Merrimack Valley Metropolitan Planning

Organization

Federal Fiscal Years 2023 to 2027

Transportation Improvement Program

Draft Report

April 2022

Prepared by the Merrimack Valley Planning Commission

This document was prepared in cooperation with the Massachusetts Department of Transportation and the U.S. Department of Transportation. (under Contract # 114679 with MassDOT) The views and opinions of the Merrimack Valley Planning Commission expressed herein do not necessarily state or reflect those of the Massachusetts Department of
Transportation or the U.S. Department of Transportation.
Draft FFYs 2023-2027 MVMPO TIP April 2022
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP April 2022

Table of Contents

Title VI Notice to Beneficiaries .............................................................................................. 1
Endorsement Page for Federal TIP - Signatures .................................................................. 5
Certification of the Merrimack Valley MPO Transportation Planning Process ...................... 7
310 CMR 60.05: Global Warming Solutions Act – Signatures .............................................. 9
Part A. Introduction....................................................................................................... 11
Part A. 1. TIP Development Process .................................................................................. 11
Part A. 2. Performance Measures ...................................................................................... 15
Part A. 3. Prioritization ........................................................................................................ 52
Part A. 4. Public Participation ............................................................................................ 66
Public Participation Plan (PPP) Stakeholders 67
Part A. 5. Amendment/ Adjustment Procedures ................................................................ 69
Part A. 6. High Priority Projects ......................................................................................... 71
Part A. 7. Advance Construction......................................................................................... 73
Part A. 8. Transportation Funding Programs ...................................................................... 74
Highway Projects.............................................................................................. 74
Transit Projects ................................................................................................ 77
Organization of Project Listings – Highway Projects ........................................ 79
Part B. Project Listings ...................................................................................................... 83
Highway Projects.............................................................................................. 83
Transit Projects ................................................................................................ 91
Summary of Highway Project Listings by Town................................................ 97
Part C. Federal Requirements .........................................................................................103
Part C.1. Highway Program Financial Plan.......................................................................104
Highway Program Financial Plan Table .........................................................112
Summary of Highway Funding Categories .....................................................114
Part C. 2. Transit Program Financial Plan ........................................................................123
Transit Program Financial Plan Table ............................................................124
Summary of Transit Funding Categories ........................................................129
MVRTA Transit Operations and Maintenance Summary Table ......................130
Part C. 3. Status on Implementation of FFY 2022 TIP Projects ........................................133
FFY 2022 Highway Project List ......................................................................133
Part C. 4. Air Quality Conformity.......................................................................................136
Part C. 5. Special Efforts - ADA ........................................................................................142
Part C. 6. Environmental Justice ......................................................................................142
Part C. 7. Equity Analysis .................................................................................................143
Appendix...........................................................................................................................171
Draft FFYs 2023-2027 MVMPO TIP April 2022
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP April 2022

Title VI Notice to Beneficiaries

The Merrimack Valley Planning Commission (MVPC) operates its programs, services and activities in compliance with federal nondiscrimination laws including Title VI of the Civil Rights Act of 1964 (Title VI), the Civil Rights Restoration Act of 1987, and related statutes and regulations. Title VI prohibits discrimination in federally assisted programs and requires that no person in the United States of America shall, on the grounds of race, color or national origin (including limited English proficiency) be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity receiving federal assistance. Related federal nondiscrimination laws administrated by the Federal Highway Administration, the Federal Transit Administration, or both, prohibit discrimination on the basis of age, sex and disability. These protected categories are contemplated within MVPC’s Title VI Program consistent with federal interpretation and administration. Additionally, MVPC provides meaningful access to its programs, services, and activities to individuals with limited English proficiency, in compliance with U.S. Department of Transportation policy and guidance on federal Executive Order 13166.
MVPC also complies with the Massachusetts Public Accommodation Law, M.G.L. Chapter
272, Sections 92a, 98, and 98a prohibiting making any distinction, discrimination, or restriction in admission to or treatment in a place of public accommodation based upon race, color, religious creed, national origin, sex, sexual orientation, disability, or ancestry. Likewise, MVPC complies with the Governor’s Executive Order 526, Section 4 requiring that all of its programs, activities, and services provided, performed, licensed, chartered, funded, regulated, or contracted for shall be conducted without unlawful discrimination based upon race, color, age, gender, ethnicity, sexual orientation, gender identity or expression, religion, creed, ancestry, national origin, disability,

veteran’s status (including Vietnam-era veterans), or background.

Draft FFYs 2023-2027 MVMPO TIP April 2022 1

Additional Information

To request additional information regarding Title VI and related federal and state nondiscrimination obligations, please contact:
Title VI Program Coordinator
Merrimack Valley Metropolitan Planning Organization c/o Merrimack Valley Planning Commission
160 Main Street
Haverhill, MA 01830-5061 (978) 374-0519, extension 15 [email protected]

Complaint Filing

To file a complaint alleging a violation of Title VI or related federal nondiscrimination law, contact the Title VI Program Coordinator (above) within one hundred and eighty (180) days of the alleged discriminatory conduct.
To file a complaint alleging a violation of the Commonwealth’s Public Accommodation Law,
contact the Massachusetts Commission Against Discrimination within three hundred (300)
days of the alleged discriminatory conduct at:
Massachusetts Commission Against Discrimination (MCAD) One Ashburton Place, 6th Floor
Boston, MA 02109 (617) 994-6000
TTY: (617) 994-6196

Translation

English

If this information is needed in another language, please contact the MVMPO Title
VI/Nondiscrimination Coordinator at 978-374-0519 ext. 15.

Spanish

Si necesita esta información en otro idioma, por favor contacte al coordinador de MVMPO
del Título VI/Contra la Discriminación al 978-374-0519 ext. 15.

Portuguese

Caso estas informações sejam necessárias em outro idioma, por favor, contate o
Coordenador de Título VI e de Não Discriminação da MVMPO pelo telefone 978-374-
0519, Ramal 15.
Draft FFYs 2023-2027 MVMPO TIP April 2022 2

Chinese Simple

如果需要使用其它语言了解信息请联系Merrimack Valley大都会规划组织MVMPO)《 民权法案》第六章协调员电话978-374-0519转15

Chinese Traditional

如果需要使用其他語言瞭解資訊,請聯繫Merrimack Valley大都會規劃組織(MVMPO)《 民權法案》第六章協調員,電話978-374-0519,轉15。

Vietnamese

Nếu quý vị cần thông tin này bằng tiếng khác, vui lòng liên hệ Điều phối viên Luật VI/Chống phân biệt đối xử của MVMPO theo số điện thoại 978-374-0519, số máy nhánh 15.

French Creole

Si yon moun vle genyen enfòmasyon sa yo nan yon lòt lang, tanpri kontakte Kowòdinatè kont Diskriminasyon/MVMPO Title VI la nan nimewo 978-374-0519, ekstansyon 15.

Russian

Если Вам необходима данная информация на любом другом языке, пожалуйста, свяжитесь с Координатором Титула VI/Защита от дескриминации в MVMPO по тел: 978-374-0519, добавочный 15.

French

Si vous avez besoin d'obtenir une copie de la présente dans une autre langue, veuillez contacter le coordinateur du Titre VI/anti-discrimination de MVMPO en composant le 978-
374-0519, poste 15.

Italian

Se ha bisogno di ricevere queste informazioni in un’altra lingua si prega di contattare il
coordinatore del MVMPO del Titolo VI e dell'ufficio contro la discriminazione al 978-374-
0519 interno 15.

Mon-Khmer, Cambodian

ប្រសិនបរើបោក-អ្ន កប្រូវការរកប្ប្រព័រ៌មានបនេះ
សូ មទាក់ទងអ្ន កសប្មរសប្មួលជំពូ កទី6/គ្មា នការប រសើ
978-374-0519 រចភ្ជា រ់បៅបលខ 15។
បអ្ើងររស់ MVMPO តាមរយៈបលខទូរស័ពទ

Arabic

طيطختلا ةمظنمل عباتلا زييمتلا عنمل ةسداسلا ةرقفلا قسنمب لاصتلاا ىجرُي ،ىرخأ ةغلب تامولعملا هذه ىلإ ةجاحب تنك اذإ

.15 ماقرلأا طغضا مثو 978-374-0519 :فتاهلا ىلع يلاف كاميريم يف يرضحلا

Draft FFYs 2023-2027 MVMPO TIP April 2022 3
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP April 2022 4

Endorsement Page for Federal TIP - Signatures

Merrimack Valley Metropolitan Planning Organization Endorsement of the

FFYs 2023-2027 Transportation Improvement Program

Whereas, the Merrimack Valley MPO has completed its review in accordance with Section
176(c) (4) of the Clean Air Act as amended in 1990 [42 U.S.C. 7251 (a)], and hereby certifies that the FFYs 2023-2027 TIP is financially constrained and that the
implementation of the Merrimack Valley Metropolitan Planning Organization 2020 Regional
Transportation Plan satisfies the conformity criteria specified in both 40 CFR Part 51 and
93 (8/15/1997) and 310 CMR 60.03 (12/30/1994).
Therefore, in accordance with 23 CFR Part 450 Section 322 (Development and content of the Metropolitan Transportation Plan) of the March 16, 2007 Final Rules for Statewide and Metropolitan Planning, the MPO hereby endorses the FFYs 2023-2027 Transportation Improvement Program.

Signatory Certification: Date: May 25, 2022


Jamey Tesler
Secretary/ CEO MassDOT
Draft FFYs 2023-2027 MVMPO TIP April 2022 5
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP April 2022 6

Certification of the Merrimack Valley MPO Transportation Planning Pro- cess

The Merrimack Valley Region Metropolitan Planning Organization certifies that its conduct of the metropolitan transportation planning process complies with all applicable require- ments, which are listed below, and that this process includes activities to support the de- velopment and implementation of the Regional Long-Range Transportation Plan and Air Quality Conformity Determination, the Transportation Improvement Program and Air Qual- ity Conformity Determination, and the Unified Planning Work Program.
1. 1. 23 USC 134, 49 USC 5303, and this subpart.
1. 2. Sections 174 and 176 (c) and (d) of the Clean Air Act, as amended (42 USC 7504,
7506 (c) and (d) and 40 CFR part 93 and for applicable State Implementation Plan projects.
1. 3. Title VI of the Civil Rights Act of 1964, as amended (42 USC 2000d-1) and 49
CFR Part 21.
1. 4. 49 USC 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity.
1. 5. Section 1101 (b) of the Fast Act (Pub. L. 114-357) and 49 CFR Part 26 regarding the involvement of disadvantaged business enterprises in U.S. DOT-funded projects.
2. 6. 23 CFR part 230, regarding implementation of an equal employment opportunity program on Federal and Federal-aid highway construction contracts.
1. 7. The provisions of the US DOT and of the Americans with Disabilities Act of 1990 (42 USC 12101 et seq.) and 49 CFR Parts 27, 37, and 38.
1. 8. The Older Americans Act, as amended (42 USC 6101), prohibiting discrimination on the basis of age in programs or activities receiving federal financial assistance.
1. 9. Section 324 of Title 23 USC regarding the prohibition of discrimination based on gender.
10. Section 504 of the Rehabilitation Act of 1973 (29 USC 794) and 49 CFR Part 27 re- garding discrimination against individuals with disabilities.
11. Anti-lobbying restrictions found in 49 USC Part 20. No appropriated funds may be expended by a recipient to influence or attempt to influence an officer or employee of any agency, or a member of Congress, in connection with the awarding of any federal contract.
May 25, 2022

Jamey L. Tesler, Secretary and Chief Executive Officer
Massachusetts Department of Transportation
Chair, Merrimack Valley MPO
Draft FFYs 2023-2027 MVMPO TIP April 2022 7
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP April 2022 8

310 CMR 60.05: Global Warming Solutions Act – Signatures

310 CMR 60.05: Global Warming Solutions Act Requirements for Transportation

This will certify that the Transportation Improvement Program and Air Quality Conformity Determination for the Merrimack Valley MPO Long Range Transportation Plan is in compli- ance with all applicable requirements in the State Regulation 310 CMR 60.05: Global Warm- ing Solutions Act Requirements for Transportation. The regulation requires the MPO to:
1. 310 CMR 60.05(5)(a)1.: Evaluate and report the aggregate transportation GHG
emissions impacts of RTPs and TIPs;
2. 310 CMR 60.05(5)(a)2.: In consultation with MassDOT, develop and utilize proce- dures to prioritize and select projects in RTPs and TIPs based on factors that in- clude aggregate transportation GHG emissions impacts;
3. 310 CMR 60.05(5)(a)3.: Quantify net transportation GHG emissions impacts result- ing from the projects in RTPs and TIPs and certify in a statement included with
RTPs and TIPs pursuant to 23 CFR Part 450 that the MPO has made efforts to min-
imize aggregate transportation GHG emissions impacts;
4. 310 CMR 60.05(5)(a)4.: Determine in consultation with the RPA that the appropriate planning assumptions used for transportation GHG emissions modeling are con- sistent with local land use policies, or that local authorities have made documented and credible commitments to establishing such consistency;
5. 310 CMR 60.05(8)(a)2.a.: Develop RTPs and TIPs;
6. 310 CMR 60.05(8)(a)2.b.: Ensure that RPAs are using appropriate planning as- sumptions;
7. 310 CMR 60.05(8)(a)2.c.: Perform regional aggregate transportation GHG emis- sions impact analysis of RTPs and TIPs;
8. 310 CMR 60.05(8)(a)2.d.: Calculate aggregate transportation GHG emissions im-
pacts for RTPs and TIPs;
9. 310 CMR 60.05(8)(a)2.e.: Develop public consultation procedures for aggregate transportation GHG emissions impact reporting and related GWSA requirements consistent with current and approved regional public participation plans;
10. 310 CMR 60.05(8)(c): Prior to making final endorsements on the RTPs, TIPs, STIPs, and projects included in these plans, MassDOT and the MPOs shall include the aggregate transportation GHG emission impact assessment in RTPs, TIPs, and STIPs and provide an opportunity for public review and comment on the RTPs, TIPs, and STIPs; and
11. 310 CMR 60.05(8)(a)1.c.: After a final GHG assessment has been made by MassDOT and the MPOs, MassDOT and the MPOs shall submit MPO-endorsed RTPs, TIPs, STIPs or projects within 30 days of endorsement to the Department for
review of the GHG assessment.

Jamey Tesler, Secretary and CEO
Massachusetts Department of Transportation (MassDOT);
Chair, Merrimack Valley Metropolitan Planning Organization (OCMPO)

May 25, 2022 Date

Draft FFYs 2023-2027 MVMPO TIP April 2022 9
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP April 2022 10

Merrimack Valley Metropolitan Planning Organization FFYs 2023-2027 Transportation Improvement Program Draft Report prepared April 2022

Part A. Introduction

Part A. 1. TIP Development Process

Federal transportation authorization legislation establishes funding categories for transportation projects that may be eligible for Federal funding and sets maximum funding levels per category for each year of the legislation. Projects in this TIP are planned to be primarily funded through the federal transportation act titled “Infrastructure Investment and Jobs Act (IIJA)” that was signed into law November 15, 2021, Public Law 117-58, also known as the “Bipartisan Infrastructure Law” (BIL). The IIJA funds $550 billion dollars for transportation, water infrastructure, resilience and broadband for Federal Fiscal Years (FFYs)
2022 through 2026.
The previous legislation “Moving Ahead for Progress in the 21st Century (MAP-21)” established planning factors known as the “MAP-21 eight planning factors” and the “FAST Act” added two new planning factors (I and J in the list that follows), continuing in the BIL stipulates that the metropolitan planning process...
“provide for consideration of projects and strategies that will-

A) support the economic vitality of the metropolitan planning area, especially by enabling global competitiveness, productivity and efficiency;

B) increase the safety of the transportation system for motorized and non-motorized users;

C) increase the security of the transportation system for motorized and non-motorized users;

D) increase the accessibility and mobility of people and for freight; E) protect and enhance the environment, promote energy
conservation, improve quality of life, and promote consistency between transportation improvements and State and local planned growth and economic development patterns;
F) enhance the integration and connectivity of the transportation system, across and between modes, for people and freight;
G) promote efficient system management and operation;
H) emphasize the preservation of the existing transportation system;
Draft FFYs 2023-2027 MVMPO TIP April 2022 11
I) improve the resiliency and reliability of the transportation system and reduce or mitigate stormwater impacts of surface transportation; and
J) enhance travel and tourism.”
It is the responsibility of the Federal mandated, State designated, regional Metropolitan Planning Organizations (MPOs) to carry out the Federal transportation planning process in their respective urbanized areas and prepare many Federal transportation documents, including the Transportation Improvement Program (TIP). This process, and the MPOs themselves, were established with the intention to include local and regional input into the Federal transportation planning process.
Based on Federal regulations any transportation project funded through the Federal Highway Administration (FHWA), or the Federal Transit Administration (FTA) must be listed in the appropriate region's Transportation Improvement Program (TIP). MassDOT combines the 13 regional MPO TIPs with statewide projects to produce the Statewide TIP (STIP) from which Federal-aid highway and transit projects are chosen. Without such a listing, Federal Highway funds cannot be expended by the Massachusetts Department of Transportation (MassDOT) on local or State projects. Similarly, the Merrimack Valley Regional Transit Authority (MVRTA) can only receive federal funds for projects listed in the TIP and STIP.

Merrimack Valley Metropolitan Planning Organization (MVMPO)

The MVMPO was first created by the Governor of Massachusetts in 1972. The MVMPO covers the same 15-community geographic area that defines the MVPC region and the MVRTA
service area. The current MVMPO membership is as follows:

Secretary of MassDOT –Jamey L. Tesler

MassDOT Highway Division Administrator –Jonathan L. Gulliver

Merrimack Valley Planning Commission (MVPC) Director –Jerrard Whitten

Administrator/CEO Merrimack Valley Regional Transit Authority –Noah Berger

Mayor of Haverhill –James Fiorentini

Mayor of Lawrence –Brian A. De Peña

Representing Region 1 (Amesbury, Newburyport, Salisbury) –Neil Harrington

Representing Region 2 (Newbury, Rowley, West Newbury) –Robert Snow

Representing Region 3 (Boxford, Georgetown, Groveland, Merrimac) –John Cashell

Representing Region 4 (Andover, Methuen, North Andover) –Paul Materazzo

Draft FFYs 2023-2027 MVMPO TIP April 2022 12
Ex officio, non-voting members of the MVMPO include:

Federal Highway Administration –Massachusetts Division –Jeff McEwen

Federal Transit Administration – Region I – Peter Butler

Rockingham Planning Commission MPO (NH), Chairman RPC – Richard McDermott

Boston MPO, President MAPC –Erin Wortman

Northern Middlesex MPO, Chairman NMCOG –Andrew Deslaurier

Nashua MPO (NH), Chairman NRPC –Timothy Tenhave

The TIP has been prepared in accordance with 23 CFR 450.326.
The development of the TIP starts with the Regional Transportation Plan (RTP). The MVMPO’s RTP is a twenty-year plan for transportation projects that can be programmed for implementation with Federal funds. The RTP is fiscally constrained and lists potential future projects in five-year blocks. Projects were chosen for the RTP based on MAP-21 transportation planning factors, meeting performance measure targets, existing roadway conditions,
problems identified through ongoing pavement, congestion, and safety analyses conducted by the MVMPO, local and state project priorities and fiscal factors. Each year, the MVMPO programs projects from the RTP that are ‘ready-to-go’ into its five-year Transportation Improvement Program (TIP). Only those projects that are specifically identified in the RTP, or are consistent with its recommendations, can be programmed in the TIP. The planning tasks conducted in developing the RTP and the TIP are included in the region’s Unified Planning Work Program (UPWP) which is produced for public review annually. The UPWP includes additional transportation planning activities such as intersection and roadway analyses and studies.
Projects from the RTP first two-time bands of years (i.e., 2020 to 2024 and 2025 to 2029) are programmed in the TIP. An inconsistency with spending shown in the RTP is that when the MVMPO’s FFY 2020 RTP was developed, it was assumed the construction of North Avenue in Haverhill would occur in the FFYs 2020 to 2024 time-band. The estimated project cost for this project and for the North Andover Route 114 project have increased significantly to the point where fully programming both of these projects in the 2023 to 2027 TIP is not financially feasi- ble. Neither project would be ready to advertise until 2024 or later. The Route 114 project has
a TEC score of 12.42, the Haverhill North Avenue project has a TEC score of 8.58. In addition, the North Andover Route 114 project is further along in the design process, therefore the North Andover Route 114 project is programmed to start in FFY 2024 and then consumes all the re- gional target funding in FFYs 2025 and 2026 and will also need some of the FFY 2027 funding before funding is available for Haverhill North Avenue. North Avenue is programmed to begin
in 2027, it is a three-year project, so it will be AC’d 2027 to 2029. Also, two sections of the Bor-
der-to-Boston Rail Trail were slated for 2020 to 2024, the Georgetown-Newbury Northern
Draft FFYs 2023-2027 MVMPO TIP April 2022 13
Georgetown to Byfield section is programmed for Statewide funding in 2026, the other section is programmed in 2024 as it was in the RTP. Additionally, the Lawrence Reconstruction of Amesbury Street is in the 2030 to 2034 band, but this project has received earmark/discretion- ary funding which is available for this TIP.
Projects that appear in the TIP were initiated and selected from a number of sources. Bridge projects have been selected and developed by MassDOT's Bridge section largely based upon the results of their ongoing bridge maintenance program. MassDOT has made it a priority to develop projects that would correct problems in “Structurally Deficient” (SD) bridges. The region’s Congestion Management Process is used to identify intersections and roadways where significant congestion exists and measures the levels of congestion at these locations. This information has been used by local communities to develop roadway projects that are programmed in the TIP. Similarly, locations identified as having safety problems in the region’s Safety Monitoring System or identified as a "crash cluster" by MassDOT, are used by the Department and local communities to develop TIP projects. Projects that help meet Performance Measures targets are programmed in the TIP.
Bicycle and pedestrian paths and accomodations on roadways and bridges are part of the Massachusetts 2019 Statewide Pedestrian Transportation Plan and 2019 Statewide Bicycle Transportation Plan which strive to consider pedestrians and bicyclists at “the same level of importance as drivers in planning, design and maintenance” including incorporating the safety of these users in projects. MassDOT’s Bicycle and Pedestrian Update 2021 illustrates some of the projects MassDOT has completed since releasing the Plans in 2019. These projects help meet the Plans’ goals “to increase the percentage of everyday trips made by biking and walking while eliminating fatalities and serious injuries”. These Plans also conduct analyses which locate areas with Potential for Everyday Biking, Gaps in the High Comfort Bikeway Network, Potential for Walkable Trips, Transit Route, and High Pedestrian and Bicycle Crash locations used to initiate projects as well as score projects for the Massachusetts Capital
Investment Plan (CIP). All TIP projects are part of the (CIP) which has a category of Expansion Projects which include projects that “expand bicycle and pedestrian networks to provide more transportation options and address health and sustainability objectives”. Many bicycle and pedestrian projects are initiated by a municipality because the State provides funding for these
projects in the Complete Streets, Shared Use Path, and the Safe Route to Schools Programs.
Draft FFYs 2023-2027 MVMPO TIP April 2022 14

Part A. 2. Performance Measures

Federal legislation requires states to develop a Transportation Asset Management Plan (TAMP) that includes Performance Measures for NHS roadways and bridges as part of the as- set management process. MassDOT Highway Division submitted an initial TAMP to FHWA on April 30, 2018, the TAMP was finalized in September of 2019.

