe harbor” languages as those non-English languages that are spoken by LEP persons who make up at least 5% of the population, or 1,000 individuals, whichever is less. Using this definition for LEP people ages 5+ living in the region the number of LEP individuals exceeds the 1,000-person threshold in Span- ish (32,513 people) and Chinese (1,124 people). The LEP persons in these two languages represent 83% of all LEP people in the region. Communities with more than 1,000 individuals whose “Safe-harbor” language is Spanish are Haverhill (3,010 people), Lawrence (25,355 peo- ple) and Methuen (3,352 people). Andover has the highest number of individuals (630 people) whose “Safe-harbor” language is Chinese. Therefore these 4 communities are considered LEP communities.
The following table shows the percent of population age 5+ in LEP communities relative to the percent of Federal highway funding programmed in the 2021 to 2025 TIP.
Region Population Age 5+ (ACS 11 to 15) | Percent of Total Population Age 5+ (ACS 11 to 15) | TIP Project Investment | Percent of Projects by To- tal Investment | |
Within LEP community | 208,754 | 65% | 248,292,836 | 81% |
Outside LEP community | 112,973 | 35% | 58,010,244 | 19% |
Total | 321,727 | 100% | $306,303,080 | 100% |
This table illustrates consistency between the percent of population in LEP areas and the per- cent of funding in those areas.
All of the Federal transit funding (100%) is considered to benefit Title VI, EJ and LEP commu- nities because all of the MVRTA fixed routes originate in the Title VI / EJ / LEP communities of Haverhill or Lawrence, or provide connections to these routes. The paratransit service also provides access to and from the Title VI, EJ and LEP communities.
All but one of the MVMPO region communities have had, or are programmed to have, Feder- ally funded projects from 2016 to 2025. (Looking at the tables that follow West Newbury, which is not a Title VI / EJ or LEP community, does not have a federally funded project in the ten-
year period, however it did have a Federally funded project in 2015.
Final FFYs 2021-2025 MVMPO TIP May 2020 134
The tables on the following pages show the projects included in the analysis for FFYs 2021 to
2025 and a summary chart showing the number of projects and the funding by community, and whether the community is a Title VI (high percentage of minorities), an EJ (high percentage of low-income households) and/or LEP community. This is followed by a table and analysis chart for projects programmed in FFYs 2016 to 2020.
For Title VI and EJ communities, the results show that for FFYs 2021 to 2025, 41% of the total number of projects are in Title VI and EJ communities. Considering the data for percent of funding, 69% of the funding is in Title VI and EJ communities.
For LEP communities, the results show that for FFYs 2021 to 2025, 45% of the total number of projects are in LEP communities. Considering the data for percent of funding, 81% of the fund- ing is in LEP communities.
For Title VI and EJ communities, the results show that for FFYs 2016 to 2020, 57% of the total number of projects are in Title VI communities and EJ communities. Considering the data for percent of funding, 69% of the funding is in Title VI communities and EJ communities.
For LEP communities, the results show that for FFYs 2016 to 2020, 63% of the total number of projects are in LEP communities. Considering the data for percent of funding, 77% of the fund- ing is in LEP communities.
All of the Transit funding (100%) is considered to benefit Title VI, EJ and LEP communities be- cause all of the MVRTA fixed routes originate in Haverhill or Lawrence, or provide connections to these routes. The paratransit service also provides access to and from the Title VI and EJ communities. The only mappable transit project in the FFYs 2021 to 2025 TIP is the SGR Riverbank Stabilization project it is labelled on the relevant maps as RTD - 9131. It is also the only mappable transit project in FFYs 2016 to 2020 project list it is labelled on these maps as RTD-7695. The transit project maps also include the fixed-route bus service routes.
MVMPO: FFYs 2021 to 2025 TIP Projects by Community
MVMPO: FFYs 2016 to 2020 Projects by Community
MVMPO: FFYs 2021 to 2025 Statewide and Regional Target Highway Projects overlaid on
Low Income and Minority Tracts
MVMPO: FFYs 2021 to 2025 Transit Projects and MVRTA Bus Routes overlaid on Low In- come and Minority Tracts
MVMPO: FFYs 2016 to 2020 Statewide and Regional Target Highway Projects overlaid on
Low Income and Minority Tracts
MVMPO: FFYs 2016 to 2020 Transit Projects and MVRTA Bus Routes overlaid on Low In- come and Minority Tracts
Final FFYs 2021-2025 MVMPO TIP May 2020 135
FFYs 2021 to 2025 MVMPO Statewide and Regional Target Highway Funding
Projects by Community for Equity Analysis
Community | Project Num- ber | Project Descrip- tion | Total Funding Pro- grammed | FFY | Title VI Com- mu- nity | EJ Com mu- nity | LEP Com mu- nity |
Andover | 606522 | Andover- Bridge Rehab., I-495 over Rt. 28 and RR | $36,054,012 | 2024 - 2025 | No | No | Yes |
Georgetown/ Boxford | 607541 | Georgetown/ Box- ford Border to Bos- ton Trail | $2,520,436 | 2022 | No | No | No |
Georgetown/ Newbury | 607542 | Georgetown/ New- bury Border to Bos- ton Trail | $5,685,060 | 2024 | No | No | No |
Groveland | 608298 | Groveland Commu- nity Trail | $1,984,861 | 2021 | No | No | No |
Haverhill | 605306 | Haverhill- Bridge Replacement I-495 over Merrimack (H- 12-039) | $46,503,796 | 2021 to 2023 | Yes | Yes | Yes |
Haverhill | 609466 | Haverhill- Bridge Replacement I-495 over Merrimack (H- 12-040) | $94,747,200 | 2023 to 2025 | Yes | Yes | Yes |
Haverhill | 605304 | Haverhill- Bridge Replacement Bridge St (Rt 125) over Merrimack and B&M RR | $45,861,496 | 2024 to 2025 | Yes | Yes | Yes |
Final FFYs 2021-2025 MVMPO TIP May 2020 136
Projects by Community for Equity Analysis (Cont.)
Commu- nity | Project Number | Project Descrip- tion | Total Funding Pro- grammed | FFY | Title VI Com- mu- nity | EJ Com mu- nity | LEP Com mu- nity |
Haverhill | 608761 | Haverhill- Intersec- tion Reconstruction Rt 108 (Newton Rd) at Rt 110 | $1,980,067 | 2021 | Yes | Yes | Yes |
Lawrence | 609509 | Lawrence – Inter- section Improve- ments at Merrimack Street and South Broadway (Route 28) | $1,610,960 | 2022 | Yes | Yes | Yes |
Lawrence | 609251 | Lawrence – Inter- section Improve- ments at South Broadway (Route 28) and Mount Vernon Street | $1,013,739 | 2021 | Yes | Yes | Yes |
Lawrence | 608930 | Lawrence- Law- rence Manchester Rail Corridor (LMRC) Rail Trail | $16,087,005 | 2023 | Yes | Yes | Yes |
Methuen | 610658 | Methuen – Intersec- tion Improvements at Riverside Drive and Burnham Road | $967,200 | 2022 | Yes | Yes | Yes |
Final FFYs 2021-2025 MVMPO TIP May 2020 137
Projects by Community for Equity Analysis (Cont.)
Community | Project Number | Project Descrip- tion | Total Funding Pro- grammed | FFY | Title VI Com- mu- nity | EJ Com mu- nity | LEP Com mu- nity |
Newbury/ New- buryport/ Salisbury | 608494 | Newbury/ New- buryport/ Salisbury Resurfacing Route 1 | $9,807,200 | 2022 | No | No | No |
Newburyport | 610663 | Newburyport – Riverfront Clipper City Rail Trail Con- struction | $1,900,802 | 2021 | No | No | No |
North Andover | 608095 | North Andover- Corridor Rt.114 from Andover St. to Stop & Shop | $26,906,533 | 2023 to 2025 | No | No | No |
Rowley | 609392 | Rowley – Safety Improvements at Route 1, Central and Glen Streets | $2,368,068 | 2025 | No | No | No |
Salisbury | 602202 | Salisbury Recon- struction of Route 1 (Lafayette Rd) | $6,837,284 | 2023 | No | No | No |
MVRTA | S10777 | MVRTA – Flex to FTA for 4 of 9 Buses | $3,467,361 | 2021 | Yes | Yes | Yes |
Total | Projects 21 to 25 | $306,303,080 |
Final FFYs 2021-2025 MVMPO TIP May 2020 138
FFYs 2021 to 2025 MVMPO Equity Analysis Highway Funding
Community | Number of Projects | Percent Of Projects | TIP Funding | Percent of Funding | Title VI Com- mu- nity | EJ Com- mu- nity | LEP Com- mu- nity |
Amesbury | 0 | 0% | $0 | 0% | No | No | No |
Andover | 1 | 5% | $36,054,012 | 11.8% | No | No | Yes |
Boxford | 1 | 5% | $1,260,218 | 0.4% | No | No | No |
Georgetown | 2 | 9% | $4,102,748 | 1.3% | No | No | No |
Groveland | 1 | 5% | $1,984,861 | 0.6% | No | No | No |
Haverhill | 4 | 18% | $189,092,559 | 61.7% | Yes | Yes | Yes |
Lawrence | 3 | 14% | $18,711,704 | 6.1% | Yes | Yes | Yes |
Merrimac | 0 | 0% | $0 | 0.0% | No | No | No |
Methuen | 1 | 5% | $967,200 | 0.3% | Yes | Yes | Yes |
Newbury | 2 | 9% | $6,111,597 | 2.0% | No | No | No |
Newburyport | 2 | 9% | $5,169,869 | 1.7% | No | No | No |
North Andover | 1 | 5% | $26,906,533 | 8.8% | No | No | No |
Rowley | 1 | 5% | $2,368,068 | 0.8% | No | No | No |
Salisbury | 2 | 9% | $10,106,350 | 3.3% | No | No | No |
West Newbury | 0 | 0% | $0 | 0.0% | No | No | No |
MVRTA | 1 | 5% | $3,467,361 | 1.1% | Yes | Yes | Yes |
Total | 22 | $306,303,080 |
Percent of Projects in Title VI Community = 41% Percent of Projects in EJ Community = 41% Percent of Projects in LEP Community = 45%
Percent of Funding in Title VI Community = 69% Percent of Funding in EJ Community = 69%
Percent of Funding in LEP Community = 81%
Final FFYs 2021-2025 MVMPO TIP May 2020 139
FFYs 2016 to 2020 MVMPO Statewide and Regional Target Highway Funding
Projects by Community for Equity Analysis
Commu- nity | Project Number | Project De- scription | Total Funding Pro- grammed | FFY | Title VI Com- mu- nity | EJ Com- mu- nity | LEP Com- mu- nity |
Amesbury | 602418 | Amesbury - Elm St. Reconstruc- tion (2019 = $3,955,071, 2020 = $7,223,053) | $11,178,124 | 2019- 2020 | No | No | No |
Amesbury | 606669 | Amesbury- Pow- wow Riverwalk | $671,207 | 2017 | No | No | Yes |
Amesbury/ Salisbury | 607737 | Amesbury- Salisbury Trail Connector at I- 95 | $3,167,723 | 2018 | No | No | No |
Andover/ Lawrence | 606574 | Andover/ Law- rence IM I-495 | $14,396,000 | 2016 | No/ Yes | No/ Yes | Yes/ Yes |
Andover/ Methuen | 607561 | Andover/ Me- thuen IM I-93 | $13,932,707 | 2017 | No/ Yes | No/ Yes | Yes/ Yes |
Groveland | 605114 | Groveland Rt 97 (School St & Salem St) | $2,040,502 | 2016 | No | No | No |
Haverhill | 608027 | Haverhill Brad- ford Rail Trail Ext. | $1,766,108 | 2020 | Yes | Yes | Yes |
Haverhill | 607573 | Haverhill- Route 97 (Broadway) | $6,526,912 | 2017 | Yes | Yes | Yes |
Final FFYs 2021-2025 MVMPO TIP May 2020 140
FFYs 2016 to 2020 MVMPO Statewide and Regional Target Highway Funding
Projects by Community for Equity Analysis (Cont.)
Commu- nity | Project Num- ber | Project Description | Total Funding Pro- grammed | FFY | Title VI Com- mu- nity | EJ Com- mu- nity | LEP Com- mu- nity |
Haverhill | 606161 | Haverhill- Improve- ments on Main St (Rt. 125) | $3,635,519 | 2016 | Yes | Yes | Yes |
Haverhill | 605306 | Haverhill- Bridge Re- placement I-495 over Merrimack (2018 = $19,797,733, 2019 = $23,703,426, 2020 = $15,305,880 | $58,807,039 | 2018 - 2020 | Yes | Yes | Yes |
Haverhill/ Merrimac/ Amesbury/ Salisbury | 608187 | Guide Signs on I-495 | $4,451,342 | 2017 | Yes/ No | Yes/ No | Yes/ No |
Lawrence | 608946 | Lawrence- Haverhill St (Route 110) at Ames Street | $1,267,500 | 2018 | Yes | Yes | Yes |
Lawrence | 608261 | Lawrence- Marston St./ Ferry St./ Commonwealth Ave. | $1,350,694 | 2017 | Yes | Yes | Yes |
Lawrence | 608002 | Lawrence- Safe Routes to School Bruce Elementary | $2,016,148 | 2017 | Yes | Yes | Yes |
Lawrence | 608407 | Lawrence- Signals/ ADA along Common & Lowell Streets | $2,880,512 | 2016 | Yes | Yes | Yes |
Final FFYs 2021-2025 MVMPO TIP May 2020 141
FFYs 2016 to 2020 MVMPO Statewide and Regional Target Highway Funding
Projects by Community for Equity Analysis (Cont.)
Commu- nity | Project Num- ber | Project Description | Total Funding Pro- grammed | FFY | Title VI Com- mu- nity | EJ Com- mu- nity | LEP Com- mu- nity |
Lawrence/ North Andover | 608809 | Lawrence- North Andover- Resurfac- ing Route 114 | $2,123,453 | 2018 | Yes/ No | Yes/ No | Yes/ No |
Lawrence/ North Andover | 607985 | Lawrence- North Andover- IM on I-495 | $7,198,000 | 2016 | Yes/ No | Yes/ No | Yes/ No |
Methuen | 607476 | Methuen- Rt 213 Re- surfacing and Bridge Repairs | $11,987,868 | 2016 | Yes | Yes | No |
New- buryport | 608792 | Newburyport- SRTS | $1,866,615 | 2019 | No | No | No |
North Andover | 606159 | North Andover- Rt 125/ Mass Ave | $5,446,662 | 2019 | No | No | No |
MVRTA | 604585 | Flex to FTA for MVRTA Cleaner Fuel Buses | $645,840 | 2017 | Yes | Yes | Yes |
MVRTA | MV000 1 | Flex to FTA for MVRTA Cleaner Fuel Buses | $698,541 | 2019 | Yes | Yes | Yes |
MVRTA | MV000 3 | Flex to FTA for MVRTA Bike Racks for Buses and for Transportation Cen- ters | $110,000 | 2019 | Yes | Yes | Yes |
Final FFYs 2021-2025 MVMPO TIP May 2020 142
FFYs 2016 to 2020 MVMPO Statewide and Regional Target Highway Funding
Projects by Community for Equity Analysis (Cont.)
Commu- nity | Project Number | Project Description | Total Funding Pro- grammed | FFY | Title VI Com mu- nity | EJ Com mu- nity | LEP Com- mu- nity |
Salisbury | 605020 | Salisbury- Multi-use trail extension (Borders- to-Boston), includes new bridge S-02-004 | $7,184,196 | 2018 | No | No | No |
Total All Projects 2016 to 2020 | $182,908,965 |
Final FFYs 2021-2025 MVMPO TIP May 2020 143
FFYs 2016 to 2020 MVMPO Equity Analysis Highway Funding
Community | Num ber of Pro- jects | Percent Of Projects | TIP Funding | Per- cent of Fund- ing | Title VI Com- munity | EJ Com- munity | LEP Com- munity |
Amesbury | 4 | 13% | $14,916 | 9% | No | No | No |
Andover | 2 | 7% | $14,164,354 | 9% | No | No | Yes |
Boxford | 0 | 0% | $0 | 0% | No | No | No |
Georgetown | 0 | 0% | $0 | 0% | No | No | No |
Groveland | 1 | 3% | $2,040,502 | 1% | No | No | No |
Haverhill | 5 | 17% | $72,219,359 | 46% | Yes | Yes | Yes |
Lawrence | 7 | 23% | $15,774,581 | 10% | Yes | Yes | Yes |
Merrimac | 1 | 3% | $1,483,781 | 1% | No | No | No |
Methuen | 2 | 7% | $18,954,222 | 12% | Yes | Yes | Yes |
Newbury | 0 | 0% | $0 | 0% | No | No | No |
Newburyport | 1 | 3% | $1,866,615 | 1% | No | No | No |
North Ando- ver | 2 | 7% | $6,508,389 | 4% | No | No | No |
Rowley | 0 | 0% | $0 | 0% | No | No | No |
Salisbury | 2 | 7% | $8,768,057 | 6% | No | No | No |
West Newbury | 0 | 0% | $0 | 0% | No | No | No |
MVRTA | 3 | 10% | $1,454,381 | 1% | |||
Total | 38 | $158,151,211 |
Percent of Projects in Title VI Community = 57% Percent of Projects in EJ Community = 57% Percent of Projects in LEP Community = 63%
Percent of Funding in Title VI Community = 69% Percent of Funding in EJ Community = 69%
Percent of Funding in LEP Community = 77%
Final FFYs 2021-2025 MVMPO TIP May 2020 144
FFYs 2021 to 2025 Transit Projects
FFY Year | Project Num- ber | Project Description | Total Project Cost |
2021 | RTD0009132 | SGR Replace Security Camera system at McGovern Center | $131,000 |
2021 | RTD0008602 | SGR Replace 1 Model Yr 2016 supervisory vehicle | $47,900 |
2021 | Replace Model Yr 2009 Buses Delivery 2022 (2 of 9) | $990,674 | |
2021 | RTD0008595 | Operating Assistance | $1,116,240 |
2021 | RTD0008592 | Preventive Maintenance | $3,495,970 |
2021 | RTD0007686 | Short Range Transit Planning | $100,000 |
2021 | RTD0009131 | Riverbank stabilization Construction | $1,750,330 |
2021 | RTD0008596 | Replace 16 Model Yr 2015 vans with new | $1,180,480 |
2021 | RTD0008593 | Non-Fixed Route ADA Para Serv | $1,741,065 |
2022 | RTD0008609 | SGR Replace 2 Model Yr 2016 supervisory vehicles | $97,740 |
2022 | RTD0008597 | Preventive Maintenance | $3,611,335 |
2022 | RTD0008599 | Short Range Transit Planning | $100,000 |
2022 | RTD0008600 | Operating Assistance | $1,289,890 |
2022 | RTD0008598 | Non-Fixed Route ADA Para Serv | $1,801,630 |
Final FFYs 2021-2025 MVMPO TIP May 2020 145
FFYs 2021 – 2025 MVMPO Transit Projects Funding (Cont.)
FFY Year | Project Num- ber | Project Description | Total Project Cost |
2023 | RTD0008604 | Operating Assistance | $1,478,730 |
2023 | RTD0008606 | Replace 4 Model Yr 2011 buses delivery 2023 | $2,009,600 |
2023 | RTD0008960 | SGR Replace 1 Model Yr 2017 supervisory vehicle | $50,335 |
2023 | RTD0008608 | Short Range Transit Planning | $100,000 |
2023 | RTD0008603 | Preventive Maintenance | $3,730,510 |
2023 | RTD0008607 | Replace 6 Model Yr 2017 vans delivery 2023 | $469,620 |
2023 | RTD0008605 | Non-Fixed Route ADA Para Serv | $1,861,090 |
2024 | RTD0008961 | SGR Replace 1 model year 2018 supervi- sory vehicle | $51,845 |
2024 | RTD0008614 | Short Range Transit Planning | $100,000 |
2024 | RTD0008611 | Preventive Maintenance | $3,618,265 |
2024 | RTD0008613 | Non-Fixed Route ADA Para Serv | $1,805,255 |
2024 | RTD0008610 | SGR Replace model yr 2011 Buses Deliv- ery 2024 (4 of 8) | $2,098,970 |
2024 | RTD0008612 | Operating Assistance | $1,429,680 |
2025 | RTD0008963 | Preventive Maintenance | $3,690,630 |
2025 | RTD0008665 | Non-Fixed Route ADA Para Serv | $1,841,365 |
Final FFYs 2021-2025 MVMPO TIP May 2020 146
FFYs 2021 – 2025 MVMPO Transit Projects Funding (Cont.)
FFY Year | Project Num- ber | Project Description | Total Project Cost |
2025 | RTD0008962 | Short Range Transit Planning | $100,000 |
2025 | RTD0008964 | Operating Assistance | $1,458,270 |
2025 | RTD0008615 | SGR Replace model yr 2012 Buses Deliv- ery 2025 (4 of 8) | $2,193,840 |
2025 | RTD0008966 | SGR Replace 1 model year 2019 supervi- sory vehicle | $52,880 |
Total Transit Project Funding 2021 to 2025 | $45,595,139 |
Final FFYs 2021-2025 MVMPO TIP May 2020 147
FFY Year | Project Number | Project Description | Total Project Cost |
2016 | ADA Operating Expense | $1,311,195 | |
2016 | Preventive Maintenance | $3,131,330 | |
2016 | Operating Assistance | $684,350 | |
2016 | Short Range Transit Planning | $50,000 | |
2016 | MVPC Technical Support to MVRTA | $50,000 | |
2016 | Replace 5 Model Yr 2011 Paratransit Ve- hicles | $320,000 | |
2016 | Acquire Support Vehicles | $90,000 | |
2017 | RTD0004541 | ADA Operating Expense | $1,371,830 |
2017 | RTD0004542 | Preventive Maintenance | $3,054,810 |
2017 | RTD0004552 | Operating Assistance | $1,257,050 |
2017 | RTD0004550 | Short Range Transit Planning | $100,000 |
2017 | RTD0004932 | Replace 7 Model Yr 2004 Buses with new | $2,989,000 |
2017 | RTD0004919 | Replace Parking Facilities Revenue Col- lection Equipment | $300,000 |
2017 | RTD0004989 | Bus/ Van Mobile Location Project | $300,000 |
Final FFYs 2021-2025 MVMPO TIP May 2020 148
FFY Year | Project Number | Project Description | Total Project Cost |
2017 | RTD0004540 | Refurbish Engines on 8 Model Year 2011 Buses | $280,000 |
2017 | RTD0004990 | Replace 1 Model Yr 2013 Support Vehicle | $46,350 |
2018 | RTD0005637 | ADA Operating Expense | $1,413,370 |
2018 | RTD0005638 | Preventive Maintenance | $3,152,905 |
2018 | RTD0005639 | Refurbish Engine/ trans 8 model year 2012 buses | $264,000 |
2018 | RTD0005642 | Operating Assistance | $643,010 |
2018 | RTD0005643 | Short Range Transit Planning | $100,000 |
2018 | RTD0005656 | Replace 6 Model Yr 2004 buses delivery 2018 | $2,689,500 |
2018 | RTD0005662 | Replace 1 Model Yr 2013 Support Vehicle | $47,750 |
2019 | RTD0006769 | Preventive Maintenance | $3,250,095 |
2019 | RTD0006770 | ADA Operating Expense | $1,456,420 |
2019 | RTD0006771 | Short Range Transit Planning | $100,000 |
2019 | RTD0006772 | Operating Assistance | $780,250 |
2019 | RTD0007127 | SGR Riverbank stabilization Design/Per- mitting | $235,035 |
Final FFYs 2021-2025 MVMPO TIP May 2020 149
FFY Year | Project Number | Project Description | Total Project Cost |
2019 | RTD0007126 | SGR Refurbish 4 vehicle lifts | $400,000 |
2019 | RTD0006785 | Replace 1 Model Yr 2013 Support Vehi- cle | $45,205 |
2020 | RTD0007680 | Preventive Maintenance | $3,323,160 |
2020 | RTD0007681 | Non-Fixed Route ADA Para Serv | $1,653,255 |
2020 | RTD0007682 | Short Range Transit Planning | $100,000 |
2020 | RTD0007683 | Operating Assistance | $861,550 |
2020 | RTD0007687 | Replace 3 Model Yr 2007 buses delivery 2020 | $1,377,150 |
2020 | RTD0007695 | SGR Riverbank stabilization Construction | $1,750,330 |
2020 | RDT0007696 | SGR Replace 1 Model Year 2013 super- visory vehicle | $46,530 |
2020 | RDT0008295 | NEET Driving Forward 2020 | $25,000 |
2020 | RTD0008320 | Town of Salisbury MAP Van for Svc Ex- pansion (1) | $68,000 |
2020 | RTD0008311 | Town of Andover MAP Buy Replacement Van (1) | $69,100 |
2020 | RTD0009193 | Purchase On-board Automatic Passenger Counters (APC) | $371,280 |
Total Transit Funding 2016 to 2020 | $39,558,810 |
Final FFYs 2021-2025 MVMPO TIP May 2020 150
This document was prepared in cooperation with the Massachusetts Department of
Transportation and the U.S. Department of Transportation. (under Contract #
108056 with MassDOT) The views and opinions of the Merrimack Valley Planning Commission expressed herein do not necessarily state or reflect those of the Massachusetts Department of Transportation or the U.S. Department of Transportation.
Page intentionally left blank.