Beginning with the Moving Ahead for Progress in the 21st Century Act (MAP-21), continuing in the Fixing America's Surface Transportation Act (FAST) and the Infrastructure Investment and Jobs Act (IIJA) also known as the Bipartisan Infrastructure Law (BIL), that was signed into law November 15, 2021, State DOTs and MPOs are required to establish performance measures, and targets for these measures, to be used in assessing the transportation system and pro- gramming projects for Federal funding categories provided in the Acts. The Final Rules estab- lishing these measures were released in three separate rule makings. PM1: "HSIP and Safety Performance Management Measures", PM2: "Pavement and Bridge Condition Performance Measures", and PM3: "System Performance/ Freight/ CMAQ Performance Measures". These Rules define the measures to be used in each of the categories.

The PM1 HSIP and Safety Performance Measures apply to all public roads. The PM2 Pave- ment and Bridge Performance Measures apply only to NHS (National Highway System) roads and bridges. PM3 Performance Measures apply to various facilities as defined below.

MassDOT has established targets based on these performance measures and the MPOs have worked with MassDOT in either a) choosing the same targets, b) adapting them to the specific region, or c) choosing new targets as goals for the MPO. The MVMPO has adopted all of the targets established by MassDOT. MassDOT and the MPOs will work cooperatively to ex- change data and performance targets and measures as required by the legislation.

MassDOT’s Tracker https://www.massdottracker.com/wp/ contains annual performance man- agement reports. These performance targets and corresponding actuals are contained in the reports.

The following are the performance measures, divided into three categories, as defined by the

Final Federal Rules:

HSIP and Safety Performance Management Measures to be applied to all public roads

(PM1):

Number of Fatalities

Fatality rate per 100 million vehicle-miles traveled

Number of Serious Injuries

Serious injury rate per 100 million vehicle-miles traveled

Number of non-motorized fatalities and non-motorized serious injuries

Draft FFYs 2023-2027 MVMPO TIP April 2022 15

Pavement and Bridge Condition Performance Measures (PM2):

Percentage of Pavements of the Interstate System in Good condition

Percentage of Pavements of the Interstate System in Poor condition

Percentage of Pavements of the non-Interstate NHS in Good condition

Percentage of Pavements of the non-Interstate NHS in Poor condition

Percentage of NHS bridges by deck area classified as in Good condition

Percentage of NHS bridges by deck area classified as in Poor condition

MassDOT has submitted a draft NHS Transportation Asset Management Plan (TAMP), as re- quired by MAP-21, to address pavement and bridge conditions on the NHS system. The TAMP was finalized in September 2019.

System Performance/ Freight/ CMAQ Performance Measures (PM3):

Percent of the Person-Miles Traveled on the Interstate that are Reliable

Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reliable

Truck Travel Time Reliability (TTTR) Index on the Interstate System

Annual Hours of Peak Hour Excessive Delay Per Capita

Percent of Non-SOV Travel on the NHS System

Total Emission Reduction of all projects funded with CMAQ in areas designated as non- attainment or maintenance for ozone (O3), carbon monoxide (CO), or particulate matter (PM10 and PM2.5)

MassDOT collects data for and establishes targets for each of the performance measures and presents these to the MPO. The MVMPO then votes on whether to adopt the MassDOT tar- gets, or establish their own. Projects are programmed for funding with consideration of meeting the targets established for each measure. The performance measures are incorporated into

the Transportation Improvement Program (TIP) Transportation Evaluation Criteria (TEC) in the scoring categories as indicated in the TEC Scoring Criteria Chart in Section A.3. of the TIP.

Targets are set by examining historic trends in the data and considering future plans for poten- tial improvements.

Draft FFYs 2023-2027 MVMPO TIP April 2022 16

Safety Performance Measures (PM1)

The Merrimack Valley MPO at its January 26, 2022 meeting chose to adopt the statewide safety performance measure targets set by MassDOT for Calendar Year (CY) 2022.

Total Fatalities: Per Federal Highway Administration (FHWA) guidance, the CY22 target setting process began with a trend line projection based on the most recent available data.

Due to reduced vehicle miles traveled (VMT) related to the pandemic, actual 2020 fatalities did not follow this trend, so CY21 projections were based on trends from CY19 with CY20 data disregarded given the unique circumstances surrounding data from that year. CY22 projections are based on a 2.5% reduction in fatalities from CY21 resulting in a five-year average fatalities projection of 340. It is projected that fatalities will decrease based on MassDOT efforts in the areas of speed management and safe systems, among other safety strategies. As always, MassDOT’s overarching goal is zero deaths and this goal will be pursued by implementing Strategic Highway Safety Plan (SHSP) strategies.
The Merrimack Valley Region number of fatalities averaged over the five years from 2016 to
2020 is 21, an increase of 3 over the previous 2015 to 2019 average which was 18. This large increase in the 5-year average can be attributed to the COVID-19 pandemic anomaly year when 28 fatalities occurred in the Merrimack Valley, CY 2016 had 20, CY 2017 had 19, CY
2018 had 18 and CY 2019 had 19. The open crash data for 2021 shows 19 fatalities in the re- gion.

Fatality Rate: The fatality rate represents five-year average fatalities divided by five-year average VMTs. The COVID-19 pandemic greatly impacted VMT, causing fatality rates to spike in 2020 with significantly lower VMT and slightly higher fatalities. The 2022 projection is now

0.56 fatalities per 100 million vehicle miles traveled for 2022 (five-year average of 2018-2022). The long-term goal is towards zero deaths, so the long-term fatality rate target is 0 fatalities per
100 million VMTs.
The Merrimack Valley Region fatality rate increased from 0.47 fatalities per 100 million Vehicle Miles Travelled (VMT) averaged over 2015 to 2019 to 0.58 averaged from 2016 to 2020, which is slightly above the Statewide rate of 0.57 fatalities per 100 million VMT from 2016 to 2020.

Total Serious Injuries: It is anticipated that there will be an overall decrease in the number of serious injuries due to a continual downward trend line as well as the implementation of countermeasures that are being developed as part of the 2018 SHSP. MassDOT projections in this category have used CY19 as a base to reflect changes in VMT due to the pandemic, and the CY22 target of 2,504 was set to reflect this trend. Due to unpredictable fluctuations

between 2019 and 2020 data and an overall decreasing trendline, a 3% reduction in annual serious injuries from 2018 to 2021, and a 4% annual reduction from 2021 to 2022, were
assumed to calculate the CY22 target.
Draft FFYs 2023-2027 MVMPO TIP April 2022 17
The Merrimack Valley Region Total Serious Injuries decreased slightly from 147 averaged from 2015 to 2019 to 146 serious injuries averaged from 2016 to 2020.

Serious Injuries Rate: Similar to the fatality rate, it is anticipated that the downward trend line will result in a drop in the rate of serious injuries from 4.28 per 100 million VMT between 2017–

2021 to 4.11 between 2018–2022. Five-year VMT data were used between 2018 – 2022 to calculate this rate.
The Merrimack Valley Serious Injury Rate per 100 million VMT increased from 3.9 averaged over 2015 to 2019 to 4.1 from 2016 to 2020, but remains lower than the State average of 4.28 from 2016 to 2020.

Total Number of Non-Motorized Fatalities and Serious Injuries: In 2020, during the

COVID-19 pandemic, Massachusetts experienced a steep decline in both non-motorized fatali- ties and serious injuries. Because of the high fluctuations in the data, to establish MassDOT’s CY22 target, CY21 non-motorist fatalities and suspected serious injuries were set to be equal
to the average of CY17, CY18 and CY19 data. To project the non-motorist fatality and serious injuries for CY22, a 2% reduction was estimated. Overall, this translated to a CY22 5-year av- erage of 471 fatalities and serious injuries combined for non-motorists.
It is important to note that the inclusion criteria have changed for non-motorists. This year, the non-motorist type “not reported” was removed because, based on manual inspection, it ap- pears that many of the persons in this category were not actually pedestrians or bicyclists but were bystanders (e.g. people who were in buildings when the building was struck by a vehi- cle). However, due to data quality and the ability, need and resources to manually review crashes, this field may continue to evolve.

Note: The fatality and serious injury data contained here was developed to align with the data included within MassDOT's annual Highway Safety Improvement Program (HSIP) report. As such, historical data may be different from what was reported in prior years.

In the Merrimack Valley region the total number of non-motorized fatalities and serious injuries in the most recent 5-year periods is 21 for the 2015 to 2019 and the 2016 to 2020 five year av- erage. The total number of non-motorized fatalities and serious injuries was 20 from 2014 to
2018.
In recent years, MassDOT and the Merrimack Valley MPO have invested in “complete streets”, bicycle and pedestrian infrastructure, intersection and safety improvements in both the Capital Investment Plan (CIP) and Statewide Transportation Improvement Program (STIP) to address increasing mode share and to incorporate safety mitigation elements into projects. Moving for-
ward, Merrimack Valley MPO, alongside MassDOT, is actively seeking to improve data
Draft FFYs 2023-2027 MVMPO TIP April 2022 18
collection and methodology for bicycle and pedestrian VMT counts and to continue analyzing crash clusters and crash counts that include both motorized and non-motorized modes in order
to address safety issues at these locations.
Draft FFYs 2023-2027 MVMPO TIP April 2022 19

Figure 1 Statewide Total Fatalities and Fatal Crash Rates (5-Year Averages)

400

350

300

250

362

359

:361

Total Fatalities

(5-year Av,erages)

364 357 357 354 35

344

1.00

340 0.90

0.80

0.70

-

'l)

(J)

'1)

0.60 +-'

!::'.::

:200

+-'

Q:J

0.50

Q::O

=-=:

LL 150

0

Q:JO

LL

1' 00

T'-

0.30 I;.,_

50

0

108-112 11}9-'13 110-114 '11-"15 1 2-1 6 '13-'17 114-118 '15-'19

0-120 1 17-'21 118-122

0.20

0.10

0.00

--Aclual fatalities

Projeotoo Targets

--Projeote<J Targe s f alaIlly Rate

- - - - Trend Line (FalaIlly Rate)

Draft FFYs 2023-2027 MVMPO TIP April2022 20

Figure 2 Merrimack Valley Total Fatalities and Fatal Crash Rates (5-Year Averages)

Merrimack Valley Total Fatalities

(5-Year Averages)

25

1.00

1-

20

20 18.6

19.6

18

20.8

0.90

>

0.80 c

17.2

17.6

16.4 16.6

0

o.7o .E

15 0.60 8

:E

.......

10

0.50

0.40

T'""

lo...

Q)

0.

Q)

0.30 a:

5 0.20 £

ro

0

'08-'12 '09-'13 '10-'14 '11-'15 '12-'16 '13-'17 '14-'18 '15-'19 '16-'20

0.10

LL

0.00

-- 5-Year Average Fatalities

·········Trendline (Fatality Rate)

5-Year Average Fatality Rate

Draft FFYs 2023-2027 MVMPO TIP April 2022 21

Figure 3 Statewide Total Serious Injuries and Serious Injury Crash Rates (5-Year Averages)

000

3500

rn 3000

3595

lotal Serious Injuries

(5-year A.verarles)

10

3438 3366 3295 9

31 6

2943 8

2816 2757

tD 2642 25 42 254

7 ..r..o... ..

·22500

0)

0::::::::,

6 >...

._, 0

.:.:.:.J.i...:,..-.=-.-:.

_.......

..r..o...

2000

5-c · -

-1500

c...

IDa

_::o:Ji , _

._,

3 tD (b

1000

500

0

'G8-1 12 '09-'13 '10-'1 '11-'15 '12-'16 1 13-117 114-1 18 '15-'19 '16-'20

7-'21 '18-'22

(f) ,.a.__,.

2

1

0

--Actual ln.ii!Jrries

Injury Rate T.argeis

--Proected Targets

- -- - Trend Lillie (lnji!Jrry Ral e)

e lllljury Rale

Draft FFYs 2023-2027 MVMPO TIP April2022 22

Figure 4 Merrimack Valley Total Serious Injuries and Serious Injury Crash Rates (5-Yr Averages)


Draft FFYs 2023-2027 MVMPO TIP April 2022 23

Figure 5 Statewide Total Combined Non-Motorized Injuries & Fatalities

Total Combined Non-Motorized

Injuries & Fatalities

(5-year Averages)

Projected

600 5-Year

544 550 Rolling CY22

528 Average Target

505 508

487 484 475 471

500

.......

·..r..o...

4so

400

o6 350

Q)

·c 300

·:-:::-J .

c 250

"'0

Qc) 200

.E.0 150

8 100

50

0

'08-'12 '09-'13 '10-'14 '11-'15 '12-'16 '13-'17 '14-'18 '15-'19 '16-'20 '17-'21 '18-'22

Actual Injuries & Fatalities Projected Targets

Draft FFYs 2023-2027 MVMPO TIP April 2022 24

Figure 6 Merrimack Valley Total Combined Non-Motorized Injuries & Fatalities

Merrimack Valley Total Combined Non-Motorized

Injuries & Fatalities

(5-Year Averages)

25

en 20.6 21.4

Q) 20

±:: 20 18.8

co

+c-o' 17.2 16.4 17.2 17.2

LL

oe6n 15

Q)

·;:::::

::::J

·c- 10

"'0

Q)

c

..0

E 5

0

()

0

'08-'12 '09-'13 '10-'14 '11-'15 '12-'16 '13-'17 '14-'18 '15-'19 '16-'20

5-Year Time Period

Draft FFYs 2023-2027 MVMPO TIP April 2022 25

Bridge & Pavement Performance Measures (PM 2)

On October 24, 2018 the Merrimack Valley MPO chose to adopt the 2-year (2020) and
4-year (2022) statewide bridge and pavement performance measure targets set by MassDOT. MassDOT was required to adopt a statewide target by May 20th, 2018, with MPOs either adopting the statewide target or establishing their own by November 2018. In setting these targets, MassDOT has followed FHWA guidelines by measuring bridges and pavement condition using the 9-point National Bridge Inventory Standards (NBIS); the International Roughness Index (IRI); the presence of pavement rutting; and the presence of pavement cracking. 2-year and 4-year targets were set for six individual performance measures: percent of bridges in good condition; percent of bridges in poor condition; percent of Interstate pavement in good condition; percent of Interstate pave- ment in poor condition; percent of non-Interstate pavement in good condition; and per- cent of non-Interstate pavement in poor condition. All of the above performance measures are tracked in greater detail in MassDOT’s Transportation Asset Manage- ment Plan (TAMP), which was finalized in September 2019. It is posted here: https://www.mass.gov/service-details/massdot-asset-management.
Targets for bridge-related performance measures were determined by identifying which bridge projects are programmed and projecting at what rate bridge conditions deterio- rate. The bridge-related performance measures measure the percentage of deck area, rather than the total number of bridges.
Performance targets for pavement-related performance measures were based on a sin- gle year of data collection, and thus were set to remain steady under the guidance of FHWA. These baseline measures were revisited at the 2-year mark (2020) and reported by MassDOT in the 2020 Mid-performance report. (See table on next page.) The deci- sion was made in the Mid-performance report to keep the pavement condition targets
the same.
MassDOT continues to measure pavement quality and to set statewide short-term and long-term targets in the MassDOT Performance Management Tracker using the Pave- ment Serviceability Index (PSI), which differs from IRI. These measures and targets are used in conjunction with federal measures to inform program sizing and project selec-
tion.
Draft FFYs 2023-2027 MVMPO TIP April 2022 26

Performance

Measures

Baseline 2-Year 2-year target 4-year target Condition/ (2020) (2022) Performance

Percentage of Pave- ments of the Inter- state

System in Good

Condition

75.6% 70.0%

Percentage of Pave- ments of the Inter- state

System in Poor

Condition

0.1% 4.0%

Percentage of Pave- ments of the Non-In- terstate NHS in Good Condition

32.9% 34.1% 30.0% 30.0%

Percentage of Pave- ments of the Non-In- terstate NHS in Poor Condition

31.4% 31.4% 30.0% 30.0%

Percentage of NHS Bridges Classified as in Good Condition

15.1% 15.6% 15.0% 16.0%

Percentage of NHS Bridges Classified as in Poor Condition

13.1% 13.5% 13.0% 12.0%





Reliability, Congestion, & Emissions Performance Measures (PM3)

On October 24, 2018 the Merrimack Valley MPO chose to adopt the 2-year (2020) and
4-year (2022) statewide reliability, congestion, and emissions performance measure tar- gets set by MassDOT. MassDOT was required to adopt a statewide target by May 20th,
2018, with MPOs either adopting the statewide target or establishing their own by No- vember 2018.
MassDOT followed FHWA regulation in measuring Level of Travel Time Reliability (LOTTR) on both the Interstate and non-Interstate NHS as well as Truck Travel Time Reliability (TTTR) on the Interstate system using the National Performance Manage-
ment Research Dataset (NPMRDS) provided by FHWA. These performance measures
Draft FFYs 2023-2027 MVMPO TIP April 2022 27
aim to identify the predictability of travel times on the roadway network by comparing the average travel time along a given segment against longer travel times. For LOTTR, the performance of all segments of the Interstate and of the non-Interstate NHS are de- fined as either reliable or unreliable based on a comparison between the 50th percentile travel time and the 80th percentile travel time, and the proportion of reliable segments is reported. For TTTR, the ratio between the 50th percentile travel time and the 90th per- centile travel time for trucks only along the Interstate system is reported as a statewide measure. As this data set has but one year of consistent data, FHWA guidance has been to set conservative targets and to adjust future targets once more data becomes available. To that end, MassDOT’s reliability performance targets are set to remain the same. These baseline measures were revisited at the 2-year mark (2020) and reported by MassDOT in the 2020 Mid-performance report. (See table on next page.) The deci- sion was made in the Mid-performance report to keep the LOTTR and TTTR perfor- mance targets the same.
The Merrimack Valley MPO, an agency whose planning area includes communities in the Boston Urbanized Area (UZA), and as a signatory to the 2018 Boston UZA Memo- randum of Understanding (Boston UZA MOU)—has also adopted 2-year (2020) and 4- year (2022) Boston UZA-wide congestion performance measure targets. These perfor- mance measures are the percentage of non-single occupancy vehicle (SOV) travel and the Peak Hour Excessive Delay (PHED). Targets were developed in coordination with state Departments of Transportation and neighboring MPOs with planning responsibility for portions of the Boston UZA.
The percentage of non-SOV travel is approximated using the U.S. Census Bureau’s American Community Survey (ACS) Journey-to-Work data. In the Boston UZA, the proportion of non-SOV travel has been steadily increasing and is projected to continue increasing at a rate of 0.32% annually. The 2016 baseline measure was revisited at the
2-year mark (2020) and reported by MassDOT in the 2020 Mid-performance report. (See table on next page.) The decision was made in the Mid-performance report to develop new targets for this measure for 2022. The new data for 2017 showed that the share of Non-Single Occupancy Vehicle Trips was 34.1%, which is higher than the
33.9% figure previously predicted by MassDOT for that year. Similarly, the 34.6% share of trips measured in 2018 was higher than the 34.2% share that was previously projected. As a result, MassDOT increased the target for 2022 to 35.8%. Technically the Merrimack Valley MPO does not have to adopt this target because we are an
Attainment Area. However, since the MVMPO supports the idea of increasing the percentage of non-single occupancy vehicle travel in the region, the MVMPO adopted the new 2022 target of 35.8% for percentage of non-SOV travel measure on June 23,
2021.
Draft FFYs 2023-2027 MVMPO TIP April 2022 28
PHED is measured by totaling the number of hours spent in excessive delay (defined as travel time at 20 miles per hour or at 60% of the posted speed limit, whichever is
greater) in peak hours (between 6:00 am and 10:00 am, and between 3:00 pm and 7:00 pm) divided by the total UZA population. As of target-setting, there was only one year of data available. As such, the performance targets have been set flat until further data is available. This baseline measure was revisited at the 2-year mark (2020) and reported by MassDOT in the 2020 Mid-performance report. (See table on next page.) The deci- sion was made in the Mid-performance report to keep the PHED target the same.
Emissions reduction targets are measured as the sum total of all emissions reductions anticipated through CMAQ-funded projects in non-attainment or air quality maintenance areas (currently the cities of Lowell, Springfield, Waltham, and Worcester, and the town of Oak Bluffs) identified in the Statewide Transportation Improvement Program (STIP). This anticipated emissions reduction is calculated using the existing CMAQ processes. The Merrimack Valley MPO does not have any communities in Non-Attainment and therefore does not need to adopt the emissions reductions targets. They are included at


the end of the table below for information.

Measure Baseline 2-Year 2-year 4-year 4-year Condition/ (2020) (2022) Adjusted Performance Target

Percent of the Person - Miles Traveled on the Interstate That Are Reli- able

70.0% 69.1% 68.0% 68.0%

Percent of the Person - Miles Traveled on the Non-Interstate NHS That Are Reliable

82.4% 80.0%

Truck Travel Time Reli- ability (TTTR) Index

1.84 1.86 1.85 1.85

Annual Hours of Peak Hour Excessive Delay Per Capita (PHED): (Ur- banized Area 1)

25.6 18.3

Percent of Non-Single Occupancy Vehicle (Non-SOV) Travel: (Urbanized Area 1)

33.6% (2016)

34.6% 34.5% 35.1% 35.8%




Draft FFYs 2023-2027 MVMPO TIP April 2022 29

Total Emissions Reduc- tions: PM2.5

0.000

0.000

0.000

Total Emissions Reduc- tions: NOx

0.742

0.490

0.500

1.600

1.710

Total Emissions Reduc- tions: VOC

1.667

0.534

0.600

0.900

0.559

Total Emissions Reduc- tions: PM10

0.000

0.000

Total Emissions Reduc- tions: CO

24.452

6.637

1596.510

1596.510

6.530

Draft FFYs 2023-2027 MVMPO TIP April 2022 30

MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table

Performance Measure Cat- egory

Performance Measure

Recent Data

Targets

PM1: HSIP

and Safety

Number of Fatalities Statewide

(All Public Roads)

354 average number of fatali- ties/ year for 2016 to 2020

CY 2020 Target = 347

CY 2021 Target = 339

CY 2022 Target = 328 fatalities

PM1: HSIP

and Safety

Fatality rate per 100 million ve- hicle-miles traveled.

0.57 fatalities per 100 million ve- hicles miles traveled per year average for 2016 to 2020

CY 2020 Target = 0.56

CY 2021 Target = 0.55

CY 2022 Target = 0.56 fatalities per

100 million vehicle miles traveled

PM1: HSIP

and Safety

Number of Serious Injuries

Statewide (All Public Roads)

2,642 average number of seri- ous injuries per year average from 2016 to 2020

CY 2020 Target = 2,689

CY 2021 Target = 2,580

CY 2022 Target = 2,384 serious inju- ries

PM1: HSIP

and Safety

Serious injury rate per 100 mil- lion vehicle-miles traveled.

4.28 serious injuries per 100 mil- lion vehicle miles traveled per year average for 2016 to 2020

CY 2020 Target = 4.30

CY 2021 Target = 4.23

CY 2022 Target = 3.83 serious inju- ries per 100 million vehicle miles trav- eled

PM1: HSIP

and Safety

Number of Non-motorized Fa- talities and Non-motorized Se- rious Injury Statewide (All Pub- lic Roads)

484 non-motorized five-year av- erage combined serious injuries and fatalities per year for 2016 to 2020

CY 2020 Target = 505

CY 2021 Target = 506

CY 2022 Target = 483 combined fa- talities and serious injuries for non- motorized modes

Draft FFYs 2023-2027 MVMPO TIP April 2022 31

MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table (Cont.)

Performance Measure Cat- egory

Performance Measure

Recent Data

Targets

PM2: Pave- ment and Bridge Condi- tion

Percentage of Pavements of the Interstate

System in Good Condition Statewide

75.6% (2-Yr Condition Mid-Per- formance Report)

CY 2020 Target = 70% CY 2022 Target = 70%

PM2: Pave- ment and Bridge Condi- tion

Percentage of Pavements of the Interstate

System in Poor Condition Statewide

0.1% (2-Yr Condition Mid-Perfor- mance Report)

CY 2020 Target = 4% CY 2022 Target = 4%

PM2: Pave- ment and Bridge Condi- tion

Percentage of Pavements of the non-Inter- state NHS in Good Condition Statewide

34.1% (2-Yr Condition Mid-Per- formance Report)

CY 2020 Target = 30% CY 2022 Target = 30%

PM2: Pave- ment and Bridge Condi- tion

Percentage of Pavements of the non-Inter- state NHS in Poor Condition Statewide

31.4% (2-Yr Condition Mid-Per- formance Report)

CY 2020 Target = 30% CY 2022 Target = 30%

Draft FFYs 2023-2027 MVMPO TIP April 2022 32

MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table (Cont.)

Performance Measure Cat- egory

Performance Measure

Recent Data

Targets

PM2: Pave- ment and Bridge Condi- tion

Percentage of NHS bridges by deck area in

Good Condition Statewide

15.6% (2-Yr Condition Mid-Per- formance Report)

CY 2020 Target = 15% CY 2022 Target = 16%

PM2: Pave- ment and Bridge Condi- tion

Percentage of NHS bridges by deck area in

Poor Condition Statewide

13.5% (2-Yr Condition Mid-Per- formance Report)

CY 2020 Target = 13% CY 2022 Target = 12%

PM3: System Performance/ Freight/ CMAQ

Percent of Person-Miles Traveled on the In- terstate that are Reliable Statewide

69.1% (2-Yr Performance Mid- Performance Report)

CY 2020 Target = 68% CY 2022 Target = 68%

PM3: System Performance/ Freight/ CMAQ

Percent of Person-Miles Traveled on the Non-Interstate NHS that are Reliable Statewide

82.4% (2-Yr Performance Mid- Performance Report)

CY 2020 Target = 80% CY 2022 Target = 80%

Draft FFYs 2023-2027 MVMPO TIP April 2022 33

MassDOT/ Adopted by MVMPO Performance Measures/ Targets Summary Table (Cont.)

Performance Measure Cat- egory

Performance Measure

Recent Data

Targets

PM3: System Performance/ Freight/ CMAQ

Truck Travel Time Reliability (TTTR) Index on the Interstate System Statewide

1.86 (2-Yr Performance Mid-Per- formance Report)

CY 2020 Target = 1.85

CY 2022 Target = 1.85

PM3: System Performance/ Freight/ CMAQ

Annual Hours of Peak Hour Excessive De- lay (PHED) per Capita in the UZA

25.6 (2-Yr Performance Mid-Per- formance Report)

2018-2019 Two-year

Target = 18.3

2018-2021 Four-year

Target = 18.3

PM3: System Performance/ Freight/ CMAQ

Percent of Non-SOV Travel on the NHS System in the UZA

34.6% (2-Yr Performance Mid- Performance Report)

CY 2020 Target =

34.5%

CY 2022 Target =

35.8%

Draft FFYs 2023-2027 MVMPO TIP April 2022 34

Regional Target Projects’ Relationship to Regional Planning Efforts and Performance Management

TIP Year

Project

Description

Included in Regional

Transportation Plan (RTP)

Included in

Regional or State Modal

Plan

Resulted from Corridor

Study

Resulted from MPO Tech- nical Assistance Request

Included in Other Plans (e.g. local Master Plan, CEDS, etc.)

Project’s Relationship to Performance

Measures/ Other Regional Goals

2027

Amesbury- Riverwalk Connector to the Salisbury Point Ghost Trail

(# 611977)

No

Yes

No

No

Will complete the Coastal Trails and Active Transporta- tion Plan connection between Amesbury and Salisbury.

Completes trail con- nection between 2

State Priority Devel- opment Areas.

Performance Measures Project will help meet:

1) Number of non-motorized fatalities and non-mo- torized serious injury.

Meets RTP Goals of:

1) Increase Safety for all Modes

2) Create a Multi Modal Transportation System to

Support Mode Shift

3) Promote Economic Vitality

4) Promote Environmental Sustainability

Draft FFYs 2023-2027 MVMPO TIP April 2022 35

Regional Target Projects’ Relationship to Regional Planning Efforts and Performance Management (Cont.)

TIP Year

Project

Description

Included in Regional

Transportation Plan (RTP)

Included in Regional or

State Modal Plan

Resulted from Corridor

Study

Resulted from MPO Tech- nical Assistance Request

Included in Other Plans (e.g. local Master Plan, CEDS, etc.)

Project’s Relationship to Performance

Measures/ Other Regional Goals

2027

Haverhill- Road- way Reconstruc- tion on North Av- enue, from Main Street (Route

125) to Plaistow, NH (# 608788)

Yes

No

No

No

No

Performance Measures Project will help meet:

1) Number of non-motorized fatalities and non-mo- torized serious injury

Meets RTP Goals of:

1) Maintain Existing Infrastructure in State of Good

Repair

2) Increase Safety for all Modes

3) Create a Multi Modal Transportation System to

Support Mode Shift

Draft FFYs 2023-2027 MVMPO TIP April 2022 36

Regional Target Projects’ Relationship to Regional Planning Efforts and Performance Management (Cont.)

TIP Year

Project

Description

Included in Regional

Transportation Plan (RTP)

Included in Regional or

State Modal Plan

Resulted from Corridor

Study

Resulted from MPO Tech- nical Assistance Request

Included in Other Plans (e.g. local Master Plan, CEDS, etc.)

Project’s Relationship to Performance

Measures/ Other Regional Goals

2024

Methuen– Intersection Im- provements at Riverside Drive and Burnham Road

(# 610658)

No

No

No

No

Will improve pedes- trian and bicyclist ac- cess to Raymond J. Martin Riverside Park recently renovated with a Massachusetts PARC Grant.

Performance Measures Project will help meet:

1) Number of non-motorized fatalities and

non-motorized serious injury

Meets RTP Goals of:

1) Maintain Existing Infrastructure in State of Good Repair

2) Increase Safety for all Modes

3) Create a Multi Modal Transportation

System to Support Mode Shift

4) Transportation Equity

Draft FFYs 2023-2027 MVMPO TIP April 2022 37

Regional Target Projects’ Relationship to Regional Planning Efforts and Performance Management (Cont.)

TIP Year

Project

Description

Included in Regional

Transportation Plan (RTP)

Included in Regional or

State Modal Plan

Resulted from Corridor

Study

Resulted from MPO Tech- nical Assistance Request

Included in Other Plans (e.g. local Master Plan, CEDS, etc.)

Project’s Relationship to Performance

Measures/ Other Regional Goals

2027

Newburyport– Intersection Im- provements @ Route 1 & Mer- rimac Street (#608029)

Yes

No

No

Yes

Is in a State Priority Development Area. Is in an area with Highest Potential for Everyday Biking as presented in the Mass. Statewide Bi- cycle Plan.

Performance Measures Project will help meet:

1) Number of non-motorized fatalities and

non-motorized serious injury

Meets RTP Goals of:

1) Maintain Existing Infrastructure in State of Good Repair

2) Increase Safety for all Modes

3) Create a Multi Modal Transportation

System to Support Mode Shift

Draft FFYs 2023-2027 MVMPO TIP April 2022 38

Regional Target Projects’ Relationship to Regional Planning Efforts and Performance Management (Cont.)

TIP Year

Project

Description

Included in Regional Transportation Plan (RTP)

Included in Regional or

State Modal Plan

Resulted from Corridor

Study

Resulted from MPO Technical Assistance Request

Included in

Other Plans (e.g. local Mas- ter Plan, CEDS, etc.)

Project’s Relationship to Performance

Measures/ Other Regional Goals

2024 to

2027

North Andover– Corridor Im- provements on Route 114, be- tween Waverly Road & Wil- low/Mill Street

(# 608095)

Yes

Is in an area with High Poten- tial for Every- day Biking in the Mass. Statewi de Bi- cycle Plan.

Yes

Local Pri- ority Devel- opment Area

North Andover Master Plan

Performance Measures Project will help meet:

1) Number of non-motorized fatalities and non-mo- torized serious injury.

2) Percentage of Pavements of the non-Interstate

NHS in Good condition.

3) Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reliable.

4) Number and Rate of Serious Injuries

Meets RTP Goals of:

1) Maintain Existing Infrastructure in State of Good

Repair

2) Increase Safety for all Modes

3) Create a Multi Modal Transportation System to

Support Mode Shift

4) Promote Economic Vitality

5) Promote Environmental Sustainability

6) Transportation Equity

Draft FFYs 2023-2027 MVMPO TIP April 2022 39

Regional Target Projects’ Relationship to Regional Planning Efforts and Performance Management (Cont.)

TIP Year

Project

Description

Included in Regional

Transportation Plan (RTP)

Included in Regional or

State Modal Plan

Resulted from Corridor

Study

Resulted from MPO Tech- nical Assistance Request

Included in Other Plans (e.g. local Master Plan, CEDS, etc.)

Project’s Relationship to Performance

Measures/ Other Regional Goals

2023 to

2024

Salisbury– Re- construction of Route 1 (Lafa- yette Road)

Yes

Will complete the roadway after a CEDS project to ex- tend the sewer line along Route 1 is completed.

Local Priority De- velopment Area.

Performance Measures Project will help meet:

1) Number of non-motorized fatalities and non- motorized serious injury.

2) Percentage of Pavements of the non-Interstate

NHS in Good condition.

3) Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reliable.

4) Number and Rate of Serious Injuries

Meets RTP Goals of:

5) Maintain Existing Infrastructure in State of

Good Repair

6) Increase Safety for all Modes

7) Create a Multi Modal Transportation System to

Support Mode Shift

8) Promote Economic Vitality

9) Promote Environmental Sustainability

Draft FFYs 2023-2027 MVMPO TIP April 2022 40

Performance Target(s) Project Will Help Meet

(2023 to 2027 Statewide and Regional Target Funds)

Year(s) Program- med

City/ Town

Project Description

Total Cost

Programmed

Federal Performance Target(s) Project Will Help Meet

2027

Amesbury

Amesbury– Riverwalk Connector to the

Salisbury Point Ghost Trail (# 611977)

$2,448,760

1) Number of non-motorized fatalities and non-motorized serious injury.

2025

Andover

Andover- Bridge Preservation, A-09-

022, I-93 over Merrimack River (#

612193)

$38,102,400

1) Percentage of NHS bridges classified as in Good condition.

2) Percentage of Pavements of the In- terstate System in Good Condition and in Poor Condition

3) Percent of the Person-Miles Traveled on the Interstate that are Reliable.

4) Truck Travel Time Reliability (TTTR) Index on the Interstate System.

2023-

2026

Andover

Andover- Bridge Rehabilitation, A-09-

036, I-495 over St 28 (SB), A-09-037, I-

495 over B&M and MBTA, A-09-041, I-

495 over St 28 (NB) (# 606522)

$173,075,000

1) Percentage of NHS bridges classified as in Good condition.

2) Percentage of Pavements of the In- terstate System in Good Condition and in Poor Condition

3) Percent of the Person-Miles Traveled on the Interstate that are Reliable.

4) Truck Travel Time Reliability (TTTR) Index on the Interstate System.

2025

Andover

Andover– Bridge Replacement, A-09-

015, Tewksbury Street over MBTA/ BMRR (# 612143)

$17,383,839

Draft FFYs 2023-2027 MVMPO TIP April 2022 41

Performance Target(s) Project Will Help Meet

(2023 to 2027 Statewide and Regional Target Funds) (Cont.)

Year(s) Program- med

City/ Town

Project Description

Total Cost

Programmed

Federal Performance Target(s) Project Will Help Meet

2025

Andover- Tewksbury

Andover-Tewksbury- Interstate Mainte- nance and related work on I-93 (#

612045)

$18,525,197

1) Percentage of Pavements of the In- terstate System in Good Condition and in Poor Condition

2) Percent of the Person-Miles Traveled on the Interstate that are Reliable.

3) Truck Travel Time Reliability (TTTR) Index on the Interstate System.

2024

George- town / Box- ford

Georgetown- Boxford Border to Boston Trail, from Georgetown Road to West Main Street (Route 97) (# 607541)

$2,520,436

1) Number of non-motorized fatalities and non-motorized serious injury.

2) Percent change in Tailpipe CO2

Emissions on the NHS Compared to

Calendar Year 2017 Level.

2026

George- town / Newbury

Georgetown- Newbury Border to Boston Trail, (Northern Georgetown to Byfield Section) (# 607542)

$6,798,000

Number of non-motorized fatalities and non-motorized serious injury.

2026

Groveland

Groveland- Improvements at Dr. Elmer

Bagnall Elementary (SRTS) (#S12208)

$1,858,080

Number of non-motorized fatalities and non-motorized serious injury.

Draft FFYs 2023-2027 MVMPO TIP April 2022 42

Performance Target(s) Project Will Help Meet

(2023 to 2027 Statewide and Regional Target Funds) (Cont.)

Year(s) Program- med

City/ Town

Project Description

Total Cost

Programmed

Federal Performance Target(s) Project Will Help Meet

2024-

2027

Haverhill

Haverhill– Bridge Replacement, H-12-

007 & H-12-025, Bridge Street (SR 125) over the Merrimack River (# 605304) (AC Yrs 4 of 4)

$108,011,904

1) Percentage of NHS bridges classified as in Good condition.

2) Percentage of Pavements of the Non-Interstate NHS in Good Condition and in Poor Condition

3) Percent of the Person-Miles Traveled on the Non- Interstate NHS that are Re- liable.

2024-

2027

Haverhill

Haverhill– Bridge Replacement, H-12-

040, I-495 (NB & SB) over Merrimack

River (#609466) (AC Yrs 4 of 4)

$96,087,420

1) Percentage of NHS bridges classified as in Good condition.

2) Percentage of Pavements of the In- terstate System in Good Condition and in Poor Condition

3) Percent of the Person-Miles Traveled on the Interstate that are Reliable.

4) Truck Travel Time Reliability (TTTR) Index on the Interstate System.

2027

Haverhill

Haverhill– Roadway Reconstruction on

North Avenue, from Main Street (Route

125) to Plaistow, NH (# 608788)

$5,798,257*

Number of non-motorized fatalities and non-motorized serious injury.

* Haverhill North Avenue is AC’d FFY 2028 and 2029 = $ 17,802,740 Total Project Cost =$23,600,997
Draft FFYs 2023-2027 MVMPO TIP April 2022 43

Performance Target(s) Project Will Help Meet

(2023 to 2027 Statewide and Regional Target Funds) (Cont.)

Year(s) Program- med

City/ Town

Project Description

Total Cost

Programmed

Federal Performance Target(s) Project Will Help Meet

2026

Lawrence

Lawrence– Bridge Replacement, L-04-

012, Short Street over Spicket River

(# 612074)

$3,285,005

2025

Lawrence

Lawrence– Community Day Arlington

Improvements (SRTS) (# 612002)

$1,554,211

Number of non-motorized fatalities and non-motorized serious injury.

2024-

2025

Lawrence

Lawrence– Lawrence Manchester Rail

Corridor (LMRC) Rail Trail (# 608930)

$21,416,304

Number of non-motorized fatalities and non-motorized serious injury

2024

Lawrence

Lawrence– Roadway Reconstruction on Amesbury Street (# 610924)

$8,028,654

1) Number and rate of fatalities.

2) Number and rate of Serious Injuries

3) Number of non-motorized fatalities and non-motorized serious injury

2025

Methuen

Methuen- Bridge Replacement, M-17-

026, Route 213 EB/WB over the Me- thuen Rail Trail (# 612158)

$4,598,252

1) Percentage of NHS bridges classified as in Good condition.

2024

Methuen

Methuen– Intersection Improvements at Riverside Drive and Burnham Road (# 610658)

$2,063,889

1) Number and rate of fatalities.

2) Number and rate of Serious Injuries

3) Number of non-motorized fatalities and non-motorized serious injury

Draft FFYs 2023-2027 MVMPO TIP April 2022 44

Performance Target(s) Project Will Help Meet

(2023 to 2027 Statewide and Regional Target Funds) (Cont.)

Year(s) Program- med

City/ Town

Project Description

Total Cost

Programmed

Federal Performance Target(s) Project Will Help Meet

2027

New- buryport

Newburyport– Intersection Improve- ments @ Route 1 & Merrimac Street (#

608029)

$2,870,513

1) Number and rate of fatalities.

2) Number and rate of Serious Injuries

3) Number of non-motorized fatalities and non-motorized serious injury

2024-

2027

North

Andover

North Andover- Corridor Improvements on Route 114, between Waverly Road

& Willow/Mill Street (# 608095)

$34,083,859

1) Number of non-motorized fatalities and non-motorized serious injury.

2) Percentage of Pavements of the non- Interstate NHS in Good condition.

3) Percent of the Person-Miles Traveled on the non-Interstate NHS that are Reli- able.

4) Number and Rate of Serious Injuries

2023

Rowley

Rowley– Safety Improvements at Route

1, Central and Glen Streets

(# 609392)

$1,330,785

1) Number and rate of fatalities.

2) Number and rate of Serious Injuries

2023-

2024

Salisbury

Salisbury– Reconstruction of Route 1 (Lafayette Road) (# 602202)

$19,266,283

1) Number and rate of fatalities.

2) Number and rate of Serious Injuries

3) Number of non-motorized fatalities and non-motorized serious injury

Draft FFYs 2023-2027 MVMPO TIP April 2022 45

Transit Asset Management (TAM) Plan Performance Management Targets

The MVRTA revised its TAM Plan July 8, 2021. The TAM Performance Management Tar- gets were adopted by the MVRTA Advisory Board on July 8, 2021. The Merrimack Valley MPO adopted these targets at its July 28, 2021 MPO meeting.
The following information is from the MVRTA Transit Asset Management Plan

Annual Performance Targets and Measures

As a recipient of Federal Transit Administration funds, the MVRTA is required to develop and maintain a Transit Asset Management Plan per FTA’s Final Rule at 49 CFR Part 625. As defined by the Rule, Transit Asset Management (TAM) is the strategic and systematic practice of processing, operating, inspecting, maintaining, rehabilitating and replacing transit capital assets to manage their performance, risks and cost over their life cycles to provide safe, cost effective and reliable public transportation.
The preparation of the TAM is based on identifying the transit assets which the MVRTA
owns and has direct Capital responsibility for and the performance measures included in the Final Rule that relate to these identified assets.

Performance Measure

Equipment

Non-revenue support-service and maintenance vehicles

Percentage of vehicles met

or exceeded Useful Life

Benchmark

Rolling Stock

Revenue vehicles by mode, bus/ van

Percent of vehicles met or exceeded Useful Life Benchmark

Facilities

Maintenance and administra- tive facilities: and passenger stations (buildings) and park- ing facilities

Percentage of Assets with

condition rating below 3.0 on FTA TERM Scale.

Draft FFYs 2023-2027 MVMPO TIP April 2022 46

Using these Performance Measures leads to the setting of targets against the defined Use- ful Life Benchmark (ULB). Which FTA defines as:
The expected lifecycle of a capital asset for a particular Transit Provider’s operating environment, or the acceptable period of use in service for a particular Transit Provider’s op-
erating environment.
The MVRTA has defined the ULB as presented in FTA circular C 5010.1E for buses and vans:

Minimum Service-life for Buses and Vans

Category

Length

Minimum Life

Category

Length

(Whichever comes first)

Category

Length

Years

Miles

Heavy-Duty Large Bus

35 to 45 ft.

12

500,000

Heavy-Duty Small Bus

30 ft.

10

350,000

Medium-Duty Transit Bus

30 ft.

7

200,000

Light-Duty Mid-Sized Bus

25 to 35 ft.

5

150,000

Light Duty Small Bus, Cutaways and Modified Van

16 to 28 ft.

4

100,000

For TAM Plan revised 7/8/2021, the MVRTA has prepared the following targets:

Transit TAM Targets

Percent of revenue vehicles that have met or exceeded their useful life benchmark:

FFY 2021

FFY 2022

FFY 2023

FFY 2024

Bus

17%

15%

15%

0%

Van

73%

0%

32%

0%

Draft FFYs 2023-2027 MVMPO TIP April 2022 47

Non-revenue vehicles - percent of service vehicles that have met or exceeded their useful life benchmark:

FFY 2021

FFY 2022

FFY 2023

FFY 2024

Maintenance Trucks

0%

0%

0%

0%

SUV (Supervisory Vehi-

cles)

0%

0%

0%

0%

Facility - percent of facilities rated below 3 on the FTA condition scale:

Passenger/ Parking facilities 0% (McGovern Center, Gateway Surface Parking, Haverhill Intermodal Parking, Costello Center)
Administrative/ maintenance facilities 0% (85 Railroad Ave. HQ)
Updates to these targets will be done in conjunction with the preparation of the next TAM Plan and the FY 2023-2027 Capital Plan.

On July 28, 2021 the Merrimack Valley MPO voted to adopt the transit TAM performance measure targets set by MVRTA for FFY 2021 through FFY 2024.

The following table lists the transit projects programmed in this TIP that help meet the
Transit TAM Performance Measures.

TAM Performance Measures Transit Projects Help Meet

Year

Project Title

Performance Measure Pro- ject helps meet

2023

MVRTA Replace 8 Model Yr 2011 35’ buses de- livery 2023 (RTD0010750)

Rolling Stock - Percent of vehicles met or exceeded Useful Life Benchmark

2023

MVRTA Replace 6 Model Yr 2017 Type E-2 vans delivery 2023 (RTD0010751)

Rolling Stock - Percent of vehicles met or exceeded Useful Life Benchmark

2023

MVRTA Replace 1 Model Yr 2017 Supervisory

Vehicle (RTD0010758)

Equipment - Percent of vehi- cles met or exceeded Useful Life Benchmark

Draft FFYs 2023-2027 MVMPO TIP April 2022 48

TAM Performance Measures Transit Projects Help Meet (Cont.)

Year

Project Title

Performance Measure

Project helps meet

2023

MVRTA- BUY REPLACEMENT VANS (RTD0011300)

Rolling Stock - Percent of vehicles met or exceeded Useful Life Benchmark

2023

MVRTA- BUY REPLACEMENTS- CAPITAL BUS (RTD0011304)

Rolling Stock - Percent of vehicles met or exceeded Useful Life Benchmark

2023

MVRTA- BUY REPLACEMENTS- CAPITAL BUS (RTD0011305)

Rolling Stock - Percent of vehicles met or exceeded Useful Life Benchmark

2023

MVRTA- REHAB/RENOVATE- MISC EQUIPMENT (RTD0011306)

Percentage of Assets with condition rating below 3.0 on FTA TERM Scale.