Appendices | 1 | |
Appendix A | Other Regional Priority Bridge Projects | 2 |
Appendix B | Other Regional Priority Roadway Projects | 3 |
Appendix C | Transportation Evaluation Criteria Summary | 7 |
Appendix D | Sample Project Evaluation Worksheet | 13 |
Appendix E | Greenhouse Gas (GHG) Tracking | 19 |
FFYs 2021 to 2025 Projects GHG Tracking Summary 25 | ||
Appendix F | Completed Highway and Transit Projects GHG Summary | 81 |
Appendix G | List of Acronyms | 89 |
Appendix H | Key to Maps Showing Locations of Transportation Projects | 97 |
Appendix I Comments Received on Draft MVMPO FFYs 2021 to 2025 TIP ......... 101
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 1
Bridges That Do Not Fit into Fiscally Constrained Targets,
and therefore have No Funding Available in Any Year (By Town):
ID | Location | Project Description | Estimated Total Project Cost |
602322 | Ames. | Amesbury - Bridge Replacement, A-07-008, Oak Street Over the B&M Railroad (Abandoned Line) | $1,000,000 |
And. | Andover - Rehab. Bridge (A-09-001) Route 28 (North Main Street) Over the Shawsheen River | ||
605418 | And. | Andover - Bridge Preservation, A-09-028, Chandler Road over I-93 | $3,450,000 |
604839 | Law. | Lawrence – Bridge Replacement, L-04-027, Lowell Street over B&M Railroad | $4,473,000 |
Law. | Lawrence - Bridge Rehabilitation, L-04-042, South Union Connector over South Street | ||
Nbypt. | Newburyport - Bridge (N-11-002) State Route 113 (High Street) Over Railroad | ||
Nbypt. | Newburyport - Bridge (N-11-014) State Route 1A (High Street) over US 1 | ||
607115 | Nbypt. | Newburyport - Bridge Repairs, N-11-015, Washington St. over US 1 | $1,400,000 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 2
Roadway Projects That Do Not Fit into Fiscally Constrained Targets, and therefore have No Funding Available in Any Year (By Town)
ID | Location | Project Description | Estimated Total Project Cost |
608336 | Andover | Andover – Reconstruction on Route 133 (Lowell Street), from Lovejoy Road to Route 28 (North Main Street) TEC = 11.00 | $7,245,000 |
606721 | Boxford | Boxford - Reconstruction of Route 133 (Washington Street) from North Andover town line to Main Street TEC = 5.60 | $5,172,164 |
Boxford | Boxford Reconstruction of Route 97 from Georgetown to Topsfield (2 miles) | $3,785,000 | |
607540 | Boxford | Boxford - Border to Boston Trail TEC = 3.32 | $4,174,500 |
602843 | Georgetown | Georgetown – Reconstruction on Route 97 (W. Main Street) from Moulton Street to Groveland T.L. TEC = 6.63 | $6,662,599 |
Haverhill | Haverhill -Intersection Improvements Route 110 and Elliott Street | ||
Haverhill | Haverhill – Widen Route 97 (Broadway) from Computer Drive to Research Drive |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 3
Roadway Projects That Do Not Fit into Fiscally Constrained Targets,
and therefore have No Funding Available in Any Year (By Town):
ID | Location | Project Description | Estimated Total Project Cost |
608788 | Haverhill | Haverhill – Roadway Reconstruction on North Avenue, from Main Street (Route 125) to Plais- tow, NH TEC = 8.25 | $17,875,000 |
608721 | Haverhill | Haverhill – Corridor Improvements on Water Street (Route 97/113), from Ginty Boule- vard/Mill Street to Lincoln Boulevard/Riverside Avenue TEC = 8.18 | $8,050,000 |
602339 | Haverhill | Haverhill-Historic Waterfront Walkway Phase II (Construction) | $3,110,184 |
Lawrence/ North Andover | Lawrence - North Andover - Reconstruction of Route 114 from I-495 in Lawrence to Rt. 125 (Andover St.) in North Andover TEC = 13.05 | ||
Newbury- port | Newburyport -Route 1 Rotary Reconfiguration | ||
608029 | Newbury- port | Newburyport - Intersection Improvements Route 1 at Merrimac Street TEC = 7.67 | $2,400,000 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 4
Roadway Projects That Do Not Fit into Fiscally Constrained Targets,
and therefore have No Funding Available in Any Year (By Town):
ID | Location | Project Description | Estimated Total Project Cost |
North Andover | North Andover – Reconstruction of Mass. Ave. and Sidewalks (from Osgood St. to I-495) | ||
North Andover | North Andover - Signals and turn lanes at Mass Ave. and I-495 NB and SB Ramps | ||
607710 | Salisbury | Salisbury – Resurfacing and related work Route 1A | $2,300,000 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 5
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 6
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 7
Programmed for Fund- ing in Final TIP | ID# | Project Description | Project Cost in 1000s | AADT | Linear Lane Miles | Condition | Mobility | Safety & Security | Community Effects & Support | Land Use & Economic Development | Environmental Effects | Total TEC Score (2021- 2025) |
No | Lawrence –North Andover - Reconstruction of Rt. 114 from I-495 to Rt. 125 (Ando- ver St.) | 30,000 | 5.6 | 3.00 | 3.00 | 3.00 | 1.80 | 1.75 | 0.50 | 13.05 | ||
Yes | 608095 | North Andover – Recon- struction of Rt. 114 from Rt. 125 (Andover St.) to Stop & Shop | $25,057 | 30,000 | 4.8 | 2.00 | 2.75 | 2.67 | 1.40 | 1.75 | 0.75 | 11.32 |
Yes | 608930 | Lawrence – LMRC Rail Trail | $14,895 | NA | NA | 1.00 | 1.75 | 2.00 | 3.00 | 2.50 | 1.00 | 11.25 |
No | 608336 | Andover – Rt. 133 reconst. Lovejoy Road to Shawsheen Square (inc. Shawsheen Square) | $7,245 | 12,773 | 4.4 | 2.00 | 2.75 | 2.00 | 1.00 | 1.75 | 1.50 | 11.00 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 8
Programmed for Fund- ing in Final TIP | ID# | Project Description | Project Cost in 1000s | AADT | Linear Lane Miles | Condition | Mobility | Safety & Security | Community Effects & Support | Land Use & Economic Development | Environmental Effects | Total TEC Score (2021- 2025) |
Yes | 609509 | Lawrence – Intersection Im- provements at Merrimack Street and South Broadway (Route 28) | $1,549 | NA | NA | 2.50 | 2.25 | 2.00 | 1.20 | 2.25 | 0.50 | 10.70 |
Yes | 602202 | Salisbury – Reconstruction of Route 1 (Lafayette Road) | $6,331 | 12,147 | 4.8 | 2.00 | 2.00 | 2.33 | 0.60 | 1.5 | 0.5 | 8.93 |
Yes | 608761 | Haverhill - Intersection Im- provements at Rt. 110 / Rt. 108 | $1,980 | NA | NA | 1.50 | 1.75 | 1.67 | 1.20 | 1.75 | 1.00 | 8.87 |
No | 608788 | Haverhill - Reconstruction of North Ave. from Main St. to NH stateline | $17,875 | 13,172 | 4.0 | 2.50 | 1.75 | 1.00 | 2.00 | 0.00 | 1.00 | 8.25 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 9
Programmed for Fund- ing in Final TIP | ID# | Project Description | Project Cost in 1000s | AADT | Linear Lane Miles | Condition | Mobility | Safety & Security | Community Effects & Support | Land Use & Economic Development | Environmental Effects | Total TEC Score (2021- 2025) |
No | 608721 | Haverhill - Corridor Im- provements on Water St. from Ginty Blvd / Mill St. to Lincoln Ave./ Riverside Ave. | $8,050 | 20,200 | 2.0 | 1.50 | 1.75 | 1.33 | 1.60 | 1.25 | 0.75 | 8.18 |
No | 608029 | Newburyport – Intersection Improvements Rt. 1 at Mer- rimac St. | $2,400 | 24,850 | NA | 2.00 | 0.50 | 2.67 | 1.00 | 1.25 | 0.25 | 7.67 |
No | 602843 | Georgetown – Reconstruc- tion on Route 97 (W. Main) from Moulton St. to Groveland TL | $7,239 | 15,486 | 2.2 | 1.50 | 1.25 | 1.33 | 0.80 | 1.50 | 1.00 | 7.38 |
In 2020 TIP | 608027 | Haverhill – Bradford Rail Trail extension | $1,766 | NA | NA | 0.50 | 1.50 | 1.00 | 2.40 | 1.25 | 0.50 | 7.15 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 10
Programmed for Fund- ing in Final TIP | ID# | Project Description | Project Cost in 1000s | AADT | Linear Lane Miles | Condition | Mobility | Safety & Security | Community Effects & Support | Land Use & Economic Development | Environmental Effects | Total TEC Score (2021- 2025) |
Yes | 609251 | Lawrence – Intersection Im- provements at South Broad- way (Route 28) and Mount Vernon St. | $1,014 | NA | NA | 2.00 | 1.00 | 1.67 | 1.60 | 0.50 | 0.25 | 7.02 |
Yes | 610663 | Newburyport – Riverfront Clip- per City Rail Trail | $1,901 | NA | NA | 1.50 | 1.25 | 1.00 | 1.00 | 1.75 | 0.50 | 7.00 |
Yes | 610658 | Methuen – Intersection Im- provements at Riverside Drive and Burnham Road | $930 | NA | NA | 1.50 | 1.25 | 1.67 | 1.60 | 0.25 | 0.25 | 6.52 |
No | 606721 | Boxford - Route 133 (North Andover TL to Main St.) | $5,172 | 6,149 | 2.9 | 1.50 | 1.00 | 1.00 | 0.60 | 0.50 | 1.00 | 5.60 |
Yes | 607542 | Georgetown – Newbury – Bor- der to Boston Trail (Northern Georgetown to Byfield Sec- tion) | $5,076 | NA | NA | 0.50 | 1.25 | 0.67 | 0.80 | 1.50 | 0.50 | 5.22 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 11
Programmed for Fund- ing in Final TIP | ID# | Project Description | Project Cost in 1000s | AADT | Linear Lane Miles | Condition | Mobility | Safety & Security | Community Effects & Support | Land Use & Economic Development | Environmental Effects | Total TEC Score (2021- 2025) |
Yes | 607541 | Georgetown – Boxford – Bor- der to Boston Trail, from Georgetown Road to West Main Street (Route 97) | $2,423 | NA | NA | 0.50 | 1.25 | 0.67 | 0.80 | 1.25 | 0.75 | 5.22 |
Yes | 608298 | Groveland - Community Trail | $1,985 | NA | NA | 0.50 | 1.25 | 0.67 | 1.20 | 1.00 | 0.25 | 4.87 |
Yes | 609392 | Rowley – Safety Improve- ments at Route 1, Central and Glen Streets | $2,041 | NA | NA | 0.50 | 1.00 | 1.33 | 1.00 | 0.25 | 0.00 | 4.08 |
No | 607540 | Boxford – section of Border to Boston Trail | $4,175 | NA | NA | 0.50 | 1.00 | 0.67 | 0.40 | 0.50 | 0.25 | 3.32 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 12
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 13
Sample Project Evaluation Worksheet
Merrimack Valley Planning Commission and MassDOT Evaluation Criteria
Project: Andover - Reconstruct Rt. 133 from Lovejoy Rd to Rt. 28 Project #: 608336
Project Cost: $7,245,000 AADT: 12,773 Distance: 2.2 Linear Lane Miles: 4.4
Condition | Score | Additional Comments |
A. Magnitude of pavement condition improvement. | 2 | PNF indicates longitudinal & lateral pavement cracking, utility patch failure, shoving and rutting of pavement along route. |
B. Magnitude of improvement of other infrastructure. | 2 | Current shoulder width 0' to 2', project to increase shoulder width to 4' or 5' for bikes and > safety for pe- destrians, upgrade signals, drainage improvements |
Condition Average | 2.0 |
Mobility | Score | Additional Comments |
A. Effect on magnitude and duration of congestion. | 3 | Adding left turn lanes at intersection at MA-133/ Lovejoy /Greenwood. Also Rt 133/ Rt 28 improvements |
B. Effect on travel time and connectivity / access. | 2 | Widening shoulder, realigning Rt 133/ Lovejoy and add- ing left turn lanes. |
C. Effect on other modes using the facility. | 3 | Widening shoulder for bicycles, sidewalks on both sides. |
D. Effect on regional and local traffic. | 3 | Widening shoulder, adding left turn lanes. Additional connector I-495 to I-93. NHS roadway. |
Mobility Average | 2.75 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 14
Sample Project Evaluation Worksheet (Cont.)
Project: Andover - Reconstruct Rt. 133 from Lovejoy Rd to Rt. 28 Project #: 608336
Safety and Security | Score | Additional Comments |
A. Effect on crash rate compared to State average. | 3 | PNF Rt 133/ Lovejoy / Greenwood has a crash rate of .94, District 4 average is .78 and the arterial between two signalized intersections is 3.8, Avg. is 2.12. Have had 1 pedestrian with injuries and 1 bicycle crash. |
B. Effect on bicycle and pedestrian safety. | 2 | Widening shoulder for bicycles and provides greater safety for pedestrians. |
C. Effect on transportation security and evacuation routes/ | 1 | Is an NHS roadway. Is an evacuation route. |
Safety and Security Average | 2.00 |
Community Effects and Support | Score | Additional Comments |
A. Residential effects: ROW, noise, aesthetics, cut through traffic, and other. | 2 | For the most part all within ROW. General appearance and less noise from better pavement conditions. |
B. Public, local government, legislative, and regional sup- port. | 2 | |
C. Effect on service to minority or low-income neighbor- hoods. (Title VI and EJ) | 0 | Not Title VI or EJ area. |
D. Other impacts / benefits to minority or low-income neighborhoods. (Title VI and EJ). | 0 | Not Title VI or EJ area. |
E. Effect on development and redevelopment of housing | 1 | |
Community Effects and Support Average | 1.00 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 15
Sample Project Evaluation Worksheet (Cont.)
Project: Andover - Reconstruct Rt. 133 from Lovejoy Rd to Rt. 28 Project #: 608336
Land Use and Economic Development | Score | Additional Comments |
A. Business effects; ROW, noise, traffic, parking, freight access, other. | 2 | Improve access to existing businesses. |
B. Sustainable development effects. Consistent with MVPGS. | 2 | Access to MVPGS Rolling Green Regional PDA. Improves transportation choice (walk/bike) for area resi- dents. |
C. Consistent with regional land-use and economic devel- opment plans and PGS. | 2 | Access to MVPGS Rolling Green Regional PDA. Improves transportation choice (walk/bike) for area resi- dents. |
D. Effect on job creation. | 1 | Should provide better access to Brickstone Square State PDA. |
Land Use and Economic Development Average | 1.75 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 16
Sample Project Evaluation Worksheet (Cont.)
Project: Andover - Reconstruct Rt. 133 from Lovejoy Rd to Rt. 28 Project #: 608336
Environmental Effects | Score | Additional Comments |
A. Air quality / Climate effects. GHG Impact Description – Assumed Nominal Decrease in Emissions from Other Improvements | 2 | Adding bike lanes and sidewalks. Reducing delays at intersections. |
B. Water quality/supply effects; wetlands effects. | 1 | There will be deep sump catch basins |
C. Historic and cultural resources effects. | 3 | Shawsheen Village Historic District |
D. Effect on wildlife habitat and endangered species. | 0 | Not endangered species habitat area. |
Environmental Effects Average | 1.5 | |
Overall Project TEC score | 11.00 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 17
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 18
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 19
This section summarizes the greenhouse gas (GHG) impacts that are anticipated to result from the projects that are included in this FFY 2021 – 2025 Transportation Improvement Program (TIP). It includes a summary of the state laws and policies that call for reducing greenhouse gas in order to mitigate global climate change, actions that respond to these state laws and policies, the role of regional planning and TIP development in reducing GHG emission and tracking these reductions, and the projected GHG emission impacts from the projects programmed in the TIP.