2023

MVRTA- ENG/DESIGN- ADMIN/MAINT FACILITY (RTD0011307)

Percentage of Assets with condition rating below 3.0 on FTA TERM Scale.

2023

MVRTA- 5339 Bus & Bus Facility Discretionary: Improvements to the McGovern Transportation Center (RTDTBD13)

Percentage of Assets with condition rating below 3.0 on FTA TERM Scale.

2024

MVRTA Replace 1 Model Year 2018

Supervisory Vehicle (RTD0010759)

Equipment - Percent of ve- hicles met or exceeded Useful Life Benchmark

2024

MVRTA Replace 8 model yr 2012 35’ buses de-

livery 2024 (8 of 8) (RTD0010753)

Rolling Stock - Percent of vehicles met or exceeded Useful Life Benchmark

2024

MVRTA - ENG/DESIGN - ADMIN/MAINT FACILITY (RTD0011308)

Percentage of Assets with condition rating below 3.0 on FTA TERM Scale.

2024

MVRTA - CONSTRUCT ADMIN/MAINT FACILITY (RTD0011309)

Percentage of Assets with condition rating below 3.0 on FTA TERM Scale.

Draft FFYs 2023-2027 MVMPO TIP April 2022 49

TAM Performance Measures Transit Projects Help Meet (Cont.)

Year

Project Title

Performance Measure

Project helps meet

2024

MVRTA - 5339 Bus & Bus Facility Discretionary: Expansion of MVRTA Bus Maintenance Facility

& Possible New Bus Hub at Bradford CR Station

(RTDTBD14)

Percentage of Assets with condition rating below 3.0 on FTA TERM Scale.

2025

MVRTA Replace 1 Model Year 2019 Supervi- sory Vehicle (RTD00010764)

Equipment - Percent of ve- hicles met or exceeded Useful Life Benchmark

2026

MVRTA Replace 1 Model Year 2020 Supervi- sory Vehicle (RTD00010769)

Equipment - Percent of ve- hicles met or exceeded Useful Life Benchmark

2027

MVRTA- BUY REPLACEMENT 35-FT BUS (RTD0011315)

Rolling Stock - Percent of vehicles met or exceeded Useful Life Benchmark

Draft FFYs 2023-2027 MVMPO TIP April 2022 50

Public Transportation Agency Safety Plan (PTASP)

The MVRTA, as a recipient of FTA Urban Area Funding Grants, is required to develop a plan to implement a Safety Man- agement System (SMS) that includes safety performance targets. The MVRTA adopted the Merrimack Valley Regional Transit Authority Safety Plan on November 10, 2020 and Revised it January 15, 2021 and transmitted the targets to the MVMPO 2/28/2021. The Merrimack Valley MPO adopted the MVRTA Safety Plan Targets on July 28, 2021. The MVRTA revised its Safety Plan with regard to personnel and responsibilities April 5, 2021, but did not change any targets.

Transit Safety Performance Targets

The following is from the MVRTA Safety Plan:

Safety Performance Targets have been set for each of the 3 modes of transit service. They are based on the safety performance measures established by MVRTA over the last 3 Fiscal Years. All goals are expressed in

number of occurrences per 100,000 miles. Below are the goals set by the MVRTA for our service.

Mode

Fatalities

Fatalities

(per 100 thousand VRM)

Injuries

(Total)

Injuries

(per 100 thousand VRM)

Safety

Events

Safety

Events (per 100 thousand VRM)

System

Reliability (VRM/ Failures)

Motor Bus

0

0

0

0

0

0

46461

Commuter Bus

0

0

0

0

0

0

For all

Demand Response

0

0

0

0

0

0

3 modes

Draft FFYs 2023-2027 MVMPO TIP April 2022 51

Part A. 3. Prioritization

The FFYs 2023-2027 Merrimack Valley Metropolitan Planning Organization’s Transportation Improvement Program (TIP) contains Federal-aid project programming information for five years. For each year, gross estimates of project costs are listed in the federal fiscal year (FFY) of the proposed advertise date. Federal fiscal years begin on October 1 and run through September 30. For example, FFY 2023 begins on October 1,
2022 and ends on September 30, 2023. The advertising dates shown for roadway projects were determined based on information provided by the Capital Expenditure and Program Office within MassDOT, the MassDOT District 4 Office, and MVMPO member communities. The MVRTA and MassDOT's Rail and Transit Division determined programming dates for transit projects.
Projects are programmed in the region’s TIP based on a number of factors. These include the project’s score based upon the MPO’s Transportation Evaluation Criteria (TEC), pro- ject cost and the availability of STBG funding in the years covered in the document. Most of the time the community is responsible for funding the design of a project and therefore their priorities greatly influence which projects will be far enough along in the design pro- cess to be programmed in the TIP. The MPO process solicits community project priorities
when developing the RTP and, when annually developing the UPWP, the communities are asked what transportation studies they would like the MPO to conduct for them. These of- ten but not always are related to the project priorities that were identified in the RTP.
These studies become the beginning of many locally generated project proposals.
Road and bridge project selection is also largely dependent upon the current and expected design status for each project, which can be affected by such factors as environmental permitting and Right-of-Way (ROW) status. When it comes to programming projects in the TIP, readiness becomes paramount, because the project needs to be through the 100% design process to be able to be advertised for construction.
For bridge projects, information from MassDOT's Bridge section is given primary consider- ation when scheduling projects.

Transportation Evaluation Criteria

In 2003, the MPOs worked with the then Massachusetts Executive Office of Transportation and Public Works (EOTPW) to develop objective evaluation criteria that could be applied
to transportation projects in the Commonwealth. Early in 2004, EOTPW asked planning
staff from the then MassHighway Planning, the MassHighway district offices and the
Draft FFYs 2023-2027 MVMPO TIP April 2022 52
regional planning agencies to apply these criteria to projects within their respective Metropolitan Planning Organizations (MPOs). Application of these criteria include not only an evaluation of the magnitude of improvement in the condition, mobility, and safety of transportation projects, but also an evaluation of their community effects and support, the land use and economic development impact, and the environmental effects. A score valued from -3 to 3 is assigned to each of the criteria. In fact, there is at least one score associated with each of the FAST Act ten planning factors. The scores within each category are averaged and then the category averages are added together to reach the total score. The following chart illustrates the data and scoring criteria for each TEC element as well as the planning factors considered in each element, and which TEC elements relate to the performance measures.
Consideration of whether a project contributes to Climate Resiliency was added to the TEC process for the MVMPO 2021 to 2025 TIP in the Environmental Effects section of the evaluation form, under the Air Quality/Climate Effects scoring component. The project receives one point under this criteria if the project involves widening a culvert and the project receives one point if it raises a facility (for example a bridge, roadway or trail) in a flood prone area.
The COVID-19 pandemic has not impacted the project scoring for this TIP. While the changes to travel patterns caused by the pandemic are certainly dramatic, it was not deemed necessary to change project scores or the transportation evaluation criteria at this time. The changes to travel patterns that have been observed in the Merrimack Valley and elsewhere in Massachusetts and New England, under total lock down, phased re-openings of the economy, and now with restrictions eliminated, but continued working from home, and virtual meetings it remains to be seen exactly how travel patterns will settle out. Consequently, it was considered inadvisable to change project scores or plans based on a temporary condition. The MVMPO will continue to monitor traffic counts and travel time reliability, but it will likely take a few years for travel patterns to settle into the “new normal”, whatever that is going to be.
The RITIS platform is a primary data source used to inform the Merrimack Valley MPO’s Congestion Management Process (CMP). The data generated by the CMP on travel times and travel reliability on the region’s NHS roadways is then considered in the roadway and trail project scoring system to evaluate the degree to which the magnitude and duration of congestion on the transportation network will be reduced through the construction of the
proposed improvements.
Draft FFYs 2023-2027 MVMPO TIP April 2022 53
The MVMPO’s CMP currently considers RITIS travel time reliability and travel time data collected through the year 2020. As the RITIS data is slightly different than previously available travel time data, there are only a few years of this newer data to compare and it shows that there had not been much change in travel time reliability, or change in travel patterns. However, now that travel patterns have changed dramatically due to the COVID-
19 pandemic and are likely to continue changing as travel reaches its “new normal” in a few years, we will then be able to examine how congestion and travel patterns have changed using the RITIS platform.
The following table provides the TEC scoring guidelines for each element scored and the
Planning Factors and Performance Measures related to each scoring element.
Draft FFYs 2023-2027 MVMPO TIP April 2022 54

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Per- formance Measures

Condition

A. Magnitude of pavement condition im- provements

Use Pavement Condi- tion Index (PCI) (if available) to rate cur- rent condition as excel- lent, good, fair, or

poor. If not available, use pavement condi- tion description from other sources.

Poor = 3 to 2

Fair = 2 to 1

Good = 1 to 2

Excellent = 0 to 1

Pavement condi- tions often vary across the project limits, and therefore scores have a range.

Excellent current condition may score a 1 if project is not expected to be pro- grammed for sev- eral years.

Preservation; Safety; Resili- ency & reliability; Economic Vitality.

Contributes to meeting Pavement Performance Measure Targets of 70% In- terstate or 30% Non-Inter- state NHS Pavements in Good Condition and/or 4% max. Interstate or 30% max. Non-Interstate Pavements in Poor Condition Statewide

B. Magnitude of improvement of other infra- structure

Types and number of upgrades

Major Upgrade such as widening a bridge = 3

Multiple upgrades from list of drainage im- provements, new side- walks, new signals, sig- nal upgrades, adding turn lanes, etc. = 3 to 2

One or two of above upgrades = 2 to 1

No Upgrades = 0

Preservation; Safety; Resili- ency & reliability; Accessibil- ity & mobility; Environmental and economic sustainability; Enhance travel & tourism; Note that all roadway pro- jects consider drainage im- provements.

Draft FFYs 2023-2027 MVMPO TIP April 2022 55

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Perfor- mance Measures

Mobility

A. Effect on magnitude and duration of congestion

Magnitude of current conges- tion, measured by Level of Ser- vice, traffic de- lays, or queue lengths, if availa- ble. If there is

not currently congestion, then score is zero un- less project causes conges- tion.

Significant reduction in conges- tion = 3

Moderate reduction in congestion

= 2

Small reduction in congestion = 1

No change in congestion = 0

Small increase in congestion = -1

Moderate increase in congestion

= -2

Significant increase in conges- tion = -3

If there is not currently con- gestion, then score is zero unless project causes new congestion.

Economic Vitality; Accessibility and Mobility; Resiliency and re- liability; Enhance travel and tourism.

Contributes to meeting System Performance Measure Targets of 68% Interstate or 80% Non- Interstate NHS person-miles travelled that are reliable Statewide and/or 1.85 Truck Travel Time Reliability Index Statewide

B. Effect on travel time and connec- tivity / access

Types and num- bers of up- grades, such as, improves travel time by widening shoulders, or signal improve- ments; provides new access, connects exist- ing trails, etc.

Major Upgrade such as providing new roadway access = 3

Multiple upgrades from signal im- provements, new sidewalks, add- ing turn lanes, new trail = 3 to 2

One or two of above upgrades, or new = 2 to 1

No Upgrades = 0

Additional point (not above 3) if providing con- nectivity be- tween schools, businesses, and other activity centers.

Economic Vitality; Accessibility and Mobility; Resiliency and re- liability; Connectivity; Enhance travel and tourism.

Draft FFYs 2023-2027 MVMPO TIP April 2022 56

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Perfor- mance Measures

Mobility

C. Effect on other modes using the fa- cility

Types and numbers of up- grades to

Other modes (means of travel)

Major Upgrade for Other mode of transportation = 3

Multiple upgrades from adding bike lanes, new sidewalks, wheelchair ramps, proximity to transit facilities =

3 to 2

One or two of above upgrades = 2 to

1

No Upgrades to Other modes = 0

Economic Vitality; Safety; Secu- rity; Accessibility and Mobility; En- vironmental and economic sus- tainability; Connectivity; Resili- ency and reliability; Enhance

travel and tourism.

Contributes to meeting System

Performance Measure Target of

34.5% Non-SOV travel on the

NHS in the UZA

D. Effect on re- gional and lo- cal traffic

Whether af- fects traffic out- side of the pro- ject limits lo- cally, and be- yond that, re- gionally

Is on the NHS, a State numbered route, connector, or highly traveled local road; and:

Substantially improves traffic region- ally = 3

Moderately improves traffic region- ally = 2 to 1

Substantially or moderately im- proves traffic locally = 2 to 1

Neutral = 0

Negative scores if adversely affects traffic to the degrees and geography above.

Economic Vitality; Accessibility and Mobility; Efficient System Management; Enhance travel and tourism.

Draft FFYs 2023-2027 MVMPO TIP April 2022 57

TEC Ele- ment

Data

Scoring

Additional

Notes

Planning Factors/ Perfor- mance Measures

Safety and Security

A. Effect on crash rate compared to State average

Whether location is designated a State defined Crash Cluster lo- cation (HSIP eligi- ble) and the

EPDO score as- signed by that performance measure, or crash rate com-

pared to State av- erage, other

safety concerns

High EPDO score, crash cluster, Top 100 crash locations = 3

Higher than average crash rate/ EPDO score = 2

Lower than average crash rate, but safety concerns are being ad- dressed = 1

No effect on crash rate = 0

Safety; Efficient System Manage- ment; Resiliency and Reliability.

Contributes to meeting HSIP and Safety Performance Measure Tar- gets for number of fatalities and serious injuries, rates of fatality and serious injury Statewide on

all public roads.

B. Effect on bicycle and pe- destrian safety

Includes improve- ments that effect bicycle and pe- destrian safety or is detrimental to pedestrian bicycle safety.

Major Upgrade, separate bike lane, or shared use path = 3

Multiple upgrades from list of: widen- ing shoulders for bikes; new or im- proved sidewalks; new pedestrian signals; wheelchair ramps; etc. = 3

to 2

One or two of above upgrades = 2 to

1

No Upgrades = 0

Could use negative scores if detri- mental to bike / pedestrian safety

Additional point (not above 3) if improvements are near schools or other areas fre- quented by bicy- clists and/ or pe- destrians, or

there is a history of crashes involv- ing bikes and/or pedestrians.

Safety; Resiliency and Reliability; Enhance Travel and Tourism.

Contributes to meeting HSIP and Safety Performance Measure Tar- gets for Number of non-motorized fatalities and serious injuries Statewide on all public roads.

Draft FFYs 2023-2027 MVMPO TIP April 2022 58

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Perfor- mance Measures

Safety and Security (Cont.)

C. Effect on transpor- tation security and evacuation

Is on the NHS.

Is a community desig- nated evacuation route.

Is within 10 miles of a nuclear power plant.

Will significantly improve travel along an evacuation route = 3

Is an evacuation route within

10 miles of a nuclear power plant, or is on the NHS and improves travel = 2

Is an evacuation route or Is within 10 miles of a nuclear power plant, or is on the NHS

= 1

Is not any of the 3 listed in the data column = 0

Security; Safety.

Community Effects and Support

A. Residential effects: ROW, noise, aes- thetic, cut through traffic, and other.

Degree of effect on residential aspects.

Improves these aspects: Significantly = 3

Moderately = 2

Slightly = 1

No effect on these aspects =

0

Creates negative effects from these aspects:

Slightly = -1

Moderately = -2

Significantly = -3

Environmental Sustainability;

Draft FFYs 2023-2027 MVMPO TIP April 2022 59

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Per- formance Measures

Community Effects and Support (Cont.)

B. Public, local government, legislative, and regional support

Degree of support.

Improves these aspects: Greatly

Supported = 3

Moderately Supported = 2

Somewhat Supported = 1

Not Supported, or unknown = 0

Some Opposition = -1

C. Effect on ser- vice to minority or low-income neighborhoods. (Title VI and EJ)

Increased or de- creased service to Title VI and EJ neighborhoods

Improves service to Title VI or EJ

neighborhoods: Significantly = 3

Moderately = 2

Slightly = 1

No effect on Title VI or EJ neighbor- hood = 0

Slightly decreased service = - 1

Moderately decreased service = - 2

Significantly decreased service = - 3

Quality of Life; Accessibility and Mobility; Resiliency and Reliability; Enhance Travel and Tourism.

Draft FFYs 2023-2027 MVMPO TIP April 2022 60

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Per- formance Measures

Community Effects and Support (Cont.)

D. Other impacts / benefits to mi- nority or low-in- come neighbor- hoods. (Title VI and EJ)

Number / degree of positive or negative impacts to Title VI and EJ neighbor- hoods

Positive Impacts to Title VI or EJ

neighborhoods: Significant = 3

Moderate = 2

Slight = 1

No effect on Title VI or EJ neighbor- hood = 0

Negative Impacts to Title VI or EJ

neighborhoods: Slight = - 1

Moderate = - 2

Significant = - 3

Quality of Life.

E. Effect on devel- opment and re- development of housing stock

Number / degree of positive or negative effects on develop- ment and redevel- opment of housing stock

Positive Impacts to development / re- development of housing stock: Significant = 3

Moderate = 2

Slight = 1

No effect on development or redevel- opment of housing stock = 0

Negative Impacts to development / redevelopment of housing stock: Slight = - 1

Moderate = - 2

Significant = - 3

Economic Vitality; Quality of

Life.

Draft FFYs 2023-2027 MVMPO TIP April 2022 61

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Per- formance Measures

Land Use and Economic Development

A. Business ef- fects: ROW, noise, traffic, parking, freight access and other.

Degree of effect on business aspects.

Improves these aspects: Signifi- cantly = 3

Moderately = 2

Slightly = 1

No effect on these aspects = 0

Creates negative effects from these aspects:

Slightly = -1

Moderately = -2

Significantly = -3

Economic Vitality; Accessi- bility and Mobility.

B. Sustainable de- velopment ef- fects. Con- sistent with Mer- rimack Valley Priority Growth Strategy (MVPGS).

Number / degree of positive or negative effects on sustaina- ble development and proximity to State and/or Re- gional Priority De- velopment

Areas (PDA)

Positive Impacts to sustainable de- velopment:

Significant = 3

Moderate = 2

Slight = 1

No effect on development or redevel- opment of housing stock = 0

Negative Impacts to development / redevelopment of housing stock: Slight = - 1

Moderate = - 2

Significant = - 3

Additional points, (not above 3) if located in or near a State or Regional Priority De- velopment Area

Economic Vitality; Con- sistency with State and lo- cal planned growth.

Draft FFYs 2023-2027 MVMPO TIP April 2022 62

TEC Element

Data

Scoring

Additional

Notes

Planning Factors/ Per- formance Measures

Land Use and Economic Development (Cont.)

C. Consistent with regional land- use and eco- nomic develop- ment plans and Merrimack Val- ley Priority Growth Strategy (MVPGS).

Degree of con- sistency with re- gional plans

Consistent with regional plans: Significantly = 3

Moderately = 2

Slightly = 1

Neutral = 0

Not Consistent with regional

Plans: Slightly = - 1

Moderately = - 2

Significantly = - 3

Additional points (not above 3) if lo- cated in or near a Regional Priority Development Area

Economic Vitality; Con- sistency with State and lo- cal planned growth and economic development plans.

D. Effect on job creation.

Estimated job crea- tion

Effect on job creation: Significant = 3

Moderate = 2

Slight = 1

Neutral = 0

Elimination of jobs: Slight = - 1

Moderate = - 2

Significant = - 3

Economic Vitality.

Draft FFYs 2023-2027 MVMPO TIP April 2022 63

TEC Element

Data

Scoring

Addi- tional Notes

Planning Factors/ Performance Measures

Environmental Effects

A. Air Quality / Climate effects

Green House Gas

Analysis Results

Effect on Air Quality:

Quantified decrease in emissions = 2 or 1

Qualitative decrease in emissions = 1

No effect on emissions = 0

Qualitative increase in emissions = -1

Quantified increase in emissions = - 2 or -

1

Climate Effects Resiliency:

A culvert is being widened = 1

A facility (ex. bridge, road or trail) in a flood prone area is being raised = 1

Protect and Enhance the

Environment.

Preservation; Resiliency & reliability; Reduce or miti- gate stormwater impacts; Contributes to meeting CMAQ Performance Measure Target of 18.3

Annual Hours of Peak Hour Excessive Delay (PHED) per Capita in the UZA

B. Water Quality / supply effects; wetlands ef- fects.

Number / degree of positive or neg- ative effects on water quality / sup- ply effects; wet- lands effects.

Effect on Water Quality / supply and wet- lands:

Positive effect: Significant = 3

Moderate = 2

Slight = 1

Neutral = 0

Negative Effect: Slight = - 1

Moderate = - 2

Significant = - 3

Protect and Enhance the Environment; Reduce or mitigate stormwater im- pacts.

Draft FFYs 2023-2027 MVMPO TIP April 2022 64

TEC Element

Data

Scoring

Addi- tional Notes

Planning Factors/ Performance Measures

Environmental Effects (Cont.)

C. Historic and cultural re- source effects

Proximity / degree of positive or nega- tive effects on his- toric and cultural resources

Positive effect on historic and cultural re- sources:

Significant = 3

Moderate = 2

Slight = 1

Neutral = 0

Negative Effect: Slight = - 1

Moderate = - 2

Significant = - 3

Often con- siders im- proved ac- cess to nearby re- sources.

Economic Vitality; Ac- cessibility and Mobility; Quality of Life; Enhance Travel and Tourism.

D. Effect on wild- life habitat and endangered species.

Location of project in State Estimated Habitat of Rare Wildlife or State Priority Habitat of Rare Species

Positive effect on wildlife or endangered species in a State designated area: Significant = 3

Moderate = 2

Slight = 1

Not in a wildlife or endangered species area = 0

Negative effect on wildlife or endanger species in a State designated area.: Slight = - 1

Moderate = - 2

Significant = - 3

Protect and Enhance the

Environment.

Draft FFYs 2023-2027 MVMPO TIP April 2022 65
The resulting Transportation Evaluation Criteria (TEC) scores for selected projects in the Merrimack Valley region that were derived by applying these criteria are shown in Appendix C. It is the goal of the MVMPO that these criteria ratings, along with information related to the readiness of projects, will make the planning process, and more specifically, the selection and prioritization of projects, more transparent to the general public. A sample project evaluation sheet showing the various criteria is in Appendix D.
The use of these TEC scores also allows the Merrimack Valley MPO to meet BIL require- ments for programming Transportation Alternatives (TA) funding (similar to TAP funding from the previous legislation). TA funding is a set-aside of Surface Transportation Block Grant Programming (STBG) through a competitive process and, in general, helps to man- age performance by focusing available funding on the highest regional priorities. It also helps to draw attention to the reader that BIL is a very Performance Measure -oriented piece of legislation.

Part A. 4. Public Participation

The principal objective of this document is the provision of an additional point for public access to and review of the transportation planning process. This FFYs 2023-2027
Transportation Improvement Program was developed in accordance with the Public Participation Process established for the Merrimack Valley Metropolitan Planning Organization (MVMPO). The MVMPO amended its current Public Involvement Process in March of 2017, it is contained in the MVMPO Public Participation Plan as Amended through March 2017 on the MVPC website under Transportation Reports. The Process
applies to the development of the Transportation Improvement Program (TIP), the Regional Transportation Plan (RTP) and the Unified Planning Work Program (UPWP). The Public Involvement Process endorsed by the MVMPO is also used by the MVRTA as its public involvement process for its program of projects. The notice of public involvement and time established for review and comment for the development of this TIP satisfies the Program
of Project requirements established by the Federal Transit Administration (FTA).
The Merrimack Valley MPO’s Public Participation Plan as amended through March 2017, reflects the consultation requirements identified in the federal transportation legisla- tion at the time and prior federal transportation authorizations, and the existing transportation planning regulations developed by the U.S. Department of Trans- portation for the development of Regional Transportation Plans and Transportation Im- provement Programs. This document identifies a number of stakeholders to be consulted in developing these documents. In developing the Draft FFYs 2023-2027 Transportation Im-
provement Program, all MVMPO stakeholders were given notice that the process of
Draft FFYs 2023-2027 MVMPO TIP April 2022 66
developing the FFYs 2023-2027 TIP was beginning. Stakeholders were also notified of the availability of the draft document for public review and comment.