The Global Warming Solutions Act (GWSA), which was signed into law in August 2008, makes Massachusetts a leader in setting aggressive and enforceable GHG reduction targets, and implementing policies and initiatives to achieve these targets. In keeping with the law, on December 29, 2010 the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA), in consultation with other state agencies and the public, released the Massachusetts Clean Energy and Climate Plan for 2020. In December 2014 the Department of Environmental Protection (DEP) issued new regulations that require Metropolitan Planning Organizations to quantify impacts from project investments, track progress towards reductions, and consider impacts in the prioritization of project investments. The targets for overall statewide GHG emissions are:
• By 2020: 25 percent reduction below statewide 1990 GHG emission levels, and
• By 2050: 80 percent reduction below statewide 1990 GHG emission levels
The Commonwealth’s MPOs are integrally involved in supporting the GHG reductions mandated under the GWSA. The MPOs are most directly involved in helping to achieve the GHG emissions reductions through the promotion of healthy transportation modes through prioritizing and programming an appropriate balance of roadway, transit, bicycle and pedestrian investments – and assisting smart growth development patterns through the creation of a balanced multi-modal transportation system. This is realized through the transportation goals and policies espoused in the Regional Transportation Plans (RTPs),
the major projects planned in the RTPs, and the mix of new transportation projects that are
programmed and implemented through the TIPs. GHG tracking and evaluation processes
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 20
enable the MPOs to identify the anticipated GHG impacts of planned and programmed projects, and also to use GHG impacts as a criterion in prioritizing transportation projects.
It is also important to monitor and evaluate the GHG impacts of the transportation projects that are programmed in the MPOs’ TIPs. The TIPs include both the larger, regionally- significant projects from the RTPs, which are reported in the Statewide GHG report, as well as smaller projects that are not included in the RTP but that may nevertheless have
impacts on GHG emissions. The primary objective of this tracking is to enable the MPOs to evaluate expected GHG impacts of different projects and to use this information as a criterion for prioritizing and programming projects.
MassDOT has adopted spreadsheets used by MPOs to determine CMAQ eligibility and that also include CO2 impacts. The data and analysis required for these calculations is available from functional design reports that are submitted for projects that would produce a measurable GHG impact.
RTP Projects
Major capacity expansion projects are expected to have a significant impact on GHG emissions. These projects are included in each MPO’s RTP and analyzed using either the statewide model or Boston MPO’s regional model, which reflect GHG impacts. As a result, no independent TIP calculations are required.
Quantified Decrease in Emissions
For those projects that are expected to produce a measurable decrease in emissions, the approach for calculating these impacts is described below. These projects are categorized in the following manner:
▪ Quantified Decrease in Emissions from Traffic Operational Improvement - An intersection reconstruction or signalization project that is projected to reduce delay and congestion.
▪ Quantified Decrease in Emissions from Pedestrian and Bicycle
Infrastructure - A shared-use path that enables increased walking and biking and decreased vehicle-miles traveled (VMT).
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 21
▪ Quantified Decrease in Emissions from New/Additional Transit Service - A bus or shuttle service that enables increased transit ridership and decreased VMT.
▪ Quantified Decrease in Emissions from a Park and Ride Lot - A park-and- ride lot that enables increased transit ridership/ increased ridesharing and decreased VMT.
▪ Quantified Decrease in Emissions from Bus Replacement
A bus replacement that directly reduces GHG emissions generated by service.
▪ Quantified Decrease in Emissions from Complete Streets Improvements - Improvements to roadway networks that include the addition of bicycle and pedestrian accommodations where none were present before.
▪ Quantified Decrease in Emissions from Alternative Fuel Vehicle Procurements – A vehicle procurement where alternative fuel/ advanced technology vehicles replace traditional gas or diesel vehicles.
▪ Quantified Decrease in Emissions from Anti-idling Strategies – Implementation of policies such as limiting idling allowed, incorporationg anti- idling technology into fleets and using LED lights on trucks for the purpose of illuminating worksites.
▪ Quantified Decrease in Emissions from Bike Share Projects – A new bike share project or capacity added to existing project.
▪ Quantified Decrease in Emissions from Induced Travel Projects – A project that changes roadway capacity.
▪ Quantified Decrease in Emissions from Speed Reduction Programs –
Programs that reduce speed to no less than 55 miles per hour.
▪ Quantified Decrease in Emissions from Transit Signal Priority Projects – A project that applies this technology to a signal intersection or along a corridor that impacts bus service.
▪ Quantified Decrease in Emissions from Truck Stop Electrification Projects
– A new truck stop electrification project or capacity added to an existing project.
▪ Quantified Decrease in Emissions from Other Improvement
Quantified Increase in Emissions
Projects expected to produce a measurable increase in emissions.
No Assumed Impact/Negligible Impact on Emissions - Projects that do not change the capacity or use of a facility (e.g. roadway median barrier or retaining wall replacement, or
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 22
bridge rehabilitation/replacement that restores the bridge to its previous condition) are assumed to have no/negligible GHG impact.
Qualitative Decrease in Emissions
Projects expected to produce a minor decrease in emissions that cannot be calculated with any precision. Examples of such projects include roadway repaving, signage improvement, ITS improvement, or transit marketing/customer experience improvement.
Qualitative Increase in Emissions
Projects expected to produce a minor increase in emissions that cannot be calculated with any precision.
The following tables summarize the calculated quantitative and assumed qualitative impacts of the projects included in the regional FFYs 2021 – 2025 TIP by year.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 23
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 24
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 25
2021 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary
Mass DOT/ | Total | GHG Analysis | GHG C02 Impact | GHG Impact Description | TotalCost | Additional Information | |
FTA | MassDOT/ FTA | Pro- | Type | (kg/yr) | |||
Project | Project Description | grammed | |||||
ID | Funds | ||||||
608761 | HAVERHILL- | $1,980,067 | Quantified | 8,307 | Quantified De- | $1,980,067 | |
INTERSECTION | crease in Emis- | ||||||
RECONSTRUCTION ON | sions from Traffic | ||||||
ROUTE 108 (NEWTON ROAD) AT ROUTE 110 | Operational 1m- provement | ||||||
(KENOZA AVENUE AND | |||||||
AMESBURY ROAD) | |||||||
609251 | LAWRENCE- | $1,013,739 | Quantified | 380,222 | Quantified De- | $1,013,739 | |
INTERSECTION | crease in Emis- | ||||||
IMPROVEMENTS AT | sions from Traffic | ||||||
SOUTH BROADWAY | Operational 1m- | ||||||
(ROUTE 28) AND | provement | ||||||
MOUNT VERNON | |||||||
STREET |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 26
2021 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
S10777 | MVRTA - FLEX TO FTA TO REPLACE YR 2009 BUSES WITH NEW BUSES DELIVERY 2022 (7 OF 9) | $3,467,361 | Quantified | 20,049 | Quantified Decrease in Emissions from Bus Replacement | $3,467,361 | |
608298 | GROVELAND- GROVELAND COMMUNITY TRAIL FROM MAIN STREET TO KING STREET | $1,984,861 | Quantified | 2,710 | Quantified Decrease in Emissions from Bi- cycle and Pedestrian Infrastructure | $1,984,861 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 27
2021 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
610663 | NEWBURYPORT - RIVERFRONT CLIPPER CITY RAIL TRAIL CONSTRUCTION | $1,900,802 | Qualitative | Qualitative De- crease in Emis- sions | $1,900,802 | GHG emis- sions had been in- eluded in quantifying Newburyport Clipper City Rail Trail Phase II Pro- ject # 606503 which has been com- pleted. | |
605306 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 039, 1-495 (NB & SB) OVER MERRIMACK RIVER | $15,305,880 | Qualitative | No assumed im- pact! negligible im- pact on emissions | $108,833,832 | AC Yr4 of6. |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 28
2022 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
607541 | GEORGETOWN- BOXFORD- BORDER TO BOSTON TRAIL, FROM GEORGETOWN ROAD TO WEST MAIN STREET (ROUTE 97) | $2,520,436 | Quantified | 2,667 | Quantified De- crease in Emis- sions from Bicycle and Pedestrian In- frastructure | $2,520,436 | |
605306 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 039, 1-495 (NB & SB) OVER MERRIMACK RIVER | $18,203,683 | Qualitative | No assumed im- pact/ negligible im- pact on emissions | $108,833,832 | AC Yr 5 of 6. |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 29
2022 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
609509 | LAWRENCE- INTERSECTION IMPROVEMENTS AT MERRIMACK STREET AND SOUTH BROADWAY (ROUTE 28) | $1,610,960 | Quantified | 52,372 | Quantified De- crease in Emis- sions from Traffic Operational lm- provement | $1,610,960 | |
610658 | METHUEN - INTERSECTION IMPROVEMENTS AT RIVERSIDE DRIVE AND BURNHAM ROAD | $967,200 | Quantified | 333,725 | Quantified De- crease in Emis- sions from Traffic Operational lm- provement | $967,200 | |
608494 | NEWBURY- NEWBURYPORT- SALISBURY- RESURFACING AND RELATED WORK ON ROUTE 1 | $9,807,200 | Qualitative | Qualitative De- crease in Emis- sions | $9,807,200 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 30
2023 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
602202 | SALISBURY- RECONSTRUCTION OF ROUTE 1 (LAFAYETTE ROAD) | $6,837,284 | Qualitative | Qualitative Decrease in Emissions | $6,837,284 | ||
608095 | NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN ROUTE 125(ANDOVER STREET) & STOP & SHOP DRIVEWAY | $4,401,056 | Qualitative | RTP project included in the Statewide model. | $27,061,794 | AC Yr 1 of 4 | |
608930 | LAWRENCE- LAWRENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL | $16,087,005 | Quantified | 175,927 | Quantified Decrease in Emissions from Bi- cycle and Pedestrian Infrastructure | $16,087,005 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 31
2023 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 lm- pact (kg/yr) | GHG Impact Description | TotalCost | Addti ional Information |
605306 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 039, 1-495 (NB & SB) OVER MERRIMACK RIVER | $12,994,233 | Qualitative | No assumed impact/ negligible impact on emissions | $108,833,832 | AC Yr 6 of 6. | |
609466 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 040, 1-495 (NB & SB) OVER MERRIMACK RIVER | $22,901,531 | Qualitative | No assumed impact/ negligible impact on emissions | $99,783,090 | AC Yr 1 of 3. |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 32
12024 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 lm- pact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
606522 | ANDOVER- BRIDGE REHABILITATION, A- 09-036, 1-495 OVER ST 28 (SB), A-09-037, 1-495 OVER B&M AND MBTA, A-09-041, 1-495 OVER ST 28 (NB) | $15,056,661 | Qualitative | No assumed impacU negligible impact on emissions | $131,458,071 | AC Yr 1 of 5 | |
607542 | GEORGETOWN- NEWBURY- BORDER TO BOSTON TRAIL, (NORTHERN GEORGETOWN TO BYFIELD SECTION) | $5,685,059 | Quantified | 15,682 | Quantified Decrease in Emissions from Bicycle and Pedestrian Infra- structure | $5,685,059 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 33
2024 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kg/yr) | GHG Impact Description | TotalCost | Additional Information |
608095 | NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN ROUTE 125 (ANDOVER STREET) & STOP & SHOP DRIVEWAY | $11,385,638 | Qualitative | RTP project included in the Statewide model. | $27,061,794 | AC Yr 2 of 4 | |
609466 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 040, 1-495 (NB & SB) OVER MERRIMACK RIVER | $43,180,558 | Qualitative | No assumed impact/ negligible impact on emissions | $99,783,090 | AC Yr 2 of 3. |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 34
12024 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 lm- pact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
605304 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 007 & H-12-025, BRIDGE STREET (SR 125) OVER MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY) | $17,912,404 | Qualitative | No assumed impact/ negligible impact on emissions | $116,320,512 | AC Yr 1 of 5. |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 35
2025 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 lm- pact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
608095 | NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN ROUTE 125 (ANDOVER STREET) & STOP & SHOP DRIVEWAY | $11,119,839 | Qualitative | RTP project included in the Statewide Model. | $27,061'794 | AC Yr 3 of 4 | |
609392 | ROWLEY - SAFETY IMPROVEMENTS AT ROUTE 1, CENTRAL AND GLEN STREETS | $2,368,068 | Qualitative | Not enough infor- mation available to quantify. | $2,368,068 | ||
609466 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 040, 1-495 (NB & SB) OVER MERRIMACK RIVER | $33,701,001 | Qualitative | No assumed impact/ negligible impact on emissions | $99,783,090 | AC Yr 3 of 3. |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 36
2025 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 lm- pact (kg/yr) | GHG Impact Description | Total Cost | Additional Information |
605304 | HAVERHILL- BRIDGE REPLACEMENT, H-12- 007 & H-12-025, BRIDGE STREET (SR 125) OVER MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY) | $27,949,092 | Qualitative | No assumed impacU negligible impact on emissions | $116,320,512 | AC Yr 2 of 5. | |
606522 | ANDOVER- BRIDGE REHABILITATION, A- 09-036, 1-495 OVER ST 28 (SB), A-09-037, 1-495 OVER B&M AND MBTA, A-09-041, 1-495 OVER ST 28 (NB) | $20,997,351 | Qualitative | No assumed impacu negligible impact on emissions | $131,458,071 | AC Yr 2 of 5 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 37
2021 Merrimack Valley Region Transit Projects GHGs | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008592 | Preventive Maintenance | $3,495,970 | Qualitative | No assumed impact/ negligible impact on emissions | $3,495,970 | |
RTD0008593 | Non-Fixed Route ADA Para Serv | $1,741,065 | Qualitative | No assumed impact/ negligible impact on emissions | $1,741,065 | |
RTD0008594 | Short Range Transit Plan- ning | $100,000 | Qualitative | No assumed impact/ negligible impact on emissions | $100,000 | |
RTD0008595 | Operating Assistance | $1,116,240 | Qualitative | No assumed impact/ negligible impact on emissions | $1,116,240 | |
RTD0008596 | Replace 16 Model Yr 2015 vans with new | $1'180,480 | Quantified | 33,208 | Quantified Decrease in Emissions from Bus Replacement | $1'180,480 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 38
2021 MerrimackValley Region Transit Projects GHGs (Cont.) | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0007697 | SGR Replace 1 model yr 2016 supervisory vehicle | $47,900 | Qualitative | No assumed impact/ negligible impact on emissions | $47,900 | |
RTD0009132 | SGR Replace Security Cam- era System at McGovern Center | $131,000 | Qualitative | No assumed impact/ negligible impact on emissions | $131,000 | |
RTD0009131 | Riverbank Stabilization Con- struction | $1,750,330 | Qualitative | No assumed impact/ negligible impact on emissions | $1,750,330 | |
TBD | Replace Model Yr 2009 Buses Delivery 2022 (2 of 9) | $990,674 | Quantified | 5,728 | Quantified Decrease in Emissions from Bus Replacement | $990,674 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 39
2022 Merrimack Valley Region Transit Projects GHGs | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008597 | Preventive Maintenance | $3,611,335 | Qualitative | No assumed impact/ negligible impact on emissions | $3,611,335 | |
RTD0008598 | Non-Fixed Route ADA Para Serv | $1,801,630 | Qualitative | No assumed impact/ negligible impact on emissions | $1,801,630 | |
RTD0008599 | Short Range Transit Plan- ning | $100,000 | Qualitative | No assumed impact/ negligible impact on emissions | $100,000 | |
RTD0008600 | Operating Assistance | $1,289,890 | Qualitative | No assumed impact/ negligible impact on emissions | $1,289,890 | |
RTD0008609 | SGR Replace 2 model year 2016 supervisory vehicles | $97,740 | Qualitative | No assumed impact/ negligible impact on emissions | $97,740 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 40
2023 Merrimack Valley Region Transit Projects GHGs | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008603 | Preventive Maintenance | $3,730,510 | Qualitative | No assumed impact/ negligible impact on emissions | $3,730,510 | |
RTD0008604 | Operating Assistance | $1,478,730 | Qualitative | No assumed impact/ negligible impact on emissions | $1,478,730 | |
RTD0008605 | Non-Fixed Route ADA Para Serv | $1,861,090 | Qualitative | No assumed impact/ negligible impact on emissions | $1,861,090 | |
RTD0008606 | Replace 4 Model Yr 2011 buses delivery 2023 | $2,009,600 | Qualitative | Not enough information to calculate | $2,009,600 | |
RTD0008607 | Replace 6 model yr 2017 vans delivery 2023 | $469,620 | Qualitative | Not enough information to calculate | $469,620 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 41
2023 Merrimack Valley Region Transit Projects GHGs (Cont.) | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008608 | Short Range Transit Plan- ning | $100,000 | Qualitative | No assumed impact/ negligible impact on emissions | $100,000 | |
RTD0008960 | SGR Replace 1 model yr 2017 supervisory vehicle | $50,335 | Qualitative | No assumed impact/ negligible impact on emissions | $50,335 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 42
2024 Merrimack Valley Region Transit Projects GHGs | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008611 | Preventive Maintenance | $3,618,265 | Qualitative | No assumed impact/ negligible impact on emissions | $3,618,265 | |
RTD0008613 | Non-Fixed Route ADA Para Serv | $1,805,255 | Qualitative | No assumed impact/ negligible impact on emissions | $1,805,255 | |
RTD0008612 | Operating Assistance | $1,429,680 | Qualitative | No assumed impact/ negligible impact on emissions | $1,429,680 | |
RTD0008614 | Short Range Transit Plan- ning | $100,000 | Qualitative | No assumed impact/ negligible impact on emissions | $100,000 | |
RTD0008610 | SGR Replace model year 2011 buses delivery 2024 (4 of 8) | $2,098,970 | Qualitative | Not enough information to calculate | $2,098,970 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 43
12024 Merrimack Valley Region Transit Projects GHGs (Cont.) | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008961 | SGR Replace 1 model yr 2018 supervisory vehicle | $51,845 | Qualitative | No assumed impact/ negligible impact on emissions | $51,845 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 44
2025 Merrimack Valley Region Transit Projects GHGs | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008963 | Preventive Maintenance | $3,690,630 | Qualitative | No assumed impact/ negligible impact on emissions | $3,690,630 | |
RTD0008965 | Non-Fixed Route ADA Para Serv | $1,841,365 | Qualitative | No assumed impact/ negligible impact on emissions | $1,841,365 | |
RTD0008964 | Operating Assistance | $1,458,270 | Qualitative | No assumed impact/ negligible impact on emissions | $1,458,270 | |
RTD0008962 | Short Range Transit Plan- ning | $100,000 | Qualitative | No assumed impact/ negligible impact on emissions | $100,000 | |
RTD0008615 | SGR Replace model yr 2012 buses 4 of 8 delivery 2025 | $2,193,840 | Qualitative | Not enough information to calculate | $2,193,840 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 45
12025 Merrimack Valley Region Transit Projects GHGs (Cont.) | ||||||
MassDOT/ FTA Project ID | MassDOT/ FTA Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Total Cost |
RTD0008966 | SGR Replace 1 model yr 2019 supervisory vehicle | $52,880 | Qualitative | No assumed impact/ negligible impact on emissions | $52,880 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 46
Georgetown - Boxford Border-to-Boston Trail CMAQ Air Quality Worksheet
CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project
FILL IN SHADED BOXES ONLY
TIP YEAR: | 2022 | |
MPO: | Merrimack Valley | Municipality: Georgetown, Boxford |
Project: # 607541 Georgetown-Boxford Border to Boston Trail
Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):
If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :
A. Facility Length (L): 2.0 Miles
B. Service Area Radius (R): 1.0 Miles (Default = 1)
C. Service Area of Community(ies) (SA): L * 2R = SA 4 Sq. Miles D. Total Land Area of Community(ies) (T): 36.5 Sq. Miles E. Service Area % of Community(ies) Land Area (LA): SA / T = LA 11.0%
F. Total Population of Community(ies) (TP): 16,579 Persons G. Population Served by Facility (P): LA * TP = P 1,817 Persons H. Total Number of Households in Community(ies) (HH): 5,828 HH
I. Number of Households Served by Facility (HS): LA * HH = HS 639 HH
J. Total Number of Workers Residing in Community(ies) (W): 8,647 Persons K. Workers Per household (WPHH): W / HH = WPHH 1.48 Persons L. Workers in Service Area (WSA): HS * WPHH = WSA 948 Persons
M. Population Density of the Service area (PD): P / SA = PD 454 Persons Per Sq. Mile
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 47
Georgetown - Boxford Border-to-Boston Trail CMAQ Air Quality Worksheet (Cont.)
N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the right. (BMS) 0.8% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage.
http://www.census.gov/programs-surveys/acs/guidance/estimates.html
O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 7 One-Way Trips
P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 12 One-Way Trips
(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)
If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year
Note: A manual entry of the VMTR will override the calculated cell.
Step 3: MOVES 2014a Emission Factors for Unrestricted PM:
Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern
2020 Passenger | 2020 Passenger | 2020 Passenger | 2020 Passenger |
Summer VOC Factor | Summer NOx Factor | Summer CO Factor | Summer CO2 Factor |
grams/mile | grams/mile | grams/mile | grams/mile |
0.030 | 0.081 | 2.095 | 338.769 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 48
Georgetown - Boxford Border-to-Boston Trail CMAQ Air Quality Worksheet (Cont.)
Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):
Summer VOC | Summer NOx | Summer CO | Summer CO2 |
0.2 | 0.7 | 16.8 | 2,666.9 |
Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)
Project Emission Reduction First year cost
Emission Cost in kg per year per kilogram
Summer VOC Summer NOx Summer CO
Summer CO2
/ 0.2 = $10,545,326
/ 0.7 = $3,860,574
/ 16.8 = $150,023
/ 2,666.9 = $945
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 49
Georgetown - Newbury Border to Boston Trail CMAQ Air Quality Worksheet
CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project
FILL IN SHADED BOXES ONLY TIP YEAR: 2024
MPO: Merrimack Valley Municipality: Georgetown, Newbury
Project: # 607542 Georgetown-Newbury Border to Boston Trail
Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):
If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :
A. | Facility Length (L): | 3.6 | Miles | ||
B. | Service Area Radius (R): | 1.0 | Miles | (Default = 1) | |
C. | Service Area of Community(ies) (SA): | L * 2R = SA | 7.2 | Sq. Miles | |
D. | Total Land Area of Community(ies) (T): | 36.3 | Sq. Miles | ||
E. Service Area % of Community(ies) Land Area (LA): SA / T = LA 19.8% | |||||
F. | Total Population of Community(ies) (TP): | 15,088 | Persons | ||
G. | Population Served by Facility (P): LA * TP = P | 2,993 | Persons | ||
H. | Total Number of Households in Community(ies) (HH): | 5,808 | HH | ||
I. | Number of Households Served by Facility (HS): LA * HH = HS | 1,152 | HH | ||
J. | Total Number of Workers Residing in Community(ies) (W): | 8,055 | Persons | ||
K. | Workers Per household (WPHH): W / HH = WPHH | 1.39 | Persons | ||
L. | Workers in Service Area (WSA): HS * WPHH = WSA | 1,598 | Persons |
M. Population Density of the Service area (PD): P / SA = PD 416 Persons Per Sq. Mile
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 50
Georgetown - Newbury Border to Boston Trail CMAQ Air Quality Worksheet (Cont.)
N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the ri (BMS) 1.5% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage.
http://www.census.gov/programs-surveys/acs/guidance/estimates.html
O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 24 One-Way Trips
P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 40 One-Way Trips
(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)
If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year
Note: A manual entry of the VMTR will override the calculated cell.
Step 3: MOVES 2014a Emission Factors for Unrestricted PM:
Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern
2020 Passenger | 2020 Passenger | 2020 Passenger | 2020 Passenger |
Summer VOC Factor | Summer NOx Factor | Summer CO Factor | Summer CO2 Factor |
grams/mile | grams/mile | grams/mile | grams/mile |
0.030 | 0.081 | 2.095 | 338.769 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 51
Georgetown - Newbury Border to Boston Trail CMAQ Air Quality Worksheet (Cont.) Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):
Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)
Project Emission Reduction First year cost
Emission | Cost | in kg per year | per kilogram | |
Summer VOC | / | 1.4 = | $4,045,217 | |
Summer NOx | / | 3.8 = | $1,480,927 | |
Summer CO | / | 98.8 = | $57,549 | |
Summer CO2 | / | 15,681.6 = | $363 |
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 52
Groveland Community Trail Project # 608298 CMAQ Air Quality Worksheet
CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project
FILL IN SHADED BOXES ONLY TIP YEAR: 2022
MPO: Merrimack Valley Municipality: Groveland
Project: Groveland Community Trail Project # 608298
Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):
If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :
A. Facility Length (L): 2.2 Miles
B. Service Area Radius (R): 1.0 Miles (Default = 1)
C. Service Area of Community(ies) (SA): L * 2R = SA 4.4 Sq. Miles D. Total Land Area of Community(ies) (T): 8.9 Sq. Miles E. Service Area % of Community(ies) Land Area (LA): SA / T = LA 49.4%
F. Total Population of Community(ies) (TP): 6,646 Persons
G. Population Served by Facility (P): LA * TP = P 3,286 Persons
H. | Total Number of Households in Community(ies) (HH): | 2,385 | HH |
I. | Number of Households Served by Facility (HS): LA * HH = HS | 1,179 | HH |
J. | Total Number of Workers Residing in Community(ies) (W): | 3,405 | Persons |
K. | Workers Per household (WPHH): W / HH = WPHH | 1.43 | Persons |
L. | Workers in Service Area (WSA): HS * WPHH = WSA | 1,683 | Persons |
M. Population Density of the Service area (PD): P / SA = PD 747 Persons Per Sq. Mile
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 53
Groveland Community Trail Project # 608298 CMAQ Air Quality Worksheet (Cont.)
N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the righ (BMS) 0.4% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage. http://www.census.gov/programs-surveys/acs/guidance/estimates.html
O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 7 One-Way Trips
P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 11 One-Way Trips
(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)
If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year
Note: A manual entry of the VMTR will override the calculated cell.
Step 3: MOVES 2014a Emission Factors for Unrestricted PM:
Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern
2020 Passenger | 2020 Passenger | 2020 Passenger | 2020 Passenger |
Summer VOC Factor | Summer NOx Factor | Summer CO Factor | Summer CO2 Factor |
grams/mile | grams/mile | grams/mile | grams/mile |
0.030 | 0.081 | 2.095 | 338.769 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 54
Groveland Community Trail Project # 608298 CMAQ Air Quality Worksheet (Cont.)
Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):
Summer VOC | Summer NOx | Summer CO | Summer CO2 |
0.2 | 0.7 | 17.1 | 2,709.9 |
Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)
Project Emission Reduction First year cost
Emission Cost in kg per year per kilogram
Summer VOC Summer NOx Summer CO Summer CO2
/ 0.2 = $8,499,667
/ 0.7 = $3,111,672
/ 17.1 = $120,920
/ 2,709.9 = $762
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 55
Haverhill - Intersection Reconstruction on Route 108 at Route 110 CMAQ Air Quality Analysis Worksheet
CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements
FILL IN SHADED BOXES ONLY
TIP YEAR:
2021
MPO:
Merrimack Valley
Municipality:
Haverhill
Project:
# 608761 Intersection Reconstruction on Route 108 (Newton Road) at Roiute 110 (Kenoza Av & Amesbury Rd)
Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street
Name
Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 0 + SB = 0 + EB = 0 + WB = 0 +
= 0 +
= 0 +
= 0 +
= 0 +
= 0 = 0
= 0 = 0
= 0 = 0
= 0 = 0
Total Intersection Delay/Seconds = 0
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 56
Haverhill - Intersection Reconstruction on Route 108 at Route 110 CMAQ Air Quality Analysis Worksheet (Cont.)
Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street
Name
Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 0 + SB = 1,732 + EB = 2,454 + WB = 0 +
= 0 +
= 0 +
= 0 +
= 0 +
= 0 = 0
= 5,802 = 7,534
= 0 = 2,454
= 0 = 0
Total Intersection Delay/Seconds = 9,988
Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.
Peak Hour: PM
Total Intersection Delay:
9,988
Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:
Left-Turns Total Thru Total Right-Turns Total Total
Street
Name
Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 0 + SB = 2,424 + EB = 2,454 + WB = 0 +
= 0 +
= 0 +
= 0 +
= 0 +
= 0 = 0
= 1,755 = 4,179
= 0 = 2,454
= 0 = 0
Total Intersection Delay/Seconds = 6,634
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 57
Haverhill - Intersection Reconstruction on Route 108 at Route 110 CMAQ Air Quality Analysis Worksheet (Cont.)