Public Participation Plan (PPP) Stakeholders

Many categories of interested individuals, organizations and other stakeholders (Interested Parties) are identified by the MVMPO in the PPP. They are defined based on the individual groups identified in previous federal transportation authorizations.
The MVMPO continues to add individuals, organizations or other stakeholders to this list from the BIL and the existing transportation planning regulations developed by the U.S. De- partment of Transportation. Their addition is not considered an act requiring the formal amendment of the PPP. Similarly, any of the individuals or organizations may request to be removed from the mailing list and such action does not necessitate a formal PPP amend- ment.
The notices were sent directly to over 500 email addressees representing these groups. Notices were put in newspapers and on cable community television directing the public to the MVPC website which contained the notice and the materials for review.
In addition to these direct mailings, and in accordance with this process, public notice of the Draft FFYs 2023-2027 Transportation Improvement Program was published in the Law- rence Eagle Tribune, Newburyport Daily News, Haverhill Gazette (Published Weekly) and Rumbo News informing the public of its right to comment on the document which would be available on the MVPC website from May 4, 2022 through May 24, 2022. It said that com- ments would be received through May 24, 2022 and that two separate Virtual public hear- ings on the document would take place on May 18, 2022 from 1:00 p.m. to 2:00 p.m. and from 6:00 p.m. to 7:00 p.m. The meetings were held Virtually due to COVID-19 Virus pre- cautions and the fact that Virtual meetings are more accessible to more people. In addition, another Virtual Public Involvement (VPI) tool was used to allow public comments to be pro- vided through a “Provide Comments Now”” button on the MVPC website in the Transporta- tion MVMPO section. The MVMPO will summarize relevant comments that are received during the 21-day review and comment period and will include this summary in the Final
FFYs 2023-2027 TIP.
Draft FFYs 2023-2027 MVMPO TIP April 2022 67
Public input in developing the TIP was sought at the following meetings in 2022:

January 26, 2022, February 23, 2022, March 23, 2022, April 27, 2022 and May

25, 2022 MVMPO Meetings (all held Virtually due to COVID-19 Virus precautions and accessibility to more people)

February 3, 2022 and March 3, 2022 MVRTA Advisory Board meetings (all held as Hybrid (In-person and Virtual)) meetings

January 13, 2022, March 10, 2022 and April 14, 2022 Merrimack Valley

Transportation Committee (MVTC) meetings (all held Virtually due to COVID-19
Virus precautions and accessibility to more people)

February 17, 2022, March 17, 2022, and April 21, 2022 Merrimack Valley Planning Commission (MVPC) meetings (all held as Hybrid (In-person and Virtual)) meetings

March 2, 2022 and April 6, 2022 Merrimack Valley DPW/ Stormwater

Collaborative meetings (all held Virtually due to COVID-19 Virus precautions and accessibility to more people)
Draft FFYs 2023-2027 MVMPO TIP April 2022 68

Part A. 5. Amendment/ Adjustment Procedures

Adjustments

Minor adjustments to the TIP do not require formal MPO action and can be made via the administrative action of the Merrimack Valley MPO. These minor adjustments are limited to:

Changing the scope and description of a project as long as they are minor changes;

Changing funding amounts that are less than a ten percent increase in project cost if project cost is more than $5 million dollars;

Changing funding amounts that are an increase of less than $500,000 if project cost is $5 million dollars or less;

Changing funding sources.

Amendments

Major changes continue to require MPO action through the formal amendment process. Major changes would require a twenty-one-day public review and comment period that includes a public hearing. These changes include, but are not limited to:

Moving a currently programmed project earlier or later than an originally programmed year;

MassDOT Office of Transportation Planning (OTP) approved ten percent or more increases, or decreases, in the construction cost estimate for a project costing more than $5 million dollars;

MassDOT OTP approved project cost increase, or decrease, of $500,000 or more, in the construction cost estimate for a project costing $5 million dollars or less;

Adding a new project;

Deleting a project;

Major change in project scope large enough to necessitate an additional review by MassDOT’s Project Review Committee (PRC) – typically accompanied by major project cost change;

Exceptions

Although the MVMPO typically holds a 21-day public comment period for amendments, in the event of extenuating circumstances beyond the agency’s control, the comment period may be shortened or waived in consultation with FHWA Division Office and/or the FTA Regional Office. Additionally, MassDOT may make exceptions to the procedures outlined above and treat amendments as adjustments and/or adjustments as administrative modifications, but these exceptions will also require coordination with and concurrence by MassDOT’s
federal partners and the affected MPO.
Draft FFYs 2023-2027 MVMPO TIP April 2022 69
The above Adjustments and Amendments align with MassDOT’s definitions of Adjustments and Amendments. One difference from the MassDOT State Transportation Improvement Program (STIP) Project Revision Definitions and Procedures is that MassDOT defines an “Administrative Modification: A revision to the STIP that is minor enough in nature to re- quire neither a public process nor FHWA/FTA approval, but that does involve a notification to federal partners.”
This document does not have an “Administrative Modification”. The only items that MassDOT defines as Administrative Modifications are minor changes to Project Description and a change in any item listed in the “Additional Information” column of the STIP not cov- ered in any Amendment or Adjustment procedure. The MVMPO must use the Project De- scriptions provided by MassDOT, the only time a Project Description changes is if MassDOT changes it, this would be considered an Adjustment to this document. Any changes to “Additional Information” not listed in the Amendment/ Adjustment procedures
above would be coordinated with MassDOT and would not require action by the MVMPO.
Draft FFYs 2023-2027 MVMPO TIP April 2022 70

Part A. 6. High Priority Projects

SAFETEA-LU contained a number of earmarked transportation projects that were to receive federal funding. Specific funding amounts were obligated to each of these projects, but no additional funding was included in SAFETEA-LU to complete them. Consequently, states with these projects must implement them within the annual federal authorization limits established in the legislation. The Merrimack Valley region contains eleven such
projects which are shown below along with their status:

Highway High Priority Projects

Status

Amesbury/Newburyport – Rehabilitation of I-95 Whittier Bridge

Project Complete

Andover – Design, Engineering and Construction at I-93 The Junction

Interchange, (Andover, Tewksbury, and Wilmington)

Project

Deactivated

Haverhill – Construct Haverhill intermodal center access and vehicle capacity improvements.

Project Complete

Lawrence – Design and construct Canal and Union Street Corridor improvements.

Project Complete

Lawrence – Construct access improvements to the Lawrence Gateway

Project.

Project Complete

Methuen – Design, engineering and construction of Methuen Rotary alternative at I-93 and Routes 110 and 113.

Project Complete

Newbury – Rehabilitation and paving of Parker River Road

Project Complete

North Andover – Improvements to Mass. Ave., Andover St., Osgood St., Salem St and Johnson St. in the Old Town Center of North Andover

Project Complete

Parker River National Wildlife Refuge – Preliminary engineering for Rehabilitation and paving of Sunset Drive in National Wildlife Refuge

Project Complete

Salisbury to Boxford – Design, Engineer, Permit and Construct “Border to Boston Bikeway” rail trail project

Salisbury Section Complete. Remaining sections under Design.

Draft FFYs 2023-2027 MVMPO TIP April 2022 71

Part A.6. High Priority Projects (Continued)

Transit Projects for Bus and Bus-Related Facilities and Clean

Fuels Grant Program

Status

Haverhill – Design and Construct Intermodal Transit Parking

Improvements.

Project Complete

(see above)

Lawrence – Gateway Intermodal and Quadrant Area Reuse Project.

Project Complete

(see above)

Newburyport – Design and Construct Intermodal Facility

Project Complete

Regionally Significant Projects

Community

Project

North Andover

Corridor Improvements on Route 114, between Wa- verly Road & Willow/Mill Street (# 608095)

Draft FFYs 2023-2027 MVMPO TIP April 2022 72

Part A. 7. Advance Construction

Advance Construction is a Federal-aid fund management tool, which as described by the
Federal Highway Administration website:
“…allows states to begin a project even in the absence of sufficient Federal-aid obligation authority to cover the Federal share of project costs. It is codified in Title 23, Section 115. Advance construction eliminates the need to set aside full obligational authority before starting projects…At some future date when the state does have sufficient obligational authority, it may convert an advance-constructed project to a Federal-aid project by obligating the permissible share of its Federal-aid funds and receiving subsequent reimbursements.”
In other words, the state pays for the project with non-Federal-aid funds to begin with and can later seek reimbursement of the Federal share of the funding category’s project cost by obligating Federal-aid funding in future years.
Projects must meet the following criteria before they can be designated to use the Advanced
Construction (AC) funding mechanism:
1. The project’s estimated Federal participating cost exceeds the total regional annual target (i.e. sum of HSIP, CMAQ, TA and Non HSIP/CMAQ/TA), and
2. Construction, based on an engineering review of the project, will take place during all the years for which federal funding is programmed.
The following projects are programmed in the FFY 2023-2027 TIP using this Advance
Construction (AC) method:
North Andover- Corridor Improvements on Route 114, between Waverly Road & Willow/Mill Street
Haverhill- Bridge Replacement, H-12-040, I-495 (NB & SB) over Merrimack
River
Haverhill- Bridge Replacement, H-12-007 & H-12-025, Bridge Street (SR 125)
over Merrimack River and the Abandoned B&M RR
Haverhill- Roadway Reconstruction on North Avenue, from Main Street (Route
125) to Plaistow, NH (# 608788) (Funding for FFY 2027 included in this TIP is AC year one of the three-year project.)
Andover- Bridge Rehabilitation, A-09-036, I-495 over St 28 (SB), A-09-037, I-
495 over B&M and MBTA, A-09-041, I-495 over St 28 (NB) Lawrence- Lawrence-Manchester Rail Corridor (LMRC) Rail Trail Salisbury- Reconstruction of Route 1 (Lafayette Road)
Draft FFYs 2023-2027 MVMPO TIP April 2022 73

Part A. 8. Transportation Funding Programs

Projects listed in the TIP must show the sources of funding that will be used to complete the project. The projects in the FFYs 2023 -2027 TIP are slated to use funding from the following Federal-aid funding programs identified in the Bipartisan Infrastructure Law (BIL), enacted as the Infrastructure Investment and Jobs Act Pub. L. 117-58 (November 15,
2021). Projects may also receive non-Federal Aid funding which is shown in the project listings for informational purposes.

Highway Projects

Bridge Formula Program ((BFP) (New in the BIL)) to replace, rehabilitate, preserve, protect and construct highway bridges. Sets aside 15% of a state’s apportionment for use on “off- system” bridges.

Funding: Varies, Federal - 80%, State - 20%, but locally owned “off system” bridges
funding Federal = 100%

Bridge Investment Program ((BIP) (New in the BIL)) Competitive Grant Program to replace, rehabilitate, preserve, protect bridges and culverts.

Funding: Varies, Federal - 80%, State - 20%, but locally owned “off system” bridges
funding Federal = 100%

Coronavirus Response and Relief Supplemental Appropriations Act (CRRSAA) (New

Highway Apportionments to the Commonwealth)- a subset of HIP funds to address COVID-

19 impacts related to the HIP program.
Funding: Federal - 100%

Congestion Mitigation and Air Quality Improvement Program ((CMAQ) (continued in the

BIL)) funds projects that reduce congestion and improve air quality.

Funding: Federal - 80%, State - 20%

Federal Lands Access Program ((FLAP) (continued in the BIL)) funds projects that improve multimodal transportation on facilities that access the Federal estate including recreation sites and economic generators.

Funding: Federal– 100%

Highway Safety Improvement Program ((HSIP) (continued in the BIL)) funds safety improvement projects at high crash locations and Railway-Highway Crossings.

Funding: Federal - 90%, State -10%
Draft FFYs 2023-2027 MVMPO TIP April 2022 74

National Electric Vehicle Infrastructure Formula Program ((NEVI Formula) (new in the BIL)) to provide funding to States to strategically deploy electric vehicle (EV) charging infrastructure and to establish an interconnected network to facilitate data collection, access, and reliability.

Funding: Federal - 80%, State - 20%

National Highway Freight Program ((NHFP) (continued in the BIL)) to improve the efficient movement of freight on the National Highway Freight Network (NHFN) and support several

goals.
Funding: Federal - 80%, State - 20%

National Highway Performance Program ((NHPP) (continued in the BIL)) funds projects on all National Highway System Roadways. New in the BIL provides support for activities to increase the resiliency of the NHS to mitigate the cost of damages from sea level rise, extreme weather events, flooding, wildfires, or other natural disasters.

Funding: Varies, generally Federal - 80%, State – 20%, but for the Interstate
System, Federal - 90%, State – 10%

Railway-Highway Crossings Program ((RHCP) (continued in the BIL)) provides funds for safety improvements to reduce the number of fatalities, injuries, and crashes at public railway-highway grade crossings

Funding: Federal = 100% in the BIL, was Federal- 80%, State- 20% under FAST Act

RAISE Grants Local and Regional Project Assistance Grants (RAISE) (continued in the BIL)) provides supplemental funding for projects that will have significant local/regional impact.

Funding: Federal - 80%, State/Local – 20%,
Funding: Federal – 100% in rural areas, historically disadvantaged communities and areas of persistent poverty

Rural Surface Transportation Grant Program (RURAL) (new in the BIL)) funds highway, bridge and tunnel projects that improve freight, safety and improve access to improve local rural economies.

Funding: Federal - 80%, State/Local – 20%

Safe Streets and Roads for All (SS4A) (new in the BIL)) discretionary funding to support regional, local and Tribal initiatives to prevent roadway deaths and serious injuries.

Funding: Federal - 80%, State/Local – 20%
Draft FFYs 2023-2027 MVMPO TIP April 2022 75

Surface Transportation Block Grant Program ((STBG) (continued in the BIL)) funding for any Federal-aid highway, bridge and tunnel projects on any public road, pedestrian and bicycle infrastructure, and transit capital projects, including intercity bus terminals.

Funding: Federal- 80%, State- 20%

Transportation Alternatives ((TA) (continued in the BIL)) is a set aside of STBG funds for projects which can be defined as transportation alternatives including bicycle and pedestrian facilities, recreational trails, safe routes to school projects, community improvements, such as historic preservation and vegetation management, and environmental mitigations related to stormwater and habitat connectivity.

Funding: Federal- 80%, State- 20%

Non-Federal Aid (NFA) - funds construction, reconstruction, and improvement projects on roads and bridges in urban and rural areas.

Funding: State- 100% (Transportation Bond Bill), or Private - 100%

Next Generation Bridge Program (NGBP)- Non-Federal Aid Massachusetts Transportation

Bond Bill funds for bridges.
Funding: State- 100% (Transportation Bond Bill)
Draft FFYs 2023-2027 MVMPO TIP April 2022 76

Transit Projects

The Merrimack Valley Regional Transit Authority (MVRTA) provides local and intercity
fixed-route bus service, paratransit service for seniors and persons with disabilities, flexible Ring and Ride service is provided in some communities with no fixed route service, commuter service to Boston, weekday employment bus route from Lawrence to major employers of Raytheon and IRS, and one seasonal bus route to Salisbury and Hampton beaches.
Prior to the COVID-19 Pandemic, in FY 2019 (July 1, 2018 to June 30, 2019) the MVRTA fixed route services’ ridership was over 1.9 million, with an additional 44,040 passengers on special routes. EZ Trans paratransit ridership was 60,397 ADA and 6,817 Non-ADA. The commuter buses to Boston carried 60,822 passengers and Ring and Ride provided service to 10,868 passengers, for a total of nearly 2.08 million rides provided by MVRTA in FY 2019.
The MVRTA went fare-free on March 1, 2022, a two-year pilot program on all fixed route and EZ Trans paratransit services. The Boston Commuter bus still has fares, but it is included in a MassDOT two-year pilot program that allows the buses to ride in the shoulder lane on I-93 between I-95 in Woburn and the HOV lane in Somerville between 6 am and 10 am southbound and between 3 pm and 7 pm northbound when the travel speeds in the other lanes are below 35 miles per hour.
Federal, State and local subsidies provide the majority of the funding for the MVRTA, for both capital and operating expenses. Any Federal funding and its match, generally State funding, is required to be listed in this TIP.
The projects in the FFYs 2023 -2027 TIP are slated to use funding from the following Federal-aid funding programs identified in the Bipartisan Infrastructure Law (BIL), enacted as the Infrastructure Investment and Jobs Act Pub. L. 117-58 (November 15, 2021). Projects may also receive non-Federal Aid funding which is shown in the project listings.
State funding for the MVRTA's operating budget is provided through an agreement with the Transit Division of MassDOT. Local funds are derived from community assessments based on the number of route miles and special services operated within each community.
The Merrimack Valley Planning Commission will provide the 20% match for the planning activities it will conduct for the Merrimack Valley Regional Transit Authority under its Section 5307 transit planning contract with the Authority.
Draft FFYs 2023-2027 MVMPO TIP April 2022 77

Federal Transit Funding

Section 5307 Capital and Planning Urbanized Area Formula Program ((Section 5307) (continued in the BIL)) funds routine transit capital and operating assistance, and planning assistance in urbanized areas, job access and reverse commute projects. This is an urban formula grant program for MVRTA Preventative Maintenance and ADA costs.

Funding: Federal - 80%, State - 20% (Bond Issue Funds)
Funding: Federal - 50%, State - 50% (Bond Issue Funds) for Operating Assistance

Section 5310 Enhanced Mobility of Seniors and Individuals with Disabilities Formula Grant Program ((Section 5310) (continued in the BIL) provides funds, through the State, to private non-profit corporations and organizations to assist them in providing transportation services to meet the special transportation needs of seniors and individuals with disabilities.

Funding: Federal - 80%, Funding Applicant - 20%

Section 5339 Buses and Bus Facilities Urbanized Area Formula Program and Competitive Grants ((Section 5339) (continued in the BIL)) provides capital funds, through the State, for bus and bus related equipment and facilities.

Funding: Federal - 80%, Funding Applicant - 20%

Section 5307 (h) Passenger Ferry Grant Program ((Section 5307(h)) (continued in the BIL))

provides competitive funding for projects that support passenger ferry service in urbanized areas.
Funding: Federal - 80%, State - 20%

State Transit Funding

Mobility Assistance Program (MAP) helps fund transportation services for seniors and peo- ple with disabilities.

Operating Assistance

State Contract Assistance (SCA) annual State funding which can be used for Federal oper- ating expenses and as part of the match for Federal transit operating funding programs.

State Capital Assistance

Regional Transit Authority Capital Assistance Program (RTACAP) annual State funding which can be used to provide the match for Federal transit capital funding programs.
Draft FFYs 2023-2027 MVMPO TIP April 2022 78

Organization of Project Listings – Highway Projects

The TIP includes sections that identify the MPO’s priority road and bridge projects using a format prescribed by MassDOT’s Office of Transportation Planning. MassDOT is aligning the FFYs 2023 to 2027 Statewide Transportation Improvement Program (STIP) with the MassDOT Capital Investment Plan (CIP). The CIP identifies three capital planning priorities: reliability, modernization and expansion investments. The STIP will now align program names with CIP investment priorities as follows:
Reliability

Bridge program (including investments in inspections, systematic maintenance, on- system NHS bridges, on-system non-NHS bridges, and off-system bridges)

Interstate pavement program

Non-Interstate DOT pavement program

Roadway improvements program

Safety improvements program

Modernization

ADA retrofits program

Intersection improvements program

Intelligent Transportation Systems program

Roadway reconstruction program

Expansion

Bicycles and Pedestrians program

Capacity program

For the FFYs 2023 to 2027 TIP, the Regional Target funding amounts, distributed via statewide formula to the regions across the state, are initially programmed by the regions as STBG (also known as STP) funding category projects and MassDOT will inform regions if projects are to be partitioned by the HSIP, CMAQ and TAP categories.

Section 1A / Regionally Prioritized Projects

Federal-Aid STBG Projects Using MVMPO Target Authority (STBG)

Federal-Aid HSIP Projects Using MVMPO Target (HSIP)

Federal-Aid CMAQ Projects Using MVMPO Target (CMAQ)

Federal-Aid TAP (now set aside of STBG funding) Projects Using MVMPO Target

(TAP)
Draft FFYs 2023-2027 MVMPO TIP April 2022 79

Section 1B / Earmark or Discretionary Grant Funded Projects (Provided by MassDOT)

Federal-Aid Earmark or Discretionary Grant Funded Projects

Section 2A / State Prioritized Reliability Projects (Provided by MassDOT)

Bridge Program / Inspections

Bridge Program / Off-System

Bridge Program / On-System (NHS)

Bridge Program / On-System (Non-NHS)

Bridge Program / Systematic Maintenance

Interstate Pavement

Non-Interstate Pavement

Roadway Improvements

Safety Improvements

Section 2B / State Prioritized Modernization Projects (Provided by MassDOT)

ADA Retrofits

Intersection Improvements

Intelligent Transportation Systems

Roadway Reconstruction

Section 2C / State Prioritized Expansion Projects (Provided by MassDOT)

Bicycles and Pedestrians

Capacity

Section 3 / Planning / Adjustments / Pass-throughs (Provided by MassDOT)

Planning / Adjustments / Pass-throughs

Section 4 / Non-Federally Aided Projects (Provided by MassDOT)

Non-Federal Aid

Draft FFYs 2023-2027 MVMPO TIP April 2022 80
Each highway project in the TIP contains the following information:

Amendment/Adjustment Type– used to identify the type of amendment when changes are made to the document.

STIP Program– STIP program names as defined in the Organization of Highway Project

Listings section above.

Year– Federal Fiscal Year in which the project is programmed.

MassDOT Project ID- project identification numbers given by MassDOT for each highway and bridge project.

MPO– identifies the Metropolitan Planning Organization within which the project is located.

Municipality– identifies the community where the project is located.

MassDOT Project Description–includes the community, or communities, in which the project is located and a brief description of work to be funded under the project. This description is exactly the same as MassDOT has input to its project information pages.

Funding Source- abbreviation for the funding category from which funding is expected. (Funding categories and abbreviations are explained at the beginning of Part A.8.).

Adjusted TFPC- the 2023 Total Federal Participating Cost adjusted for inflation by 4% for projects that start in 2024; 8% for projects that start in 2025; 12% for projects that start in

2026 and 16% for projects that start in 2027.

Total Programmed Funds- estimated cost of project in Fiscal Year in which advertising is expected*.

Federal Funds– portion of Total Programmed Funds provided by Federal Funding.

Non-Federal Funds– portion of Total Programmed Funds not provided by Federal Funding, but required as matching funds in order to receive Federal Funds.

Other Information- a) Planning / Design / Construction; b) total project cost and funding sources used; c) advance construction status; d) MPO project score; e) name of entity receiving a transfer; f) name of entity paying the non-State Non-Federal match; g) earmark details; h) TAP project proponent; i) other information.