Step 5: Calculate vehicle delay in hours per day:
Existing peak hour intersection delay
( Delay in seconds
( 9,988
X Hours per day) /
X 10 ) /
Seconds per hour
3600
= Delay in hours / day
= 27.7
Peak hour intersection delay w/
improvements (
X
6,634
/
10 )
3600
= 18.4
Step 6: MOVES 2014a emission factors for idling speed: AM or PM PM
2020 Summer VOC Factor grams/hour | 2020 Summer NOx Factor grams/hour | 2020 Winter CO Factor grams/hour | 2020 Summer CO2 Factor grams/hour | ||
0.249 | 0.630 | 3.569 | 3565.610 | ||
Step 7: Calculate net emissions change in kilograms per day: | |||||
Winter CO | Summer CO2 | ||||
Delay in | Summer VOC Emissions | Summer NOx Emissions | Emissions | Emissions | |
Hours per Day | kilograms/day | kilograms/day | kilograms/day | kilograms/da | |
Existing Conditions | 27.7 | 0.007 | 0.017 | 0.099 | 98.929 |
With Improvements | 18.4 | 0.005 | 0.012 | 0.066 | 65.701 |
Net Change | -0.002 | -0.006 | -0.033 | -33.228 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 58
Haverhill - Intersection Reconstruction on Route 108 at Route 110 CMAQ Air Quality Analysis Worksheet (Cont.)
Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)
Net change Avg. weekdays
Seasonal adj.
Adj. net change
per day (kg) X
per year X
factor
= in kg per year
Summer VOC Emissions -0.002 X 250 X 1.0188 = Summer NOx Emissions -0.006 X 250 X 1.0188 = Winter CO Emissions -0.033 X 250 X 0.9812 = Summer CO2 Emissions -33.228 X 250 X 1.000
Calculate cost effectiveness (first year cost per kg of emissions reduced)
-0.591
-1.494
-8.158
-8,306.881
Emission
Summer
VOC
Summer
NOx
Winter
CO
Summer
CO2
Project / Cost
/
/
/
/
Adj. net change =
in kg per year
-0.591 =
-1.494 =
-8.158 =
-8,306.881 =
First year cost per kilogram
3,352,093
1,324,943
242,707
238
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 59
Lawrence - Intersection Improvements at South Broadway (Rt 28) and Mount Vernon St CMAQ Air Quality Analysis Worksheet
CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements
FILL IN SHADED BOXES ONLY
TIP YEAR: MPO:
2021
Merrimack Valley
Municipality:
Lawrence
Project:
#609251 Intersection Improvements at South Broadway (Routet 28) and Mount Vernon St
Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 44,809 + SB = 0 + EB = 2,409 + WB = 79 +
= 81,141 +
= 9,088 +
= 0 +
= 0 +
= 0 = 125,949
= 703 = 9,791
= 8,665 = 11,074
= 158 = 237
Total Intersection Delay/Seconds = 147,051
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 60
Lawrence - Intersection Improvements at South Broadway (Rt 28) and Mount Vernon St CMAQ Air Quality Analysis Worksheet (Cont.)
Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 52,802 + SB = 0 + EB = 2,312 + WB = 67 +
= 122,460 +
= 6,691 +
= 0 +
= 0 +
= 0 = 175,262
= 987 = 7,678
= 5,856 = 8,168
= 44 = 111
Total Intersection Delay/Seconds = 191,218
Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.
Peak Hour: | PM | Total Intersection Delay: | 191,218 |
Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 3,363 + SB = 122 + EB = 3,804 + WB = 139 +
= 7,567 +
= 10,991 +
= 43 +
= 70 +
= 77 = 11,007
= 1,605 = 12,717
= 9,744 = 13,590
= 139 = 348
Total Intersection Delay/Seconds = 37,663
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 61
Lawrence - Intersection Improvements at South Broadway (Rt 28) and Mount Vernon St CMAQ Air Quality Analysis Worksheet (Cont.)
Step 5: Calculate vehicle delay in hours per day:
(
Delay in seconds
X Hours per day) /
Seconds per hour
= Delay in hours / day
Existing peak hour intersection delay
( 191,218
X 10 ) /
3600
= 531.2
Peak hour intersection delay w/ improvements (
X
37,663
/
10 )
3600
= 104.6
Step 6: MOVES 2014a emission factors for idling speed: AM or PM PM
2020 Summer VOC Factor grams/hour | 2020 Summer NOx Factor grams/hour | 2020 Winter CO Factor grams/hour | 2020 Summer CO2 Factor grams/hour | ||
0.249 | 0.630 | 3.569 | 3565.610 | ||
Step 7: Calculate net emissions change in kilograms per day: | |||||
Winter CO | Summer CO2 | ||||
Delay in | Summer VOC Emissions | Summer NOx Emissions | Emissions | Emissions | |
Hours per Day | kilograms/day | kilograms/day | kilograms/day | kilograms/da | |
Existing Conditions | 531.2 | 0.132 | 0.334 | 1.896 | 1,893.914 |
With Improvements | 104.6 | 0.026 | 0.066 | 0.373 | 373.027 |
Net Change | -0.106 | -0.269 | -1.522 | -1,520.887 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 62
Lawrence - Intersection Improvements at South Broadway (Rt 28) and Mount Vernon St CMAQ Air Quality Analysis Worksheet (Cont.)
Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)
Summer VOC Emissions Summer NOx Emissions Winter CO Emissions Summer CO2 Emissions
Calculate cost effectiveness (first year cost per kg of emissions reduced)
Emission
Project / Cost
/
Adj. net change =
in kg per year
First year cost per kilogram
Summer VOC
-27.037 =
37,494
/ Summer NOx
-68.404 =
14,820
Winter CO
/
-373.419 =
2,715
Summer CO2
/
-380,221.742 = 3
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 63
Lawrence - Intersection Improvements at Merrimack St and South Broadway (Rt 28) CMAQ Air Quality Analysis Worksheet
CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements
FILL IN SHADED BOXES ONLY
TIP YEAR: MPO:
2022
Merrimack Valley
Municipality:
Lawrence
Project:
# 609509 Intersection Improvements at Merrimack Street and South Broadway (Route 28)
Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 0 + SB = 8,116 + EB = 12 + WB = 4,874 +
= 13,677 +
= 21,216 +
= 0 +
= 0 +
= 2,318 = 15,994
= 29 = 29,360
= 0 = 12
= 2,666 = 7,540
Total Intersection Delay/Seconds = 52,907
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 64
Lawrence - Intersection Improvements at Merrimack St and South Broadway (Rt 28) CMAQ Air Quality Analysis Worksheet (Cont.)
Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 0 + SB = 17,991 + EB = 73 + WB = 3,608 +
= 16,016 +
= 17,086 +
= 24 +
= 21 +
= 2,600 = 18,616
= 50 = 35,127
= 24 = 122
= 5,347 = 8,976
Total Intersection Delay/Seconds = 62,841
Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.
Peak Hour: | PM | Total Intersection Delay: | 62,841 |
Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 0 + SB = 2,874 + EB = 319 + WB = 5,571 +
= 14,589 +
= 10,051 +
= 106 +
= 33 +
= 516 = 15,105
= 29 = 12,954
= 106 = 532
= 7,496 = 13,100
Total Intersection Delay/Seconds = 41,691
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 65
Lawrence - Intersection Improvements at Merrimack St and South Broadway (Rt 28) CMAQ Air Quality Analysis Worksheet (Cont.)
Step 5: Calculate vehicle delay in hours per day:
(
Delay in seconds
X Hours per day) /
Seconds per hour
= Delay in hours / day
Existing peak hour intersection delay
( 62,841
X 10 ) /
3600
= 174.6
Peak hour intersection delay w/ improvements (
X
41,691
/
10 )
3600
= 115.8
Step 6: MOVES 2014a emission factors for idling speed: AM or PM PM
2020 Summer VOC Factor grams/hour | 2020 Summer NOx Factor grams/hour | 2020 Winter CO Factor grams/hour | 2020 Summer CO2 Factor grams/hour | ||
0.249 | 0.630 | 3.569 | 3565.610 | ||
Step 7: Calculate net emissions change in kilograms per day: | |||||
Winter CO | Summer CO2 | ||||
Delay in | Summer VOC Emissions | Summer NOx Emissions | Emissions | Emissions | |
Hours per Day | kilograms/day | kilograms/day | kilograms/day | kilograms/da | |
Existing Conditions | 174.6 | 0.043 | 0.110 | 0.623 | 622.412 |
With Improvements | 115.8 | 0.029 | 0.073 | 0.413 | 412.924 |
Net Change | -0.015 | -0.037 | -0.210 | -209.488 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 66
Lawrence - Intersection Improvements at Merrimack St and South Broadway (Rt 28) CMAQ Air Quality Analysis Worksheet (Cont.)
Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)
Net change Avg. weekdays
Seasonal adj.
Adj. net change
per day (kg) X
per year X
factor
= in kg per year
Summer VOC Emissions -0.015 X 250 X 1.0188 = Summer NOx Emissions -0.037 X 250 X 1.0188 = Winter CO Emissions -0.210 X 250 X 0.9812 = Summer CO2 Emissions -209.488 X 250 X 1.000
Calculate cost effectiveness (first year cost per kg of emissions reduced)
First year cost per kilogram
-3.724
-9.422
-51.435
-52,371.982
/ Summer VOC
-3.724 =
432,573
/ Summer NOx
-9.422 =
170,978
Winter CO
/
-51.435 =
31,320
Summer CO2
/
-52,371.982 = 31
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 67
Lawrence Manchester Rail Corridor Rail Trail CMAQ Air Quality Worksheet
CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project
FILL IN SHADED BOXES ONLY TIP YEAR: 2023
MPO: Merrimack Valley Municipality: Lawrence
Project: Lawrence Manchester Rail Corridor (LMRC) Rail Trail Project # 608930
Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):
If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :
A. Facility Length (L): 1.5 Miles
B. Service Area Radius (R): 1.0 Miles (Default = 1)
C. Service Area of Community(ies) (SA): L * 2R = SA 2.92 Sq. Miles D. Total Land Area of Community(ies) (T): 6.93 Sq. Miles E. Service Area % of Community(ies) Land Area (LA): SA / T = LA 42.1%
F. Total Population of Community(ies) (TP): 79,337 Persons
G. Population Served by Facility (P): LA * TP = P 33,429 Persons
H. | Total Number of Households in Community(ies) (HH): | 25,759 | HH |
I. | Number of Households Served by Facility (HS): LA * HH = HS | 10,854 | HH |
J. | Total Number of Workers Residing in Community(ies) (W): | 33,261 | Persons |
K. | Workers Per household (WPHH): W / HH = WPHH | 1.29 | Persons |
L. | Workers in Service Area (WSA): HS * WPHH = WSA | 14,015 | Persons |
M. Population Density of the Service area (PD): P / SA = PD 11,448 Persons Per Sq. Mile
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 68
Lawrence Manchester Rail Corridor Rail Trail CMAQ Air Quality Worksheet (Cont.)
N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the righ (BMS) 4.7% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage. http://www.census.gov/programs-surveys/acs/guidance/estimates.html
O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 659 One-Way Trips
P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 1,120 One-Way Trips
(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)
If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year
Note: A manual entry of the VMTR will override the calculated cell.
Step 3: MOVES 2014a Emission Factors for Unrestricted PM:
Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern
2020 Passenger | 2020 Passenger | 2020 Passenger | 2020 Passenger |
Summer VOC Factor | Summer NOx Factor | Summer CO Factor | Summer CO2 Factor |
grams/mile | grams/mile | grams/mile | grams/mile |
0.030 | 0.081 | 2.095 | 338.769 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 69
Lawrence Manchester Rail Corridor Rail Trail CMAQ Air Quality Worksheet (Cont.)
Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):
Summer VOC | Summer NOx | Summer CO | Summer CO2 |
15.8 | 43.1 | 1,108.2 | 175,927.3 |
Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)
Project Emission Reduction First year cost
Emission Cost in kg per year per kilogram
Summer VOC Summer NOx Summer CO Summer CO2
/ 15.8 = $1,020,330
/ 43.1 = $373,536
/ 1,108.2 = $14,516
/ 175,927.3 = $91
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 70
Methuen - Intersection Improvements at Riverside Dr and Burnham Rd CMAQ Air Quality Analysis Worksheet
CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements
FILL IN SHADED BOXES ONLY
TIP YEAR: MPO:
2022
Merrimack Valley
Municipality:
Methuen
Project:
# 610658 Intersection Improvements at Riverside Drive and Burnham Road
Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 35 + SB = 2,293 + EB = 111 + WB = 1 +
= 35 +
= 382 +
= 553 +
= 61 +
= 159 = 230
= 2,407 = 5,082
= 4 = 668
= 17 = 79
Total Intersection Delay/Seconds = 6,058
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 71
Methuen - Intersection Improvements at Riverside Dr and Burnham Rd CMAQ Air Quality Analysis Worksheet (Cont.)
Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 25 + SB = 100,445 + EB = 244 + WB = 8 +
= 246 +
= 6,623 +
= 962 +
= 208 +
= 296 = 567
= 41,944 = 149,012
= 12 = 1,218
= 67 = 283
Total Intersection Delay/Seconds = 151,079
Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.
Peak Hour: | PM | Total Intersection Delay: | 151,079 |
Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:
Left-Turns Total Thru Total Right-Turns Total Total
Street Name Dir (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
+ (Vol / PHF) X delay per veh
= move. delay
= approach delay
NB = 9 + SB = 2,452 + EB = 985 + WB = 224 +
= 95 +
= 162 +
= 3,879 +
= 5,530 +
= 114 = 218
= 1,024 = 3,638
= 49 = 4,914
= 1,778 = 7,532
Total Intersection Delay/Seconds = 16,302
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 72
Methuen - Intersection Improvements at Riverside Dr and Burnham Rd CMAQ Air Quality Analysis Worksheet (Cont.)
Step 5: Calculate vehicle delay in hours per day:
Existing peak hour intersection delay
( Delay in seconds
( 151,079
X Hours per day) /
X 10 ) /
Seconds per hour
3600
= Delay in hours / day
= 419.7
Peak hour intersection delay w/ improvements (
X
16,302
/
10 )
3600
= 45.3
Step 6: MOVES 2014a emission factors for idling speed: AM or PM PM
2020 Summer VOC Factor | 2020 Summer NOx Factor | 2020 Winter CO Factor | 2020 Summer CO2 Factor | ||
grams/hour | grams/hour | grams/hour | grams/hour | ||
0.249 | 0.630 | 3.569 | 3565.610 | ||
Step 7: Calculate net emissions change in kilograms per day: | |||||
Winter CO | Summer CO2 | ||||
Delay in | Summer VOC Emissions | Summer NOx Emissions | Emissions | Emissions | |
Hours per Day | kilograms/day | kilograms/day | kilograms/day | kilograms/day | |
Existing Conditions | 419.7 | 0.104 | 0.264 | 1.498 | 1,496.360 |
With Improvements | 45.3 | 0.011 | 0.029 | 0.162 | 161.461 |
Net Change | -0.093 | -0.236 | -1.336 | -1,334.900 |
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 73
Methuen - Intersection Improvements at Riverside Dr and Burnham Rd CMAQ Air Quality Analysis Worksheet (Cont.)
Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)
Summer VOC Emissions Summer NOx Emissions Winter CO Emissions Summer CO2 Emissions
Calculate cost effectiveness (first year cost per kg of emissions reduced)
Emission
Summer
VOC
Summer
NOx
Project / Cost
/
/
Adj. net change =
in kg per year
-23.731 =
-60.039 =
First year cost per kilogram
40,757
16,110
Winter CO Summer
CO2
/
-327.755 =
/
-333,724.936 =
2,951
3
Spreadsheet Template Prepared by Office of Transportation Planning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 74
Merrimack Valley RTA Replace 7 (2009) Buses with 7 (2022) Buses
CMAQ Bus Replacement Air Quality Analysis Worksheet
FILL IN SHADED BOXES ONLY
TIP YEAR: 2021 Bus Replacements
MPO: Merrimack Valley RTA: Merrimack Valley
Project # S10777 - Flex to FTA to Replace 7 (2009) Buses with 7 (2022) Buses
Emission Rates in grams/mile at assumed operating speed bin of : 18 MPH (Bin 5 (17.5-22.5))
Scenario Comparison
Summer
VOC Summer NOx Winter CO
Summer
CO2
Existing Model* = New Bus Purchase** =
Model Year
(grams/mile) (grams/mile) (grams/mile) (grams/mile)
* Please contact OTP for assistance on Existing Model emission factors
** MOVES 2014a Commercial Emission Factors - Please Specify the Following:
AM or PM: PM
Restricted or
Unrestricted
Unrestricted
Change (Buy-Base)
Calculate fleet vehicle miles per day:
Revenue miles | X | Deadhead | = fleet miles | / operating days | = fleet miles |
per year factor per year per year per day |
247,441
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 75
Merrimack Valley RTA Replace 7 (2009) Buses with 7 (2022) Buses (Cont.) Calculate emissions change in kilograms per summer day
Change
Change in Summer VOC | -0.067 | 1,000 | 809 | 1.0188 |
Change in Summer NOx | -2.986 | 1,000 | 809 | 1.0188 |
Change in Winter CO | -0.384 | 1,000 | 809 | 0.9812 |
Change in Summer CO2 | -69.850 | 1,000 | 809 | 1.0000 |
Calculate emissions change in kilograms per year
Pollutant
Summer VOC Summer NOx Winter CO Summer CO2
Calculate cost effectiveness (cost per kg of emissions reduced)
Pollutant
Summer VOC Summer NOx Winter CO
Summer CO2
Template prepared by the Office of Transportation Plannning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 76
Merrimack Valley RTA Replace 16 (2015) Vans with 16 (2021) Vans
CMAQ Bus Replacement Air Quality Analysis Worksheet
FILL IN SHADED BOXES ONLY
TIP YEAR: 2021 Bus Replacements
MPO: Merrimack Valley RTA: Merrimack Valley
Project #RTD0008596 - Replace 16 (2015) Vans with 16 (2021) vans
Emission Rates in grams/mile at assumed operating speed bin of : 18 MPH (Bin 5 (17.5-22.5))
Scenario Comparison
Summer
VOC Summer NOx Winter CO
Summer
CO2
Existing Model* = New Bus Purchase** =
Model Year
(grams/mile) (grams/mile) (grams/mile) (grams/mile)
* Please contact OTP for assistance on Existing Model emission factors
** MOVES 2014a Commercial Emission Factors - Please Specify the Following:
AM or PM: PM
Restricted or
Unrestricted
Unrestricted
Change (Buy-Base)
Calculate fleet vehicle miles per day:
Revenue miles | X | Deadhead | = fleet miles | operating days | = fleet miles |
per year factor per year per year per day |
457,933
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 77
Merrimack Valley RTA Replace 16 (2015) Vans with 16 (2021) Vans (Cont.) Calculate emissions change in kilograms per summer day
Change
Change in Summer VOC | -0.005 | 1,000 | 1,432 | 1.0188 |
Change in Summer NOx | -0.033 | 1,000 | 1,432 | 1.0188 |
Change in Winter CO | -1.421 | 1,000 | 1,432 | 0.9812 |
Change in Summer CO2 | -65.331 | 1,000 | 1,432 | 1.0000 |
Calculate emissions change in kilograms per year
Pollutant
Summer VOC Summer NOx Winter CO Summer CO2
Calculate cost effectiveness (cost per kg of emissions reduced)
Pollutant
Summer VOC Summer NOx Winter CO
Summer CO2
Template prepared by the Office of Transportation Plannning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 78
Merrimack Valley RTA Replace 2 (2009) Buses with 2 (2022) Buses
CMAQ Bus Replacement Air Quality Analysis Worksheet
FILL IN SHADED BOXES ONLY
TIP YEAR: 2021 Bus Replacements
MPO: Merrimack Valley RTA: Merrimack Valley
FTA Sect 5307 Project # TBD Replace 2 (2009) Buses with 2 (2022) Buses
Emission Rates in grams/mile at assumed operating speed bin of : 18 MPH (Bin 5 (17.5-22.5))
Scenario Comparison
Summer
VOC Summer NOx Winter CO
Summer
CO2
Existing Model* = New Bus Purchase** =
Model Year
(grams/mile) (grams/mile) (grams/mile) (grams/mile)
* Please contact OTP for assistance on Existing Model emission factors
** MOVES 2014a Commercial Emission Factors - Please Specify the Following:
AM or PM: PM
Restricted or
Unrestricted
Unrestricted
Change (Buy-Base)
Calculate fleet vehicle miles per day:
Revenue miles | X | Deadhead | = fleet miles | / operating days | = fleet miles |
per year factor per year per year per day |
70,698
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 79
FTA Sect 5307 Project # TBD Replace 2 (2009) Buses with 2 (2022) Buses
Calculate emissions change in kilograms per summer day
Change
Change in Summer VOC | -0.067 | 1,000 | 231 | 1.0188 |
Change in Summer NOx | -2.986 | 1,000 | 231 | 1.0188 |
Change in Winter CO | -0.384 | 1,000 | 231 | 0.9812 |
Change in Summer CO2 | -69.850 | 1,000 | 231 | 1.0000 |
Calculate emissions change in kilograms per year
Pollutant
Summer VOC Summer NOx Winter CO Summer CO2
Calculate cost effectiveness (cost per kg of emissions reduced)
Pollutant
Summer VOC Summer NOx Winter CO
Summer CO2
Template prepared by the Office of Transportation Plannning Updated March 2016
Draft FFYs 2021 to 2025 MVMPO TIP Appendix April 2020 Appendix 80
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 81
Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary | |||||||
Mass DOT/ Project ID | MassDOT Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 lm- pact (kglyr) | GHG Impact Description | Additional Description | FiscalYear of Contract Award (2015 and forward) |
606503 | NEWBURYPORT CLIPPER CITY RAIL TRAIL ALONG THE CITY BRANCH (PHASE II) | $4,061)158 | Quantified | 34,996 | Quantified Decrease in Emissions from Bicycle and Pedestrian Infra- structure | Advertised 9/19/2015 Notice to Pro- ceed 4/1/2016 | 2016 |
606161 | HAVERHILL- IMPROVEMENTS ON MAIN STREET (ROUTE 125) | $3,635,519 | Quantified | 16,491 | Quantified Decrease in Emissions from Traffic Operational Improve- ment | Advertised 9/17/2016 Notice to Pro- ceed 4/12/2017 | 2017 |
607573 | HAVERHILL- RECONSTRUCTION ON ROUTE 97 (BROADWAY), FROM SILVER BIRCH LANE TO RESEARCH DRIVE | $6,526,912 | Quantified | 41,800 | Quantified Decrease in Emissions from Traffic Operational Improve- ment | Advertised 5/13/2017 Notice to Pro- ceed 2/9/2018 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 82
Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary (Cont.) | |||||||
Mass DOT/ Project ID | MassDOT Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 lm- pact (kglyr) | GHG Impact Description | Additional Description | Fiscal Year of Contract Award (2015 and forward) |
604585 | FLEX TO FTA FOR MVRTA NEW BUS UPGRADE TO CLEANER FUEL BUSES | $645,840 | Quantified | 26,343 | Quantified Decrease in Emissions from Bus Replacement | Flexed to FTA | 2017 |
605020 | SALISBURY- MULTl- USE TRAIL EXTENSION (BORDERS TO BOSTON TRAIL), INCLUDES NEW BRIDGE S-02-004 AND BOARDWALK (S-02- 012) (BYX) | $5,918,500 | Quantified | 18,631 | Quantified Decrease in Emissions from Bicycle and Pedestrian Infra- structure | Advertised 8/25/2018 Contract Awarded 12/12/18 Notice to Pro- ceed 1/18/19 | 2018 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 83
Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary (Cont.) | |||||||
Mass DOT/ Project ID | MassDOT Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kglyr) | GHG Impact Description | Addi tional Description | FiscalYear of Contract Award (2015 and forward) |
602418 | AMESBURY- RECONSTRUCTION OF ELM STREET | $7,223,053 | Quantified | 1,336 | Quantified Decrease in Emissions from Complete Streets Project | Advertised 7/13/19. Ac'd 2019 and 2020. Total Project Cost = $11,178,124 | |
607737 | AMESBURY- SALISBURY- TRAIL CONNECTOR @ 1-95 | $2,574,805 | Quantified | 3,972 | Quantified Decrease in Emissions from Bicycle and Pedes- trian Infrastructure | Advertised 9/15/2018 Notice to Pro- ceed 4/18/19 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 84
Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary (Cont.) | |||||||
Mass DOT/ Project ID | MassDOT Project Description | Total Pro- grammed Funds | GHG Analysis Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Additional Description | Fiscal Year of Contract Award (2015 and forward) |
606159 | NORTH ANDOVER- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 125 & MASSACHUSETTS AVENUE | $5,446,662 | Quantified | 482,727 | Quantified Decrease in Emissions from Traffic Operational Improvement | Advertised 1/12/2019 Notice to Pro- ceed 8/14/19 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 85
Merrimack Valley Region MPO TIP Completed Transit Projects GHG Tracking Summary | ||||||||
FTA Activity Line Item | Transit Agency | Project Description | Total Cost | GHG Analysi s Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Additional Descrip- tion | Fiscal Year Pro- grammed (2015 and forward) |
MYRTA | Purchase - Re- placement Vans 11 Model Year 2009 Delivery 2015 | $627,000 | Quantified | 41,814 | Quantified Decrease in Emissions from Bus Replacement | 2015 | ||
111202 | MYRTA | Replace 10 of 17 Model Year 2004 Transit Buses with new buses (Delivery 2016) | $4,200,000 | Quantified | 12,557 | Quantified Decrease in Emissions from Bus Replacement | 2015 | |
111215 | MYRTA | Replace 5 Model Year 2011 Para- transit Vehicles (De- livery 2016) | $320,000 | Quantified | 15,992 | Quantified Decrease in Emissions from Bus Replacement | 2016 |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 86
Merrimack Valley Region MPO TIP Completed Transit Projects GHG Tracking Summary (Cont.) | ||||||||
FTA Activity Line Item | Transit Agency | Project Description | Total Cost | GHG Analysi s Type | GHG C02 Impact (kg/yr) | GHG Impact Description | Additional Descrip- tion | Fiscal Year Pro- grammed (2015 and forward) |
111202 | MYRTA | Replace 7 MY 2004 Transit Buses with new buses | $2,989,000 | Quantified | 18,271 | Quantified Decrease in Emissions from Bus Replacement | 2017 | |
111202 | MYRTA | Replace 6 Model Year 2004 Buses (Delivery 2018) | $2,689,500 | Quantified | 15,661 | Quantified Decrease in Emissions from Bus Replacement | 2018 | |
RTDOO 07687 | MYRTA | Replace 3 Model Yr 2007 buses delivery 2020 | $1,377,150 | Quantified | 8,166 | Quantified Decrease in Emissions from Bus Replacement | 2020 |
Final FFYs 2021-2025 MYMPO TIP Appendix May 2020 Appendix 87
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 88
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 89
MVMPO List of Commonly Used Acronyms | ||
A | AADT | Average Annual Daily Traffic |
AASHTO | American Association of State Highway Transpor- tation Officials | |
ABP | MassDOT Accelerated Bridge Program | |
AC | Advance Construction | |
ADA | Americans with Disabilities Act (1990) | |
ADT | Average Daily Traffic | |
AQ | Air Quality | |
B | B to B | Border to Boston Rail Trail |
c | 3C | Continuing, Comprehensive and Coordinated (Transportation Planning) |
CAAA | Clean Air Act Amendments of 1990 | |
CFR | Code of Federal Regulations | |
CIP | Capital Investment Plan | |
CLF | Conservation Law Foundation | |
CMAQ | Congestion Mitigation and Air Quality Improve- ment Program | |
CMP | Congestion Management Process | |
CMR | Code of Massachusetts Regulations | |
CNG | Compressed Natural Gas | |
co | Carbon Monoxide | |
C02 | Carbon Dioxide |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 90
MVMPO List of Commonly Used Acronyms (Cont.) | ||
D | DEP | Department of Environmental Protection |
DOT | Department of Transportation | |
DPW | Department of Public Works | |
E | EB | Eastbound |
EIR | Environmental Impact Report | |
EIS | Environmental Impact Statement | |
EJ | Environmental Justice | |
ENF | Environmental Notification Form | |
E.O. | Executive Order (of the Governor of the Common- wealth) | |
EPA | U.S. Environmental Protection Agency | |
F | FA | Federal-Aid |
FAPRO | Federal Aid Program Reimbursement Office | |
FAST Act | Fixing America's Surface Transportation Act legis- lation signed into law December 4, 2015 | |
FHWA | Federal Highway Administration | |
FTA | Federal Transit Administration | |
FY | (State) Fiscal Year | |
FFY | Federal Fiscal Year | |
G | GANs | Grant Anticipation Notes |
GHG | Greenhouse Gas | |
H | HPP | USDOT High Priority Project |
HSIP | Highway Safety Improvement Program |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 91
MVMPO List of Commonly Used Acronyms (Cont.) | ||
I | IM | Interstate Maintenance |
ITS | Intelligent Transportation System | |
ISTEA | lntermodal Surface Transportation Efficiency Act of 1991 | |