* Inflation increases project costs and therefore the project costs have been increased by

4% each future year of the TIP.

Draft FFYs 2023-2027 MVMPO TIP April 2022 81

Organization of Project Listings – Transit Projects

Each transit project in the TIP contains the following information: Division ID – Transit Project ID from MassDOT

Project Title – project title from MassDOT

Total – estimated total cost of project.

Bond Cap | State | 100% State– portion of Total Programmed Funds not provided by Federal Funding, but required as matching funds for in order to receive Federal Funds, coming from Massachusetts Transportation Bond Bill.

Bond Cap | Match | Federal Transit Discretionary Grant– portion of Total Programmed Funds not provided by Federal Funding, but required as matching funds for Federal Transit Discretionary Grant, in order to receive Federal Funds, coming from the Massachusetts Transportation Bond Bill.

Federal | FTA | Section 5307– Portion of Total Programmed Funds provided by Federal

FTA Section 5307 Funding.

Federal | FTA | Other Federal Transit– Portion of Total Programmed Funds provided by

Federal FTA Funding other than Section 5307 or a Discretionary Grant.

Federal | FTA | Federal Transit Discretionary Grant– Portion of Total Programmed Funds provided by Federal FTA Discretionary Grant.

Operating | Additional State Assistance | State Contract Assistance– portion of Total Programmed Funds not provided by Federal Funding, but required as matching funds for in order to receive Federal Funds, coming from State funding sources.

Other | Municipal and Local | Transit– portion of Total Programmed Funds not provided by

Federal Funding but required as matching funds in order to receive Federal Funds, coming from local funding sources other than State funding sources.
Draft FFYs 2023-2027 MVMPO TIP April 2022 82

Part B. Project Listings

Highway Projects

Draft FFYs 2023-2027 MVMPO TIP April 2022 83

STIP Investments Report

Merrimack Valley Region

STIP: 2023 - 2027 (D)

Total

Year MassDOT MPO Municipality MassDOT Project Description Funding Adjusted Programmed Federal Funds Non-Federal Other Information

Project ID Source TFPC Funds Funds

Federal Fiscal Year 2023

$95,373,638

$76,298,910

$19,074,728

Section 1A / Regionally Prioritized Projects $13,293,829 $10,635,063 $2,658,766

Roadway Reconstruction $13,293,829 $10,635,063 $2,658,766

2023

602202

Merrimack

Valley

Salisbury

SALISBURY- RECONSTRUCTION OF ROUTE 1 (LAFAYETTE ROAD)

STBG

$19,266,283

$13,293,829

$10,635,063

$2,658,766

a) Construction; b) $19,266,283 STBG; c) AC Year 1-2 FFY 2023-2024 d) TEC = 11.72 out of

18.

Section 2A / State Prioritized Reliability Projects $82,079,809 $65,663,847 $16,415,962

Bridge On-system NHS $80,749,024 $64,599,219 $16,149,805

2023

606522

Merrimack

Valley

Andover

ANDOVER- BRIDGE REHABILITATION, A-09-036, I-

495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

NHPP

$173,075,000

$80,749,024

$64,599,219

$16,149,805

Project ACd over 2023-2026

Safety Improvements $1,330,785 $1,064,628 $266,157

2023

609392

Merrimack

Valley

Rowley

ROWLEY- SAFETY IMPROVEMENTS AT ROUTE 1, CENTRAL AND GLEN STREETS

NHPP

$1,330,785

$1,330,785

$1,064,628

$266,157

a) Construction; b) $1,330,785 NHPP d) TEC =

6.5 out of 18.

Draft FFYs 2023-2027 MVMPO TIP April 2022 84

STIP Investments Report

Merrimack Valley Region

STIP: 2023 - 2027 (D)

Total

Year MassDOT MPO Municipality MassDOT Project Description Funding Adjusted Programmed Federal Funds Non-Federal Other Information

Project ID Source TFPC Funds Funds

Federal Fiscal Year 2024

$127,006,795

$103,211,167

$23,795,628

Section 1A / Regionally Prioritized Projects $13,468,779 $10,775,023 $2,693,756

Roadway Reconstruction $11,404,890 $9,123,912 $2,280,978

2024

602202

Merrimack

Valley

Salisbury

SALISBURY- RECONSTRUCTION OF ROUTE 1 (LAFAYETTE ROAD)

STBG

$19,266,283

$5,972,454

$4,777,963

$1,194,491

a) Construction; b) $19,266,283 STBG; c) AC Year 1-2 FFY 2023-2024 d) TEC = 11.72 out of

18.

2024

608095

Merrimack

Valley

North Andover

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN WAVERLY ROAD & WILLOW/MILL STREET

STBG

$34,083,859

$5,432,436

$4,345,949

$1,086,487

a) Construction; b) $34,083,859 STBG (inflated

4% from 2023 cost) = FFY 2024 ($5,495,380) + FFY 2025 ($13,239,974) + FFY 2026 ($12,916,056) + FFY 2027 ($2,432,449) c) AC years 1-4 FFY 2024-2027; d) TEC = 12.42 out

of 18.

Intersection Improvements $2,063,889 $1,651,111 $412,778

2024

610658

Merrimack

Valley

Methuen

METHUEN- INTERSECTION IMPROVEMENTS AT RIVERSIDE DRIVE AND BURNHAM ROAD

STBG

$2,063,889

$2,063,889

$1,651,111

$412,778

a) Construction; b) $2,000,945 STBG (inflated

4% from 2023 cost) d) TEC = 7.87 out of 18.

Section 1B / Earmark or Discretionary Grant Funded Projects $8,028,654 $8,028,654 $0

Earmark Discretionary $8,028,654 $8,028,654 $0

2024

610924

Merrimack

Valley

Lawrence

LAWRENCE- ROADWAY RECONSTRUCTION ON AMESBURY STREET

CRRSAA

$8,028,654

$8,028,654

$8,028,654

$0

a) Construction; b) $8,028,654 (inflated 4%

from 2023 cost) d) TEC = 11.15 out of 18.

Section 2A / State Prioritized Reliability Projects $101,988,926 $81,591,141 $20,397,785

Bridge On-system NHS $101,988,926 $81,591,141 $20,397,785

2024

605304

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-007 & H-12-025, BRIDGE STREET (SR 125) OVER THE MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY)

NHPP

$108,011,904

$20,600,000

$16,480,000

$4,120,000

Project ACd over 2024-2027

2024

606522

Merrimack

Valley

Andover

ANDOVER- BRIDGE REHABILITATION, A-09-036, I-

495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

NHPP

$173,075,000

$60,000,000

$48,000,000

$12,000,000

Project ACd over 2023-2026

2024

609466

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-040, I-

495 (NB & SB) OVER MERRIMACK RIVER

NHPP

$96,087,420

$21,388,926

$17,111,141

$4,277,785

Project ACd over 2024-2027

Draft FFYs 2023-2027 MVMPO TIP April 2022 85

STIP Investments Report

Merrimack Valley Region

STIP: 2023 - 2027 (D)

Total

Year MassDOT MPO Municipality MassDOT Project Description Funding Adjusted Programmed Federal Funds Non-Federal Other Information

Project ID Source TFPC Funds Funds

Federal Fiscal Year 2024 (Cont.)

Section 2C / State Prioritized Expansion Projects $3,520,436 $2,816,349 $704,087

Bicycle and Pedestrian $3,520,436 $2,816,349 $704,087

2024

607541

Merrimack

Valley

Multiple

GEORGETOWN- BOXFORD- BORDER TO BOSTON TRAIL, FROM GEORGETOWN ROAD TO WEST MAIN STREET (ROUTE 97)

CMAQ

$2,520,436

$2,520,436

$2,016,349

$504,087

a) Construction; b) $2,520,436 CMAQ (inflated

4% from 2023 cost) d) TEC = 7.2 out of 18.

2024

608930

Merrimack

Valley

Lawrence

LAWRENCE- LAWRENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL

CMAQ

$21,416,304

$1,000,000

$800,000

$200,000

a) Construction; b) $21,416,304 CMAQ (inflated

4% from 2023 cost); c) AC Year 1-2 FFY 2024-

2025: d) TEC = 11.25 out of 18.

Draft FFYs 2023-2027 MVMPO TIP April 2022 86

STIP Investments Report

Merrimack Valley Region

STIP: 2023 - 2027 (D)

Total

Year MassDOT MPO Municipality MassDOT Project Description Funding Adjusted TFPC Programmed Federal Funds Non-Federal Other Information

Project ID Source Funds Funds

Federal Fiscal Year 2025

$196,859,453

$111,272,489

$85,586,964

Section 1A / Regionally Prioritized Projects $13,239,974 $10,591,979 $2,647,995

Roadway Reconstruction $13,239,974 $10,591,979 $2,647,995

2025

608095

Merrimack

Valley

North Andover

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETW EEN W AVERLY ROAD & W ILLOW /MILL STREET

STBG

$34,083,859

$13,239,974

$10,591,979

$2,647,995

a) Construction; b) $34,083,859 STBG (inflated 4% from 2023 cost) = FFY 2024 ($5,495,380) + FFY 2025 ($13,239,974) + FFY 2026 ($12,916,056) + FFY 2027

($2,432,449) c) AC years 1-4 FFY 2024-2027;

d) TEC = 12.42 out of 18.

Section 2A / State Prioritized Reliability Projects $101,564,473 $83,104,098 $18,460,375

Bridge On-system NHS $83,039,276 $66,431,421 $16,607,855

2025

605304

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-007 & H-12-025, BRIDGE STREET (SR 125) OVER THE MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEW AY)

NHPP

$108,011,904

$30,900,000

$24,720,000

$6,180,000

Project ACd over 2024-2027

2025

606522

Merrimack

Valley

Andover

ANDOVER- BRIDGE REHABILITATION, A-09-036, I-

495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

NHPP

$173,075,000

$12,325,976

$9,860,781

$2,465,195

Project ACd over 2023-2026

2025

609466

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-040, I-

495 (NB & SB) OVER MERRIMACK RIVER

NHPP

$96,087,420

$39,813,300

$31,850,640

$7,962,660

Project ACd over 2024-2027

Interstate Pavement $18,525,197 $16,672,677 $1,852,520

2025

612045

Merrimack

Valley

Andover

ANDOVER- TEW KSBURY- INTERSTATE MAINTENANCE AND RELATED W ORKS ON I-93

NHPP-I

$18,525,197

$18,525,197

$16,672,677

$1,852,520

Section 2B / State Prioritized Modernization Projects $1,554,211 $1,243,369 $310,842

Roadway Reconstruction $1,554,211 $1,243,369 $310,842

2025

612002

Merrimack

Valley

Lawrence

LAW RENCE- COMMUNITY DAY ARLINGTON IMPROVEMENTS (SRTS)

TAP

$1,554,211

$1,554,211

$1,243,369

$310,842

a) Construction; b) $1,554,211 TAP (inflated

8% from 2023 cost).

Section 2C / State Prioritized Expansion Projects $20,416,304 $16,333,043 $4,083,261

Bicycle and Pedestrian $20,416,304 $16,333,043 $4,083,261

2025

608930

Merrimack

Valley

Lawrence

LAW RENCE- LAW RENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL

CMAQ

$21,416,304

$20,416,304

$16,333,043

$4,083,261

a) Construction; b) $21,416,304 CMAQ (inflated 4% from 2023 cost); c) AC Year 1-2

FFY 2024-2025: d) TEC = 11.25 out of 18.

Draft FFYs 2023-2027 MVMPO TIP April 2022 87

STIP Investments Report

Merrimack Valley Region

STIP: 2023 - 2027 (D)

Total

Year MassDOT MPO Municipality MassDOT Project Description Funding Adjusted TFPC Programmed Federal Funds Non-Federal Other Information

Project ID Source Funds Funds

Federal Fiscal Year 2025 (Cont.)

Section 3B / Non-Federal Aid Funded $60,084,491 $0 $60,084,491

Bridge On-system Non-NHS $17,383,839 $0 $17,383,839

2025

612143

Merrimack

Valley

Andover

ANDOVER- BRIDGE REPLACEMENT, A-09-015, TEW KSBURY STREET OVER MBTA/BMRR

NGBP

$17,383,839

$17,383,839

$0

$17,383,839

Bridge On-system NHS $42,700,652 $0 $42,700,652

2025

612158

Merrimack

Valley

Methuen

METHUEN- BRIDGE REPLACEMENT, M-17-026, ROUTE 213 EB/W B OVER THE METHUEN RAIL TRAIL

NGBP

$4,598,252

$4,598,252

$0

$4,598,252

2025

612193

Merrimack

Valley

Andover

ANDOVER- BRIDGE PRESERVATION, A-09-022, I-

93 OVER MERRIMACK RIVER

NGBP

$38,102,400

$38,102,400

$0

$38,102,400

Draft FFYs 2023-2027 MVMPO TIP April 2022 88

STIP Investments Report

Merrimack Valley Region

STIP: 2023 - 2027 (D)

Total

Year MassDOT MPO Municipality MassDOT Project Description Funding Adjusted TFPC Programmed Federal Funds Non-Federal Other Information

Project ID Source Funds Funds

Federal Fiscal Year 2026

$94,342,335

$75,473,868

$18,868,467

Section 1A / Regionally Prioritized Projects $12,916,056 $10,332,845 $2,583,211

Roadway Reconstruction $12,916,056 $10,332,845 $2,583,211

2026

608095

Merrimack

Valley

North Andover

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETW EEN W AVERLY ROAD & W ILLOW /MILL STREET

STBG

$34,083,859

$12,916,056

$10,332,845

$2,583,211

a) Construction; b) $34,083,859 STBG (inflated 4% from 2023 cost) = FFY 2024 ($5,495,380) + FFY 2025 ($13,239,974) + FFY 2026 ($12,916,056) + FFY 2027

($2,432,449) c) AC years 1-4 FFY 2024-2027;

d) TEC = 12.42 out of 18.

Section 2A / State Prioritized Reliability Projects $72,770,199 $58,216,159 $14,554,040

Bridge On-system NHS $69,485,194 $55,588,155 $13,897,039

2026

605304

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-007 & H-12-025, BRIDGE STREET (SR 125) OVER THE MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEW AY)

NHPP

$108,011,904

$30,600,000

$24,480,000

$6,120,000

Project ACd over 2024-2027

2026

606522

Merrimack

Valley

Andover

ANDOVER- BRIDGE REHABILITATION, A-09-036, I-

495 OVER ST 28 (SB), A-09-037, I-495 OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

NHPP

$173,075,000

$20,000,000

$16,000,000

$4,000,000

Project ACd over 2023-2026

2026

609466

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-040, I-

495 (NB & SB) OVER MERRIMACK RIVER

NHPP

$96,087,420

$18,885,194

$15,108,155

$3,777,039

Project ACd over 2024-2027

Bridge Off-system $3,285,005 $2,628,004 $657,001

2026

612074

Merrimack

Valley

Lawrence

LAW RENCE- BRIDGE REPLACEMENT, L-04-012, SHORT STREET OVER SPICKET RIVER

STBG-BR- Off

$3,285,005

$3,285,005

$2,628,004

$657,001

Section 2B / State Prioritized Modernization Projects $1,858,080 $1,486,464 $371,616

Roadway Reconstruction $1,858,080 $1,486,464 $371,616

2026

S12208

Merrimack

Valley

GROVELAND - IMPROVEMENTS AT DR. ELMER BAGNALL ELEMENTARY SCHOOL (SRTS)

TAP

$1,858,080

$1,858,080

$1,486,464

$371,616

SRTS infrastructure project awarded in 2022. To be updated with project ID once approved by PRC. 12% inflation applied for FFY 2026.

Section 2C / State Prioritized Expansion Projects $6,798,000 $5,438,400 $1,359,600

Bicycle and Pedestrian $6,798,000 $5,438,400 $1,359,600

2026

607542

Merrimack

Valley

Multiple

GEORGETOW N- NEW BURY- BORDER TO BOSTON TRAIL (NORTHERN GEORGETOW N TO BYFIELD SECTION)

CMAQ

$6,798,000

$6,798,000

$5,438,400

$1,359,600

a) Construction; b) $6,798,000 CMAQ (inflated

12% from 2023 cost) d) TEC = 6.82 out of 18.

Draft FFYs 2023-2027 MVMPO TIP April 2022 89

STIP Investments Report

Merrimack Valley Region

STIP: 2023 - 2027 (D)

Total

Year MassDOT MPO Municipality MassDOT Project Description Funding Adjusted TFPC Programmed Federal Funds Non-Federal Other Information

Project ID Source Funds Funds

Federal Fiscal Year 2027

$55,524,827

$44,419,862

$11,104,965

Section 1A / Regionally Prioritized Projects $13,612,923 $10,890,338 $2,722,585

Roadway Reconstruction $11,164,163 $8,931,330 $2,232,833

2027

608029

Merrimack

Valley

Newburyport

NEW BURYPORT- INTERSECTION IMPROVEMENTS @ ROUTE 1 & MERRIMAC STREET

STBG

$2,870,513

$2,870,513

$2,296,410

$574,103

a) Construction; b) $2,870,513 STBG (inflated

16% from 2023 cost) d) TEC = 8.37 out of 18.

2027

608095

Merrimack

Valley

North Andover

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETW EEN W AVERLY ROAD & W ILLOW /MILL STREET

STBG

$34,083,859

$2,495,393

$1,996,314

$499,079

a) Construction; b) $34,083,859 STBG (inflated 4% from 2023 cost) = FFY 2024 ($5,495,380) + FFY 2025 ($13,239,974) + FFY 2026 ($12,916,056) + FFY 2027

($2,432,449) c) AC years 1-4 FFY 2024-2027;

d) TEC = 12.42 out of 18.

2027

608788

Merrimack

Valley

Haverhill

HAVERHILL- ROADW AY RECONSTRUCTION ON NORTH AVENUE, FROM MAIN STREET (ROUTE

125) TO PLAISTOW NH

STBG

$23,600,997

$5,798,257

$4,638,606

$1,159,651

a) Construction; b) $23,600,997 STBG (inflated 16% from 2023 cost) = FFY 2027 ($5,861,201) + FFYs beyond; c) AC years 1-3

FFY 2027-2029; d) TEC = 8.58 out of 18.

Bicycle and Pedestrian $2,448,760 $1,959,008 $489,752

2027

611977

Merrimack

Valley

Amesbury

AMESBURY- RIVERW ALK CONNECTOR TO THE SALISBURY POINT GHOST TRAIL

STBG

$2,448,760

$2,448,760

$1,959,008

$489,752

a) Construction; b) $2,448,760 STBG (inflated

16% from 2023 cost) d) TEC = 6.85 out of 18.

Section 2A / State Prioritized Reliability Projects $41,911,904 $33,529,523 $8,382,381

Bridge On-system NHS $41,911,904 $33,529,523 $8,382,381

2027

605304

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-007 & H-12-025, BRIDGE STREET (SR 125) OVER THE MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEW AY)

NHPP

$108,011,904

$25,911,904

$20,729,523

$5,182,381

Project ACd over 2024-2027

2027

609466

Merrimack

Valley

Haverhill

HAVERHILL- BRIDGE REPLACEMENT, H-12-040, I-

495 (NB & SB) OVER MERRIMACK RIVER

NHPP

$96,087,420

$16,000,000

$12,800,000

$3,200,000

Project ACd over 2024-2027

Draft FFYs 2023-2027 MVMPO TIP April 2022 90

Part B. Project Listings (Cont.)

Transit Projects

Draft FFYs 2023-2027 MVMPO TIP April 2022 91

Merrimack Valley MPO Draft 2023 to 2027 Transportation Improvement Program

Transit Projects List

Division ID

Project Title

Total

Bond Cap | State |

100% State

Bond Cap | Match | Federal Transit Discretionary Grant

Federal | FTA | Section 5307

Federal | FTA | Other Federal Transit

Federal | FTA | Federal Transit Discretionary Grant

Operating | Additional State Assistance | State Contract Assistance

Other | Municipal and Local | Transit

FFY 2023 Transit Federal‐Aid

RTD0010747

MVRTA ‐ Preventative Maintenance for service

$3,730,510

$0

$0

$2,984,410

$0

$0

$746,100

$0

RTD0010748

MVRTA ‐ Operating Assistance for Service

$1,478,730

$0

$0

$739,365

$0

$0

$739,365

$0

RTD0010749

MVRTA ‐ ADA Paratransit Service

$1,861,090

$0

$0

$1,488,870

$0

$0

$372,220

$0

RTD0010750

MVRTA ‐ Replace 8 Model Yr 2011 35' buses delivery 2023

$4,384,400

$876,880

$0

$3,507,520

$0

$0

$0

$0

RTD0010751

MVRTA ‐ Replace 6 model yr 2017 Type E‐2 vans delivery 2023

$469,620

$234,810

$0

$234,810

$0

$0

$0

$0

RTD0010752

Merrimack Valley MPO Short Range Transit Planning

$100,000

$0

$0

$80,000

$0

$0

$0

$20,000

RTD0010758

MVRTA ‐ Replace 1 Model Year 2017 Supervisory Vehicle

$50,335

$10,070

$0

$40,265

$0

$0

$0

$0

RTD0011300

MVRTA ‐ BUY REPLACEMENT VAN

$469,620

$234,810

$0

$234,810

$0

$0

$0

$0

RTD0011301

MVRTA ‐ METROPOLITAN PLANNING

$65,000

$13,000

$0

$52,000

$0

$0

$0

$0

RTD0011304

MVRTA‐ BUY REPLACEMENTS ‐ CAPITOL BUS

$2,983,200

$596,640

$0

$2,386,560

$0

$0

$0

$0

RTD0011305

MVRTA ‐ BUY REPLACEMENTS ‐ CAPITOL BUS

$1,401,200

$280,240

$0

$1,120,960

$0

$0

$0

$0

RTD0011306

MVRTA‐ REHAB/RENOVATE ‐ MISC EQUIPMENT

$1,700,000

$340,000

$0

$1,360,000

$0

$0

$0

$0

RTD0011307

MVRTA‐ ENG/DESIGN ‐ ADMIN/MAINT FACILITY

$800,000

$160,000

$0

$640,000

$0

$0

$0

$0

RTDTBD13

MVRTA ‐ 5339 Bus & Bus Facility Discretionary: Improvements to the

McGovern Transportation Center

$1,200,000

$0

$240,000

$0

$0

$960,000

$0

$0

FFY 2023 Federal Aid Totals

$20,693,705

$2,746,450

$240,000

$14,869,570

$0

$960,000

$1,857,685

$20,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 92

Merrimack Valley MPO Draft 2023 to 2027 Transportation Improvement Program

Transit Projects List

Division ID

Project Title

Total

Bond Cap | State |

100% State

Bond Cap | Match | Federal Transit Discretionary Grant

Federal | FTA | Section 5307

Federal | FTA | Other Federal Transit

Federal | FTA | Federal Transit Discretionary Grant

Operating | Additional State Assistance | State Contract Assistance

Other | Municipal and Local | Transit

FFY 2024 Transit Federal‐Aid

RTD0010753

MVRTA ‐ Replace 8 model yr 2012 35' buses delivery 2024 8 of 8

$4,703,200

$2,351,600

$0

$2,351,600

$0

$0

$0

$0

RTD0010754

MVRTA ‐ Preventative Maintenance for service

$3,618,265

$0

$0

$2,894,615

$0

$0

$723,650

$0

RTD0010755

MVRTA ‐ Operating Assistance for Service

$1,429,680

$0

$0

$714,840

$0

$0

$714,840

$0

RTD0010756

MVRTA ‐ ADA paratransit service service

$1,963,500

$0

$0

$1,570,800

$0

$0

$392,700

$0

RTD0010757

Merrimack Valley MPO Short Range Transit Planning

$100,000

$0

$0

$80,000

$0

$0

$0

$20,000

RTD0010759

MVRTA ‐ Replace 1 Model Year 2018 Supervisory Vehicle

$51,845

$10,370

$0

$41,475

$0

$0

$0

$0

RTD0011302

MVRTA ‐ METROPOLITAN PLANNING

$65,000

$13,000

$0

$52,000

$0

$0

$0

$0

RTD0011308

MVRTA ‐ ENG/DESIGN ‐ ADMIN/MAINT FACILITY

$1,250,000

$250,000

$0

$1,000,000

$0

$0

$0

$0

RTD0011309

MVRTA ‐ CONSTRUCT ADMIN/MAINT FACILITY

$10,950,000

$2,190,000

$0

$8,760,000

$0

$0

$0

$0

RTDTBD14

MVRTA ‐ 5339 Bus & Bus Facility Discretionary: Expansion of MVRTA Bus

Maintenance Facility & Possible New Bus Hub at Bradford CR Station

$4,800,000

$0

$960,000

$0

$0

$3,840,000

$0

$0

RTDTBD15

MVRTA ‐ 5307(h)Passenger Ferry Grant Discretionary Program: Capital

costs for launch of Merrimack River ferryboat service between Haverhill and Newburyport

$750,000

$0

$150,000

$0

$0

$600,000

$0

$0

FFY 2024 Federal Aid Totals

$29,681,490

$4,814,970

$1,110,000

$17,465,330

$0

$4,440,000

$1,831,190

$20,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 93

Merrimack Valley MPO Draft 2023 to 2027 Transportation Improvement Program

Transit Projects List

Division ID

Project Title

Total

Bond Cap | State |

100% State

Bond Cap | Match | Federal Transit Discretionary Grant

Federal | FTA | Section 5307

Federal | FTA | Other Federal Transit

Federal | FTA | Federal Transit Discretionary Grant

Operating | Additional State Assistance | State Contract Assistance

Other | Municipal and Local | Transit

FFY 2025 Transit Federal‐Aid

RTD0010760

Merrimack Valley MPO Short Range Transit Planning

$100,000

$0

$0

$80,000

$0

$0

$0

$20,000

RTD0010761

MVRTA ‐ Preventative Maintenance for service

$3,690,630

$0

$0

$2,952,505

$0

$0

$738,125

$0

RTD0010762

MVRTA ‐ Operating Assistance for Service

$1,458,270

$0

$0

$729,135

$0

$0

$729,135

$0

RTD0010763

MVRTA ‐ ADA Paratransit Service

$2,071,500

$0

$0

$1,657,200

$0

$0

$414,300

$0

RTD0010764

MVRTA ‐ Replace 1 Model Year 2019 Supervissory Vehicle

$53,400

$10,680

$0

$42,720

$0

$0

$0

$0

RTD0011303

MVRTA ‐ METROPOLITAN PLANNING

$65,000

$13,000

$0

$52,000

$0

$0

$0

$0

RTD0011317

MVRTA ‐ CONSTRUCT ‐ MISC EQUIPMENT

$625,000

$125,000

$0

$500,000

$0

$0

$0

$0

FFY 2025 Federal Aid Totals

$8,063,800

$148,680

$0

$6,013,560

$0

$0

$1,881,560

$20,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 94

Merrimack Valley MPO Draft 2023 to 2027 Transportation Improvement Program

Transit Projects List

Division ID

Project Title

Total

Bond Cap | State |

100% State

Bond Cap | Match | Federal Transit Discretionary Grant

Federal | FTA | Section 5307

Federal | FTA | Other Federal Transit

Federal | FTA | Federal Transit Discretionary Grant

Operating | Additional State Assistance | State Contract Assistance

Other | Municipal and Local | Transit

FFY 2026 Transit Federal‐Aid

RTD0010765

MVRTA ‐ Preventative Maintenance for service

$3,810,350

$0

$0

$3,041,080

$0

$0

$769,270

$0

RTD0010766

MVRTA ‐ ADA Paratransit Service

$2,185,500

$0

$0

$1,748,400

$0

$0

$437,100

$0

RTD0010767

Merrimack Valley MPO Short Range Transit Planning

$100,000

$0

$0

$80,000

$0

$0

$0

$20,000

RTD0010768

MVRTA ‐ Operating Assistance for Service

$1,502,020

$0

$0

$751,010

$0

$0

$751,010

$0

RTD0010769

MVRTA ‐ Replace 1 Model Yr 2020 Supervisory Vehicle

$55,000

$11,000

$0

$44,000

$0

$0

$0

$0

FFY 2026 Federal Aid Totals

$7,652,870

$11,000

$0

$5,664,490

$0

$0

$1,957,380

$20,000

FFY 2026 Transit Non‐Federal Aid

RTD0011318

MVRTA ‐ CONSTRUCT ‐ MISC EQUIPMENT

$125,000

$125,000

$0

$0

$0

$0

$0

$0

Draft FFYs 2023-2027 MVMPO TIP April 2022 95

Merrimack Valley MPO Draft 2023 to 2027 Transportation Improvement Program

Transit Projects List

Division ID

Project Title

Total

Bond Cap | State |

100% State

Bond Cap | Match | Federal Transit Discretionary Grant

Federal | FTA | Section 5307

Federal | FTA | Other Federal Transit

Federal | FTA | Federal Transit Discretionary Grant

Operating | Additional State Assistance | State Contract Assistance

Other | Municipal and Local | Transit

FFY 2027 Transit Federal‐Aid

RTD0011311

MVRTA‐ OPERATING ASSISTANCE

$1,585,000

$0

$0

$792,500

$0

$0

$792,500

$0

RTD0011312

MVRTA ‐ PREVENTIVE MAINTENANCE

$2,500,000

$500,000

$0

$2,000,000

$0

$0

$0

$0

RTD0011313

MVRTA‐ PLANNING

$120,000

$24,000

$0

$96,000

$0

$0

$0

$0

RTD0011314

MVRTA ‐ NON FIXED ROUTE ADA PARA SERV

$2,305,700

$0

$0

$1,844,560

$0

$0

$461,140

$0

RTD0011315

MVRTA ‐ BUY REPLACEMENT 35‐FT BUS

$10,000,000

$2,000,000

$0

$0

$8,000,000

$0

$0

$0

RTD0011316

MVRTA ‐ CONSTRUCT ‐ MISC EQUIPMENT

$5,000,000

$1,000,000

$0

$4,000,000

$0

$0

$0

$0

FFY 2027 Federal Aid Totals

$21,510,700

$3,524,000

$0

$8,733,060

$8,000,000

$0

$1,253,640

$0

FFY 2027 Transit Non‐Federal Aid

RTD0011319

MVRTA ‐ CONSTRUCT ‐ MISC EQUIPMENT

$125,000

$125,000

$0

$0

$0

$0

$0

$0

Draft FFYs 2023-2027 MVMPO TIP April 2022 96

Summary of Highway Project Listings by Town

Draft FFYs 2023-2027 MVMPO TIP April 2022 97

Summary of Highway Projects by Town

(2023 to 2027 Regional Target Funds)

Year (s) Programmed

City / Town

Project Description

Total Cost

Programmed

2027

Amesbury

Amesbury– Riverwalk Connector to the

Salisbury Point Ghost Trail (# 611977)

$2,448,760

2027

Haverhill

Haverhill– Roadway Reconstruction on

North Avenue, from Main Street (Route

125) to Plaistow, NH (# 608788)

$5,798,257*

2024

Methuen

Methuen – Intersection Improvements at

Riverside Drive and Burnham Road

(# 610658)

$2,063,889

2027

New- buryport

Newburyport– Intersection Improve- ments @ Route 1 & Merrimac Street (#

608029)

$2,870,513

2024-2027

North

Andover

North Andover- Corridor Improvements on Route 114, between Waverly Road & Willow/Mill Street (# 608095)

$34,083,859

2023-2024

Salisbury

Salisbury – Reconstruction of Route 1 (Lafayette Road)

$19,266,283

* Haverhill North Avenue is AC’d FFY 2027, FFY 2028 and 2029 = $ 17,802,740, Total
Project Cost =$23,600,997
Draft FFYs 2023-2027 MVMPO TIP April 2022 98

Summary of Programmed Highway Funds by Town

(2023 to 2027 Regional Target Funds)

Project Description

Total Cost

Programmed

Amesbury Total

$2,448,760

Haverhill Total

$5,798,257*

Methuen Total

$2,063,889

Newburyport Total

$2,870,513

North Andover Total

$34,083,859

Salisbury Total

$19,266,283

Regional Total

$66,531,561

Draft FFYs 2023-2027 MVMPO TIP April 2022 99

Summary of Highway Projects by Town

(2023 to 2027 Statewide and Regional Target Funds)

Year (s) Programmed

City / Town

Project Description

Total Cost

Programmed

2027

Amesbury

Amesbury– Riverwalk Connector to the

Salisbury Point Ghost Trail (# 611977)

$2,448,760

2025

Andover

Andover- Bridge Preservation, A-09-022, I-93 over Merrimack River (# 612193)

$38,102,400

2023-2026

Andover

Andover- Bridge Rehabilitation, A-09-

036, I-495 over St 28 (SB), A-09-037, I-

495 over B&M and MBTA, A-09-041, I-

495 over St 28 (NB) (# 606522)

$173,075,000

2025

Andover

Andover– Bridge Replacement, A-09-

015, Tewksbury Street over MBTA/ BMRR (# 612143)

$17,383,839

2025

Andover- Tewksbury

Andover-Tewksbury- Interstate Mainte- nance and related work on I-93 (#

612045)

$18,525,197

2024

Georgetown

/ Boxford

Georgetown - Boxford Border to Boston Trail, from Georgetown Road to West Main Street (Route 97) (# 607541)

$2,520,436

2026

Georgetown

/ Newbury

Georgetown - Newbury Border to Boston Trail, (Northern Georgetown to Byfield Section) (# 607542)

$6,798,000

2026

Groveland

Groveland- Improvements at Dr. Elmer

Bagnall Elementary (SRTS) (#S12208)

$1,858,080

2024-2027

Haverhill

Haverhill- Bridge Replacement, H-12-

007 & H-12-025, Bridge Street (SR 125) over the Merrimack River and the Aban- doned B&M RR (Proposed Bikeway)

(# 605304)

$108,011,904

2024-2027

Haverhill

Haverhill - Bridge Replacement, H-12-

040, I-495 (NB & SB) over Merrimack

River (# 609466)

$96,087,420

Draft FFYs 2023-2027 MVMPO TIP April 2022 100

Summary of Highway Projects by Town

(2023 to 2027 Statewide and Target Funds) (Cont.)

Year (s) Programmed

City / Town

Project Description

Total Cost

Programmed

2027

Haverhill

Haverhill– Roadway Reconstruction on

North Avenue, from Main Street (Route

125) to Plaistow, NH (# 608788)

$5,798,257*

2026

Lawrence

Lawrence – Bridge Replacement, L-04-

012, Short Street over Spicket River (#

612074)

$3,285,005

2025

Lawrence

Lawrence – Community Day Arlington

Improvements (612002)

$1,554,211

2024-2025

Lawrence

Lawrence – Lawrence Manchester Rail

Corridor (LMRC) Rail Trail (# 608930)

$21,416,304

2024

Lawrence

Lawrence – Roadway Reconstruction on

Amesbury Street (# 610924)

$8,028,654

2025

Methuen

Methuen- Bridge Replacement, M-17-

026, Route 213 EB/WB over the Me- thuen Rail Trail (# 612158)

$4,598,252

2024

Methuen

Methuen – Intersection Improvements at

Riverside Drive and Burnham Road

(# 610658)

$2,063,889

2027

Newburyport

Newburyport– Intersection Improve- ments @ Route 1 & Merrimac Street (#

608029)

$2,870,513

2024-2027

North

Andover

North Andover- Corridor Improvements on Route 114, between Waverly Road & Willow/Mill Street (# 608095)

$34,083,859

2023

Rowley

Rowley – Safety Improvements at Route

1, Central and Glen Streets (# 609392)

$1,330,785

2023-2024

Salisbury

Salisbury – Reconstruction of Route 1 (Lafayette Road) (# 602202)

$19,266,283

* Haverhill North Avenue is AC’d FFY 2028 and 2029 = $ 17,802,740, Total Project Cost
=$23,600,997
Draft FFYs 2023-2027 MVMPO TIP April 2022 101

Summary of Programmed Highway Funds by Town

(2023 to 2027 Statewide and Regional Target Funds)

Project Description

Total Cost

Programmed

Amesbury Total

$2,448,760

Andover Total

$247,086,436

Boxford Total

$1,260,218

Georgetown Total

$4,659,218

Groveland Total

$1,858,080

Haverhill Total

$209,897,581

Lawrence Total

$34,284,174

Methuen Total

$6,662,141

Newbury Total

$3,399,000

Newburyport Total

$2,870,513

North Andover Total

$34,083,859

Rowley Total

$1,330,785

Salisbury Total

$19,266,283

Regional Total

$569,107,048

Draft FFYs 2023-2027 MVMPO TIP April 2022 102

Part C. Federal Requirements

Draft FFYs 2023-2027 MVMPO TIP April 2022 103

Part C.1. Highway Program Financial Plan

The TIP must be financially constrained, meaning projects included in the TIP must have
an identified funding source. Funding levels for Federal Fiscal Years 2023-2027 have been developed cooperatively between the State and the MPOs as part of the TIP development process. The following tables depict the resulting financial plan for each of the five fiscal years. The tables show the “Current Obligation Authority” values from the current 2022 to
2026 TIPs based on Obligation Authorities from the FAST Act. The “Proposed Obligation
Authority” values are estimated from the new federal transportation act titled “Infrastructure
Investment and Jobs Act (IIJA)” that was signed into law November 15, 2021, Public Law
117-58, also known as the “Bipartisan Infrastructure Law” (BIL). There is about an 18%
increase in Authorization in the new legislation versus the previous.
MassDOT receives a funding “Apportionment” or estimate of total available federal funding from the Federal Highway Administration (FHWA) then Congress looks at the budget each year and places a limit on how much can be spent from the expected highway Apportionment resulting in the obligation limitation MassDOT can spend in federal funding each year. The Proposed Base Obligation Authority estimated is based on a 2% growth rate from the actual FFY 2022 apportionment and average Fast Act Obligation Authority of
90% through FFY 2021. The MassDOT Highway Division programs are being revised based on new Accelerated Bridge Program (ABP) Grant Application Notes (GANs) repayment schedule and the proposed Obligation Authority, no changes are being made to the MPO TIP Targets for FFY 2023 to 2027. This estimated Base Obligation Authority is listed first to which is added a “Planned redistribution request” estimated to be
$50,000,000 each year of the TIP. (Toward the end of the FFY any state that has not spent their Federal Obligation Authority returns that authority, and the Federal government redistributes those funds to the other states.) The Total estimated Federal Funds available to Massachusetts is estimated to be between approximately 778.6 million dollars and
849.5 million dollars for each of FFYs 2023 to 2027. The State then subtracts annual debt service payments for the Accelerated Bridge Program (ABP) Grant Application Notes (GANs) which range from 89.5 million dollars to more than 133.6 million dollars for each year over the five years of the TIP. Resulting in the Total non-earmarked funding available to the State ranging from 699.1 million dollars to 715.9 million dollars depending on the ABP GANS repayment schedule.
The funding for regional priorities is estimated to be 240 million dollars in 2023, 243.6 million dollars in 2024, The amount available to the regions is less in 2025, due to the increase in the ABP GANS repayment in 2025, leaving 238 million dollars in 2025. The amount available to the regions is even less in 2026, due to additional increase in the ABP
GANS repayment in 2026, leaving 233.3 million dollars. The ABP GANS repayment
Draft FFYs 2023-2027 MVMPO TIP April 2022 104
remains large in 2027, leaving 245.9 million dollars. The State generally provides the 20% match required for the Federal funds resulting in estimated funds ranging from approximately 299 million dollars to approximately 415 million dollars available for regional funding priorities for each of the five years of the TIP.
This funding is then allocated to MPOs based upon the existing Massachusetts Association of Regional Planning Agencies (MARPA) TIP target distribution formula. This “MARPA” formula is based mainly on each MPO’s road mileage and population. The MVMPO’s share is 4.4296%, resulting in the total funding available for MVMPO regional priorities with the 20% State match to be: $13,293,829 in FFY 2023; $13,468,779 in FFY
2024; $13,239,974 in FFY 2025: $12,916,056 in FFY 2026 and $13,612,923 in FFY 2027, an increase of approximately $2 million dollars per year compared to the FAST Act.
In FFY 2017 MassDOT ended funding for the regional major infrastructure program after the I-91 Viaduct in Springfield project had been completed. These funds will be reallocated to the Regional Target program for prioritization by MPOs across the state.
Inflation increases project costs and therefore project costs have been increased 4% per year.
Draft FFYs 2023-2027 MVMPO TIP April 2022 105

FFY 2023-2027 STIP

2023 - 2027 Regional Target Budgets (DRAFT)

Balance Obligation Authority Planned Redistribution Request Total Estimated Funding Available ABP GANS Repayment

*Base Obligation Authority based on 2.0% growth rate from actual FFY 2022 Apportionment

$799,527,245 and average of FAST Act Obligation Authority (90%) through FFY 2021.

$50,000,000 **MPO TIP Targets will be held harmless from changes in proposed Obligation Authority

$849,527,245 ***MassDOT Highway Division Programs are being revised based on new ABP Gans

-$133,620,000 schedule and proposed Obligation Authority.

Total Non-earmarked Funding Available Regional

Share (%)

MPO

$715,907,245 Total Funding

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$8,751,410

$10,939,263

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$105,636,228

$132,045,285

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$11,272,640

$14,090,801

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$21,364,937

$26,706,171

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$6,243,948

$7,804,935

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$762,147

$952,683

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$10,890,338

$13,612,922

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$10,964,094

$13,705,117

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$540,878

$676,098

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$9,611,898

$12,014,873

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$11,209,702

$14,012,127

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$26,576,791

$33,220,988

3.5596%

42.9671%

4.5851%

8.6901%

2.5397%

0.3100%

4.4296%

4.4596%

0.2200%

3.9096%

4.5595%

10.8100%

8.9601%

Berkshire Region Boston Region Cape Cod

Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket

Northern Middlesex

Old Colony Pioneer Valley Southeastern Mass

$22,028,742

$27,535,928

Funding for Regional Priorities

$245,853,752 $307,317,191

Highway Division Programs

$405,426,076 $506,782,595

Draft FFYs 2023-2027 MVMPO TIP April 2022 106

Statewide Transportation Improvement Program (STIP) Program Targets

Federal Fiscal Year 2023

$820,706,716

Current Obligation Authority (federal aid only)

Proposed Obligation

Authority (90%*, BIL)

Matching Funds

Proposed Matching

Funds

FFY 2023 (Current

Targets (federal aid

+ match)

FFY 2023 - BIL (Proposed)

(Fed Aid + Match)

FFY 2023 Programmed vs.

Programmed FFY 2023 Proposed

(Current) Targets

Balance Obligation Authority

$630,537,333

$738,636,044

$108,098,711

Planned Redistribution Request

$50,000,000

$50,000,000

Total Non-earmarked Funding Available

$680,537,333 $788,636,044

$226,845,778

$153,592,717

$907,383,111

$942,228,761

Planning/Adjustments/Pass-throughs

$138,458,425 $155,568,899

$11,802,279

$15,579,052

$150,260,704

$171,147,950

$148,410,760

$ 22,737,190

ABP GANS Repayment

$89,510,000

$89,510,000

$0

$0

$89,510,000

$89,510,000

$89,510,000

$ -

Award Adjustments, Change Orders, etc.

$12,383,176

$27,019,379

$2,938,744

$6,412,171

$15,321,920

$33,431,550

$15,321,920

$ 18,109,630

Metropolitan Planning

$10,008,876

$10,886,010

$2,502,219

$2,721,503

$12,511,095

$13,607,513

$12,511,095

$ 1,096,418

State Planning & Research

$20,431,055

$22,955,893

$5,107,764

$5,738,973

$25,538,819

$28,694,866

$25,538,819

$ 3,156,047

Recreational Trails

$1,186,729

$1,186,729

$296,682

$296,682

$1,483,411

$1,483,411

$1,483,411

$ 0

Railroad Grade Crossings

$2,000,000

$2,371,999

$222,222

$0

$2,222,222

$2,371,999

$2,222,222

$ 149,777

SRTS Education

$1,458,634

$1,638,890

$364,659

$409,722

$1,823,293

$2,048,612

$1,823,293

$ 225,319

Transit Grant Program

$1,479,955

$0

$369,989

$0

$1,849,944

$0

$0

$ -

Flex to FTA

$0

$0

$0

$0

$0

$0

$0

$ -

Regional Priorities

Regional Share (%) MPO

$202,968,036 $240,090,826

$50,742,009

$60,022,706

$253,710,045

$300,113,532

$245,657,642

$ 54,455,890

3.5596

Berkshire Region

$7,224,850

$8,546,273

$1,806,213

$2,136,568

$9,031,063

$10,682,841

$6,768,098

$ 3,914,743

42.9671

Boston Region

$87,209,479

$103,160,065

$21,802,370

$25,790,016

$109,011,849

$128,950,081

$108,908,329

$ 20,041,752

4.5851

Cape Cod

$9,306,287

$11,008,404

$2,326,572

$2,752,101

$11,632,859

$13,760,506

$11,209,113

$ 2,551,393

8.6901

Central Mass

$17,638,125

$20,864,133

$4,409,531

$5,216,033

$22,047,657

$26,080,166

$22,015,408

$ 4,064,758

2.5397

Franklin Region

$5,154,779

$6,097,587

$1,288,695

$1,524,397

$6,443,474

$7,621,983

$6,443,474

$ 1,178,509

0.3100

Martha's Vineyard

$629,201

$744,282

$157,300

$186,070

$786,501

$930,352

$0

$ 930,352

4.4296

Merrimack Valley

$8,990,672

$10,635,063

$2,247,668

$2,658,766

$11,238,340

$13,293,829

$11,238,340

$ 2,055,489

4.4596

Montachusett

$9,051,563

$10,707,090

$2,262,891

$2,676,773

$11,314,453

$13,383,863

$10,961,234

$ 2,422,629

0.2200

Nantucket

$446,530

$528,200

$111,632

$132,050

$558,162

$660,250

$0

$ 660,250

3.9096

Northern Middlesex

$7,935,238

$9,386,591

$1,983,810

$2,346,648

$9,919,048

$11,733,239

$9,524,030

$ 2,209,209

4.5595

Old Colony

$9,254,328

$10,946,941

$2,313,582

$2,736,735

$11,567,910

$13,683,676

$11,567,910

$ 2,115,766

10.8100

Pioneer Valley

$21,940,845

$25,953,818

$5,485,211

$6,488,455

$27,426,056

$32,442,273

$27,208,514

$ 5,233,759

8.9601

Southeastern Mass

$18,186,139

$21,512,378

$4,546,535

$5,378,095

$22,732,674

$26,890,473

$19,813,192

$ 7,077,281

Highway** $339,110,872 $392,976,320 $77,990,959 $77,990,959 $417,101,831 $470,967,279 $415,292,003 $ 55,675,276

Grand Total (Formula Programs Only) $680,537,333 $788,636,044 $140,535,247 $153,592,717 $821,072,580 $942,228,761 $809,360,405 $ 132,868,356

Difference from Funds Available $0 $86,310,531 $86,310,531

*FFY 2023-2027 Development STIP assumes 90% obligation limitation based on average of previous 5 years.