L | LEP | Limited English Proficiency |
LOS | Level of Service | |
LTA | Local Technical Assistance | |
M | MAP-21 | Moving Ahead for Progress in the 21st Century legis- lation signed into law July 6, 2012 |
MassDOT | Massachusetts Department of Transportation | |
MCAD | Massachusetts Commission Against Discrimination | |
MEPA | Massachusetts Environmental Policy Act | |
M.G.L. | Massachusetts General Laws | |
MOA | Memorandum of Agreement | |
MOD | Massachusetts Office on Disabilities | |
MOU | Memorandum of Understanding | |
MPO | Metropolitan Planning Organization | |
MVMPO | Merrimack Valley Metropolitan Planning Organiza- tion | |
MVPC | Merrimack Valley Planning Commission | |
MVPGS | Merrimack Valley Priority Growth Strategy | |
MVRTA | Merrimack Valley Regional Transit Authority |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 92
MVMPO List of Commonly Used Acronyms (Cont.) | ||
N | NAAQS | National Ambient Air Quality Standards |
NARC | National Association of Regional Councils | |
NB | Northbound | |
NEPA | National Environmental Policy Act | |
NFA | Non-Federal Aid | |
NHS | National Highway System | |
NMCOG | Northern Middlesex Council of Governments | |
NOx | Nitrogen Oxide | |
NPRM | Notice of Proposed Rulemaking (Federal Register) | |
O&M | Operations and Maintenance | |
OTP | MassDOT Office of Transportation Planning | |
p | PCI | Pavement Condition Index |
PDA | Priority Development Area | |
PL | (Metropolitan) Planning Funds | |
PMS | Pavement Management System | |
p pp | Public Participation Plan | |
PRC | (MassDOT) Project Review Committee | |
PSAC | Project Selection Advisory Council | |
PS&E | The Plans, Specifications and Estimate to be used by contractors to bid on construction proposals |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 93
MVMPO List of Commonly Used Acronyms (Cont.) | ||
R | RGGI | Regional Greenhouse Gas Initiative |
ROW | Right-of-Way | |
RPA | Regional Planning Agency | |
RPMS | Regional Pavement Management System | |
RTA | Regional Transit Authority | |
RTP | Regional Transportation Plan | |
s | SAFETEA-LU | Safe, Accountable, Flexible, Efficient Transporta- tion Equity Act: A Legacy for Users |
SB | Southbound | |
so | Structurally Deficient | |
SGR | State of Good Repair | |
SIP | State (Air Quality) Implementation Plan | |
sov | Single Occupancy Vehicle | |
SPR | Statewide Planning and Research Funds | |
STBG | Surface Transportation Block Grant Program | |
STIP | Statewide Transportation Improvement Program | |
STP | Surface Transportation Program | |
T | TA | Transportation Alternatives |
TAM | Transit Asset Management | |
TAP | Transportation Alternatives Program | |
TCSP | Transportation and Community System Preserva- tion Grant Program | |
TOM | Transportation Demand Management |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 94
MVMPO List of Commonly Used Acronyms (Cont.) | ||
T (Con.) | TEA-21 | Transportation Equity Act for the 21st Century |
TEC | Transportation Project Evaluation Criteria | |
TERM score | Transit Economic Requirements Model score used to rate transit facility conditions | |
TIP | Transportation Improvement Program | |
TMA | Transportation Management Area | |
TMC | Turning Movement Count | |
TOO | Transit-Oriented Development | |
TRB | Transportation Research Board | |
u | ULB | Useful Life Benchmark |
UPWP | Unified Planning Work Program | |
USDOT | U.S. Department of Transportation | |
v | V IC | Volume/Capacity Ratio |
VMT | Vehicle Miles Traveled | |
voc | Volatile Organic Compound | |
w | WB | Westbound |
Massachusetts Executive Orders | ||
EO | 526 | Nondiscrimination, Diversity, Equal Employment Opportunity and Affirmative Action |
EO | 12898 | Environmental Justice in Minority and Low-Income Populations, February 1994 |
EO | 13166 | Improving Access to Programs (and Services) for persons with limited English Proficiency |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 95
Page intentionally left blank.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 96
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 97
Map Number | Project Number | City/Town | Project Description |
606522 | Andover | Andover- Bridge Rehabilitation, A-09-036, I-495 over St 28 (SB), A-09-037, I-495 over B&M and MBTA, A-09-041, I-495 over St 28 (NB) | |
607541 | Georgetown- Boxford | Georgetown – Boxford Border to Boston Trail from Georgetown Road to West Main Street (Route 97) | |
607542 | Georgetown- Newbury | Georgetown– Newbury Border to Boston Trail (Northern Georgetown to Byfield Section) | |
608298 | Groveland | Groveland- Groveland Community Trail, from Main Street to King Street | |
RTD - 9131 | MVRTA | SGR Riverbank Stabilization Construction | |
605306 | Haverhill | Haverhill – Bridge Replacement, H-12- 039, I-495 (NB & SB) over Merrimack River | |
609466 | Haverhill | Haverhill – Bridge Replacement, H-12-040, I-495 (NB & SB) over Merrimack River | |
605304 | Haverhill | Haverhill- Bridge Replacement, H-12-007 & H-12-025, Bridge Street (SR 125) over Merrimack River and the Abandoned B&M RR (Proposed Bikeway) |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 98
Map Number | Project Number | City/Town | Project Description |
608761 | Haverhill | Haverhill – Intersection Reconstruction on Route 108 (Newton Road) at Route 110 (Kenoza Avenue and Amesbury Road) | |
608930 | Lawrence | Lawrence - Lawrence Manchester Rail Corridor (LMRC) Rail Trail | |
609251 | Lawrence | Lawrence – Intersection Improvements at South Broadway (Route 28) and Mount Vernon Street | |
609509 | Lawrence | Lawrence – Intersection Imporvements at Merrimack Street and South Broadway (Route 28) | |
610658 | Methuen | Methuen – Intersection Improvements at Riverside Drive and Burnham Road | |
608494 | Newbury / Newburyport / Salisbury | Resurfacing of Route 1 | |
610663 | Newburyport | Newburyport – Riverfront Clipper City Rail Trail Construction |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 99
Map Number | Project Number | City/Town | Project Description |
608095 | North Andover | North Andover- Corridor Improvements on Route 114, between Route 125 (Andover Street) & Stop & Shop driveway | |
609392 | Rowley | Rowley – Safety Improvements at Route 1, Central and Glen Streets | |
602202 | Salisbury | Salisbury – Reconstruction of Route 1 (Lafayette Road) |
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 100
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 101
The MVRTA sent the new Transit Asset Management (TAM) targets that were adopted by the MVRTA Advisory Board on May 7, 2020.
Change: The Transit Asset Management (TAM) Plan Performance Management Targets section, draft pages 34 to 36, final pages 38 to 40, has been updated to include the recently adopted targets from the MVRTA March 6, 2020 TAM Plan.
City of Haverhill Comments:
The City of Haverhill commented that the City Council voted May 12 to authorize funding for the design of the North Avenue project. The project is moving forward.
The City of Haverhill is pleased that the Groveland Trail project is slated for FFY
2021. The City of Haverhill eventually wants to connect their trails to the
Groveland Trail.
MassDOT Comments:
Please consider making the Title VI/Translation information viewable near the beginning of the document as well (currently on page 127 of document).
Change made.
Please make sure appendices remain available on MVPC website with TIP once endorsed (currently separate document(s)).
Will make change.
Additional Comment field is missing from TIP Draft (present in ESTIP).
Additional Comment field has been added.
MassDOT and D4 will have feedback about Haverhill North Ave project at/before
May MPO meeting.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 102
FHWA Comments
Merrimack Valley MPO FFY 2021-2025 TIP Review
FHWA Comments
Page | Comment | |
11 | Regarding Safety Performance Measures: • Update Rate of Fatalities/Serious Injuries to full measure language: 0 Fatality rate per 100 million vehicle-miles traveled 0 Serious injury rate per 100 million vehicle-miles traveled | |
12 | Regarding the Transportation Asset Management Plan (TAMP): • Update that the TAMP was finalized in September 2019 | |
21 | • | Regarding the TAMP: Update that the TAMP was finalized in September 2019. Posted here: httQs://www.mass.gov/service-details/massdot-asset- |
21 | • | |
25 | Regarding Safety Performance Measures: • Update Rate of Fatalities/Serious Injuries to full measure language in table: 0 Fatality rate per 100 million vehicle-miles traveled 0 Serious injury rate per 100 million vehicle-miles traveled | |
35 | • | Regarding the Transit Safety: Either in this section or Safety above, MPO should add language about the Public Transportation Agency Safety Plan (PTASP) Final Rule. Originally with a deadline of July 2020, RTAs now have until December 2020 to develop the plan. More information here: httQs:1/www.transit.dot.gov/abouUnews/us-deQartment- |
35 | • | transQortation-Qrovides-greater-flexibilit:t-transit-agencies-meet- |
35 | • | |
76 | Regarding Financial Plan/Programming -more a question for discussion than a comment to address • In an effort to align with the MTP (Table 5.1), the total funding available would be roughly $214 million for FY21-25. Could be misreading this, but can you explain how you arrived at $306 million here? Related to project readiness, AC/state funding changes? |
The changes to address the FHWA comments have been made.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 103
Coastal Trails Coalition Comments
Two members of the Coastal Trails Coalition expressed concern over the programming of the Georgetown to Newbury section of the Border to Boston Trail (Project #607542) in FFY 2024 rather than in FFY 2023 as was the case in last year’s TIP and questioned what was causing this delay.
Town of North Andover
North Andover Town Manager Melissa Murphy-Rodrigues, Esq. submitted a letter of support (see following page) for the Route 114 Reconstruction Project (#608095) to be programmed in the FFY 2023 element of the FFYs 2021-2025
TIP.
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 104
Melissa Murphy-Rodrigues, Esq. Telephone (978)688-9510
Town Manager Fax (978)688-9556
May 26, 2020
RE: Corridor Improvements on Route 114, Between Rt 125 (Andover St) & Stop & Shop
Driveway (# 608095)
Dear Members of the Merrimack Valley Metropolitan Planning Organization (MPO),
I am writing to express my firm support, on behalf of the Town of North Andover, for any scenario in which the Transportation Improvement Project (TIP) described as “Corridor Improvements on Route 114, Between Rt 125 (Andover St) & Stop & Shop Driveway (# 608095)” begins funding in Federal Fiscal Year 2023.
Once completed, this project, critical to addressing improvements to the busiest stretch of roadway in
North Andover, will help to meet four (4) Federal Performance Targets:
1. Number of non-motorized fatalities and non-motorized serious injury.
2. Percentage of Pavements of the non-Interstate NHS in Good condition.
3. Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reliable.
4. Number and Rate of Serious Injuries
Over the last few years, the Town has been partnering with MassDOT and its consultant on this project to engage public participation, incorporate safety enhancements and improve the corridor. Per the attached schedule, the project has already advanced significantly. Project designers will be prepared to submit 25% design drawings to MassDOT by the end of June 2020. If funding for this project begins in FFY23 as is currently planned, advertisement can begin in January of 2023, with a projected date of completion of the entire project by May of 2026.
Given where the project area is located, improvements will benefit not only the Town of North Andover, but also the Town of Andover and City of Lawrence, in terms of being able to facilitate a smoother and safer route of travel to/from those areas.
Not only is this project critical to neighboring municipalities, but it also represents a critical priority for major private property owners along Rt. 114. Merrimack College, one of the fastest-growing educational institutions in the country serves a total student population over 4,200 and has over the past few years completed major facilities upgrades and expansions to its campus. In the near term, it plans to renovate its Collegiate Church of Christ the Teacher facility into a 28,600 square foot full-service student activities center. The completion of improvements to Rt. 114 as currently proposed in the TIP will serve to ensure safer accommodations for students, staff, and others who visit Merrimack College’s campus.
Across from Merrimack College sits Royal Crest Estates; the owner of which is currently in negotiations with Boston-based developer Trinity Financial to redevelop the property into a mixed-use development
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 105
Melissa Murphy-Rodrigues, Esq. Telephone (978)688-9510
Town Manager Fax (978)688-9556
consisting of multi-family housing (apartments and townhomes), commercial office, retail, a hotel, and dormitories that will primarily serve Merrimack College students. Many details of this major private redevelopment project are in flux, but it will be transformational to the immediate region in being able to provide improved housing and jobs, through an influx of private investment. Trinity Financial and Merrimack College have both been intimately involved in the design process and are relying on the completion of this project by mid-2026.
Again, I strongly urge the MPO to vote in favor of a scenario that will keep funding for the Rt. 114 improvements in North Andover in FFY23, which will allow project completion by mid-2026. I do not endorse any decision that would delay the start of funding for this project to a later Federal Fiscal Year. Thank you for your consideration.
Sincerely,
Melissa Murphy-Rodrigues, Esq. Town Manager
Attachment: Project Schedule
Final FFYs 2021-2025 MVMPO TIP Appendix May 2020 Appendix 106