**Highway Program sizes subject to change following 2022 TIP Readiness Days Review

Draft FFYs 2023-2027 MVMPO TIP April 2022

Reported Date:

107

Statewide Transportation Improvement Program (STIP) Program Targets

Federal Fiscal Year 2024

$837,121,872

Current Obligation Authority (federal aid only)

Proposed Obligation

Authority (90%, BIL)

Matching Funds

Proposed Matching

Funds

FFY 2024(Current

Targets (federal aid

+ match)

FFY 2024 - BIL (Proposed)

(Fed Aid + Match)

FFY 2024 Programmed vs.

Programmed FFY 2024 Proposed

(Current) Targets

Balance Obligation Authority

$643,686,929

$753,409,685

Planned Redistribution Request

$50,000,000

$50,000,000

Total Non-earmarked Funding Available

$693,686,929 $803,409,685

$231,228,976

$154,932,461

$924,915,905

$958,342,146

Planning/Adjustments/Pass-throughs

$142,974,186 $160,491,599

$11,812,469

$15,688,335

$154,786,655

$176,179,933

$154,786,655

$ 21,393,278

ABP GANS Repayment

$93,985,000

$93,985,000

$0

$0

$93,985,000

$93,985,000

$93,985,000

$ -

Award Adjustments, Change Orders, etc.

$12,383,176

$27,227,636

$2,938,744

$6,461,594

$15,321,920

$33,689,230

$15,321,920

$ 18,367,310

Metropolitan Planning

$10,008,876

$11,103,730

$2,502,219

$2,775,933

$12,511,095

$13,879,663

$12,511,095

$ 1,368,568

State Planning & Research

$20,431,055

$22,934,299

$5,107,764

$5,733,575

$25,538,819

$28,667,873

$25,538,819

$ 3,129,054

Recreational Trails

$1,186,729

$1,186,729

$296,682

$296,682

$1,483,411

$1,483,411

$1,483,411

$ 0

Railroad Grade Crossings

$2,000,000

$2,371,999

$222,222

$0

$2,222,222

$2,371,999

$2,222,222

$ 149,777

SRTS Education

$1,498,596

$1,682,206

$374,649

$420,552

$1,873,245

$2,102,758

$1,873,245

$ 229,513

Transit Grant Program

$1,480,754

$0

$370,189

$0

$1,850,943

$0

$1,850,943

$ (1,850,943)

Flex to FTA

$0

$0

$0

$0

$0

$0

$0

$ -

Regional Priorities

Regional Share (%) MPO

$205,628,284

$243,250,477

$51,407,071

$60,812,619

$257,035,353

$304,063,096

$245,196,969

$ 58,866,127

3.5596

Berkshire Region

$7,319,544

$8,658,744

$1,829,886

$2,164,686

$9,149,430

$10,823,430

$8,804,198

$ 2,019,232

42.9671

Boston Region

$88,352,510

$104,517,676

$22,088,128

$26,129,419

$110,440,638

$130,647,095

$110,440,638

$ 20,206,457

4.5851

Cape Cod

$9,428,262

$11,153,278

$2,357,066

$2,788,319

$11,785,328

$13,941,597

$11,785,328

$ 2,156,269

8.6901

Central Mass

$17,869,303

$21,138,710

$4,467,326

$5,284,677

$22,336,629

$26,423,387

$22,093,208

$ 4,330,179

2.5397

Franklin Region

$5,222,342

$6,177,832

$1,305,586

$1,544,458

$6,527,928

$7,722,290

$4,591,249

$ 3,131,041

0.3100

Martha's Vineyard

$637,448

$754,076

$159,362

$188,519

$796,810

$942,596

$796,810

$ 145,786

4.4296

Merrimack Valley

$9,108,510

$10,775,023

$2,277,128

$2,693,756

$11,385,638

$13,468,779

$11,385,638

$ 2,083,141

4.4596

Montachusett

$9,170,199

$10,847,998

$2,292,550

$2,712,000

$11,462,749

$13,559,998

$11,400,000

$ 2,159,998

0.2200

Nantucket

$452,382

$535,151

$113,096

$133,788

$565,478

$668,939

$0

$ 668,939

3.9096

Northern Middlesex

$8,039,243

$9,510,121

$2,009,811

$2,377,530

$10,049,054

$11,887,651

$9,249,040

$ 2,638,611

4.5595

Old Colony

$9,375,622

$11,091,006

$2,343,906

$2,772,751

$11,719,528

$13,863,757

$7,037,491

$ 6,826,266

10.8100

Pioneer Valley

$22,228,417

$26,295,377

$5,557,104

$6,573,844

$27,785,521

$32,869,221

$27,202,550

$ 5,666,671

8.9601

Southeastern Mass

$18,424,500

$21,795,486

$4,606,125

$5,448,872

$23,030,625

$27,244,358

$20,410,819

$ 6,833,539

Highway $345,084,459 $399,667,609 $79,364,803 $78,431,507 $424,449,262 $478,099,116 $413,784,289 $ 64,314,827

Grand Total $693,686,929 $803,409,685 $142,584,342 $154,932,461 $836,271,269 $958,342,146 $813,767,913 $ 144,574,233

*FFY 2023-2027 Development STIP assumes 90% obligation limitation based on average of previous 5 years.

**Highway Program sizes subject to change following 2022 TIP Readiness Days Review

Draft FFYs 2023-2027 MVMPO TIP April 2022 108

Statewide Transportation Improvement Program (STIP) Program Targets

Federal Fiscal Year 2025

$853,865,331

Current Obligation Authority (federal aid only)

Proposed Obligation

Authority (90%, BIL)

Matching Funds

Proposed Matching

Funds

FFY 2025 (Current

Targets (federal aid

+ match)

FFY 2025 - BIL (Proposed)

(Fed Aid + Match)

FFY 2025 Programmed vs.

Programmed FFY 2025 Proposed

(Current) Targets

Balance Obligation Authority

$657,110,754 $768,478,798

Planned Redistribution Request

$50,000,000 $50,000,000

Total Non-earmarked Funding Available

$707,110,754

$818,478,798

$139,089,947

$109,327,957

$846,200,701

$927,806,755

Planning/Adjustments/Pass-throughs

$171,174,185 $191,473,179

$11,812,468

$16,348,766

$182,986,653

$207,821,945

$176,447,834

$ 31,374,111

ABP GANS Repayment

$122,185,000

$122,185,000

$0

$0

$122,185,000

$122,185,000

$122,185,000

$ -

Award Adjustments, Change Orders, etc.

$12,383,176

$29,984,445

$2,938,744

$7,115,833

$15,321,920

$37,100,278

$15,321,920

$ 21,778,358

Metropolitan Planning

$10,008,876

$11,325,805

$2,502,219

$2,831,451

$12,511,095

$14,157,257

$12,511,095

$ 1,646,162

State Planning & Research

$20,431,055

$22,853,908

$5,107,764

$5,713,477

$25,538,819

$28,567,385

$19,000,000

$ 9,567,385

Recreational Trails

$1,186,729

$1,186,729

$296,682

$296,682

$1,483,411

$1,483,411

$1,483,411

$ 0

Railroad Grade Crossings

$2,000,000

$2,371,999

$222,222

$0

$2,222,222

$2,371,999

$2,222,222

$ 149,777

SRTS Education

$1,399,349

$1,565,293

$349,837

$391,323

$1,749,186

$1,956,617

$1,749,186

$ 207,431

Transit Grant Program

$1,580,000

$0

$395,000

$0

$1,975,000

$0

$1,975,000

$ (1,975,000)

Flex to FTA

$0

$0

$0

$0

$0

$0

$0

$ -

Regional Priorities

Regional Share (%) MPO

$200,827,858

$239,118,188

$50,206,964

$59,779,547

$251,034,822

$298,897,735

$238,296,199

$ 60,601,536

3.5596

Berkshire Region

$7,148,668

$8,511,651

$1,787,167

$2,127,913

$8,935,835

$10,639,564

$8,153,760

$ 2,485,804

42.9671

Boston Region

$86,289,907

$102,742,151

$21,572,477

$25,685,538

$107,862,384

$128,427,689

$107,862,383

$ 20,565,306

4.5851

Cape Cod

$9,208,158

$10,963,808

$2,302,040

$2,740,952

$11,510,198

$13,704,760

$10,411,714

$ 3,293,046

8.6901

Central Mass

$17,452,142

$20,779,610

$4,363,036

$5,194,902

$21,815,178

$25,974,512

$18,679,131

$ 7,295,381

2.5397

Franklin Region

$5,100,425

$6,072,885

$1,275,106

$1,518,221

$6,375,531

$7,591,106

$6,375,531

$ 1,215,575

0.3100

Martha's Vineyard

$622,566

$741,266

$155,642

$185,317

$778,208

$926,583

$334,267

$ 592,316

4.4296

Merrimack Valley

$8,895,871

$10,591,979

$2,223,968

$2,647,995

$11,119,839

$13,239,974

$11,119,839

$ 2,120,135

4.4596

Montachusett

$8,956,119

$10,663,715

$2,239,030

$2,665,929

$11,195,149

$13,329,643

$11,183,187

$ 2,146,456

0.2200

Nantucket

$441,821

$526,060

$110,455

$131,515

$552,276

$657,575

$0

$ 657,575

3.9096

Northern Middlesex

$7,851,566

$9,348,565

$1,962,892

$2,337,141

$9,814,458

$11,685,706

$8,676,332

$ 3,009,374

4.5595

Old Colony

$9,156,746

$10,902,594

$2,289,187

$2,725,648

$11,445,933

$13,628,242

$10,458,468

$ 3,169,774

10.8100

Pioneer Valley

$21,709,491

$25,848,676

$5,427,373

$6,462,169

$27,136,864

$32,310,845

$23,991,612

$ 8,319,233

8.9601

Southeastern Mass

$17,994,377

$21,425,229

$4,498,594

$5,356,307

$22,492,971

$26,781,536

$21,049,975

$ 5,731,561

Highway $335,108,710 $387,887,431 $77,070,514 $33,199,644 $412,179,224 $421,087,075 $412,451,446 $ 8,635,629

Grand Total $707,110,753 $818,478,798 $139,089,947 $109,327,957 $846,200,699 $927,806,755 $827,195,479 $ 100,611,276

*FFY 2023-2027 Development STIP assumes 90% obligation limitation based on average of previous 5 years.

**Highway Program sizes subject to change following 2022 TIP Readiness Days Review

Draft FFYs 2023-2027 MVMPO TIP April 2022 109

Statewide Transportation Improvement Program (STIP) Program Targets

Federal Fiscal Year 2026 $737,158,821.98

$870,943,658

Current Obligation Authority (federal aid only)

Proposed Obligation

Authority (90%, BIL)

Matching Funds

Proposed Matching

Funds

FFY 2026 (Current

Targets (federal aid

+ match)

FFY 2026 - BIL (Proposed)

(Fed Aid + Match)

FFY 2026 Programmed vs.

Programmed FFY 2026 Proposed

(Current) Targets

Balance Obligation Authority

$670,814,528 $783,849,292

Planned Redistribution Request

$50,000,000 $50,000,000

Total Non-earmarked Funding Available

$720,814,528

$833,849,292

$139,460,228

$108,584,873

$860,274,756

$942,434,165

Planning/Adjustments/Pass-throughs

$182,609,185 $204,264,787

$11,802,279

$17,068,197

$194,411,464

$221,332,984

$187,882,794

$ 33,450,190

ABP GANS Repayment

$133,620,000

$133,620,000

$0

$0

$132,620,000

$133,620,000

$133,620,000

$ -

Award Adjustments, Change Orders, etc.

$12,383,176

$31,114,469

$2,938,744

$7,778,617

$15,321,920

$38,893,087

$15,321,920

$ 23,571,167

Metropolitan Planning

$10,008,876

$11,552,321

$2,502,219

$2,888,080

$12,511,095

$14,440,401

$12,511,095

$ 1,929,306

State Planning & Research

$20,431,055

$22,853,971

$5,107,764

$5,713,493

$25,538,819

$28,567,464

$19,000,000

$ 9,567,464

Recreational Trails

$1,186,729

$1,186,729

$296,682

$296,682

$1,483,411

$1,483,411

$1,483,411

$ 0

Railroad Grade Crossings

$2,000,000

$2,371,999

$222,222

$0

$2,222,222

$2,371,999

$2,222,222

$ 149,777

SRTS Education

$1,399,349

$1,565,298

$364,659

$391,324

$1,823,293

$1,956,622

$1,749,146

$ 207,476

Transit Grant Program

$1,580,000

$0

$369,989

$0

$1,849,944

$0

$1,975,000

$ (1,975,000)

Flex to FTA

$0

$0

$0

$0

$0

$0

$0

$ -

Regional Priorities

Regional Share (%) MPO

$195,612,737

$233,268,128

$48,903,185

$58,317,032

$244,515,922

$291,585,161

$210,364,252

$ 81,220,909

3.5596

Berkshire Region

$6,963,031

$8,303,412

$1,740,758

$2,075,853

$8,703,789

$10,379,265

$8,703,788

$ 1,675,477

42.9671

Boston Region

$84,049,120

$100,228,550

$21,012,280

$25,057,138

$105,061,400

$125,285,688

$84,712,046

$ 40,573,642

4.5851

Cape Cod

$8,969,040

$10,695,577

$2,242,260

$2,673,894

$11,211,300

$13,369,471

$11,211,300

$ 2,158,171

8.6901

Central Mass

$16,998,942

$20,271,234

$4,249,736

$5,067,808

$21,248,678

$25,339,042

$17,989,196

$ 7,349,846

2.5397

Franklin Region

$4,967,977

$5,924,311

$1,241,994

$1,481,078

$6,209,971

$7,405,388

$3,619,452

$ 3,785,936

0.3100

Martha's Vineyard

$606,399

$723,131

$151,600

$180,783

$757,999

$903,914

$0

$ 903,914

4.4296

Merrimack Valley

$8,664,862

$10,332,845

$2,166,216

$2,583,211

$10,831,078

$12,916,056

$10,831,078

$ 2,084,978

4.4596

Montachusett

$8,723,546

$10,402,825

$2,180,887

$2,600,706

$10,904,433

$13,003,532

$10,863,274

$ 2,140,258

0.2200

Nantucket

$430,348

$513,190

$107,587

$128,297

$537,935

$641,487

$0

$ 641,487

3.9096

Northern Middlesex

$7,647,676

$9,119,851

$1,911,919

$2,279,963

$9,559,595

$11,399,813

$9,559,595

$ 1,840,218

4.5595

Old Colony

$8,918,963

$10,635,860

$2,229,741

$2,658,965

$11,148,704

$13,294,825

$11,148,703

$ 2,146,122

10.8100

Pioneer Valley

$21,145,737

$25,216,285

$5,286,434

$6,304,071

$26,432,171

$31,520,356

$22,487,591

$ 9,032,765

8.9601

Southeastern Mass

$17,527,097

$20,901,058

$4,381,774

$5,225,264

$21,908,871

$26,126,322

$19,238,229

$ 6,888,093

Highway $342,592,606 $396,316,377 $78,754,765 $33,199,644 $421,347,371 $429,516,020 $419,335,424 $ 10,180,596

Grand Total $720,814,528 $833,849,292 $139,460,228 $108,584,873 $860,274,757 $942,434,165 $817,582,470 $ 124,851,695

*FFY 2023-2027 Development STIP assumes 90% obligation limitation based on average of previous 5 years.

**Highway Program sizes subject to change following 2022 TIP Readiness Days Review

Draft FFYs 2023-2027 MVMPO TIP April 2022 110

Statewide Transportation Improvement Program (STIP) Program Targets

Federal Fiscal Year 2027

$888,363,605

Assumed Obligation FFY 2027 FFY 2027 - BIL

Authority (federal aid OA - BIL (Fed Aid Matching Funds Matching Funds - (Proposed) (Proposed)

only)^ only)* BIL (Fed Aid + Match) (Fed Aid + Match)

FFY 2027 Programmed vs.

Programmed FFY 2027 Proposed

(Current) Targets

Balance Obligation Authority

$684,230,819 $799,527,245

Planned Redistribution Request

$50,000,000

$50,000,000

Total Non-earmarked Funding Available

$734,230,819

$849,527,245

$139,460,228

$178,383,812

$873,691,047

$1,027,911,056

Planning/Adjustments/Pass-throughs

$185,261,368

$198,247,416

$11,802,279

$15,563,854

$197,063,647

$213,811,271

$0

$ 213,811,271

ABP GANS Repayment

$136,292,400

$133,620,000

$0

$0

$132,620,000

$133,620,000

$ 133,620,000

Award Adjustments, Change Orders, etc.

$12,630,840

$24,773,827

$2,938,744

$6,193,457

$15,321,920

$30,967,284

$ 30,967,284

Metropolitan Planning

$10,209,054

$11,552,321

$2,502,219

$2,888,080

$12,511,095

$14,440,401

$ 14,440,401

State Planning & Research

$20,839,676

$23,315,205

$5,107,764

$5,828,801

$25,538,819

$29,144,006

$ 29,144,006

Recreational Trails

$1,210,464

$1,186,729

$296,682

$296,682

$1,483,411

$1,483,411

$ 1,483,411

Railroad Grade Crossings

$2,040,000

$2,371,999

$222,222

$0

$2,222,222

$2,371,999

$ 2,371,999

SRTS Education

$1,427,336

$1,427,336

$364,659

$356,834

$1,823,293

$1,784,170

$ 1,784,170

Transit Grant Program

$1,611,600

$0

$369,989

$0

$1,849,944

$0

$ -

Flex to FTA

$0

$0

$0

$0

$0

$0

$ -

Regional Priorities

Regional Share (%) MPO

$199,524,992

$245,853,752

$48,903,185

$61,463,438

$248,428,177

$307,317,191

$0

$ 307,317,191

3.5596

Berkshire Region

$7,102,292

$8,751,410

$1,740,758

$2,187,853

$9,031,063

$10,939,263

$ 10,939,263

42.9671

Boston Region

$85,730,102

$105,636,228

$21,012,280

$26,409,057

$109,011,849

$132,045,285

$ 132,045,285

4.5851

Cape Cod

$9,148,421

$11,272,640

$2,242,260

$2,818,160

$11,632,859

$14,090,801

$ 14,090,801

8.6901

Central Mass

$17,338,921

$21,364,937

$4,249,736

$5,341,234

$22,047,657

$26,706,171

$ 26,706,171

2.5397

Franklin Region

$5,067,337

$6,243,948

$1,241,994

$1,560,987

$6,443,474

$7,804,935

$ 7,804,935

0.3100

Martha's Vineyard

$618,527

$762,147

$151,600

$190,537

$786,501

$952,683

$ 952,683

4.4296

Merrimack Valley

$8,838,159

$10,890,338

$2,166,216

$2,722,584

$11,238,340

$13,612,922

$ 13,612,922

4.4596

Montachusett

$8,898,017

$10,964,094

$2,180,887

$2,741,023

$11,314,453

$13,705,117

$ 13,705,117

0.2200

Nantucket

$438,955

$540,878

$107,587

$135,220

$558,162

$676,098

$ 676,098

3.9096

Northern Middlesex

$7,800,630

$9,611,898

$1,911,919

$2,402,975

$9,919,048

$12,014,873

$ 12,014,873

4.5595

Old Colony

$9,097,342

$11,209,702

$2,229,741

$2,802,425

$11,567,910

$14,012,127

$ 14,012,127

10.8100

Pioneer Valley

$21,568,652

$26,576,791

$5,286,434

$6,644,198

$27,426,056

$33,220,988

$ 33,220,988

8.9601

Southeastern Mass

$17,877,639

$22,028,742

$4,381,774

$5,507,186

$22,732,674

$27,535,928

$ 27,535,928

Highway $349,444,458 $405,426,076 $78,754,765 $101,356,519 $428,199,223 $506,782,595 $0 $ 506,782,595

Grand Total $734,230,819 $849,527,245 $139,460,228 $178,383,812 $873,691,047 $1,027,911,056 $0 $ 1,027,911,056

^FFY 2027 Totals are based on increasing program based on Current FY 2026 Program inflated 2%

*FFY 2023-2027 Development STIP assumes 90% obligation limitation based on average of previous 5 years.

**Highway Program sizes subject to change following 2022 TIP Readiness Days Review

Draft FFYs 2023-2027 MVMPO TIP April 2022 111
The following table shows the total federal programmed amounts in this TIP for each of the five years covered in this document. The funding summaries below show the total Operating and Maintenance costs versus Capital and Other costs, for each year of the TIP. All but one of the Regionally Prioritized Projects (Section 1A) are considered maintenance projects, the Amesbury Riverwalk Connector to the Salisbury Point Ghost Trail is a capitol improvement project, as it is new construction. The State Prioritized Modernization Projects (Section 2B) and Expansion Projects (Section 2C) are considered capital improvement projects, the rest of the State Prioritized Projects (Section 2A) and are considered maintenance projects. The Section
1B Earmark or Discretionary Grant Funded Project is considered a maintenance project. A fiscal constraint finding for the State Transportation Improvement Program will include the cost of operating and maintaining the existing MVMPO transportation system.

Highway Program Financial Plan Table

Merrimack Valley Metropolitan Planning Organization FFY 2023-2027 Transportation Improvement Program (FHWA - related funding categories only)

Total Costs including Federal and State Match*

Figures include Federal Aid “target” program & statewide funding

Fiscal

Year

Federal Programmed Operating/ Maintenance Costs*(inc. Match)

Federal Programmed Capital and Other Costs*(inc. Match)

Total Federal + Match Programmed*

Total Federal

+ Match Estimated Available Funds*

2023

$95.37

$0

$95.37

$95.37

2024

$123.49

$3.52

$127.01

$127.01

2025

$114.80

$21.97

$136.77

$136.77

2026

$85.69

$8.66

$94.35

$94.35

2027

$53.08

$2.44

$55.52

$55.52

* Millions of dollars
The financial plan contained herein is financially constrained and indicates that the Merrimack
Valley Metropolitan Planning Organization's FFYs 2023-2027 TIP reflects an emphasis on the maintenance and operation of the current roadway and bridge system with the ability to
Draft FFYs 2023-2027 MVMPO TIP April 2022 112
provide additional capital improvements. Only projects for which funds can be expected have been included.
Appendix B of this document includes a list of Non-federal-aid transportation projects in the region. The projects listed in Appendix B are an integral part of the planning, programming, and priority setting process of the MVMPO but have no available funding source.
Draft FFYs 2023-2027 MVMPO TIP April 2022 113

Summary of Highway Funding Categories

The following tables contain a breakdown of the project cost totals and federal aid cost portions by federal aid funding categories for each fiscal year and the expected available resources to cover the cost.

Cost Estimates and Available Resources

Summary by Funding Category

Highway Projects Federal Fiscal Year 2023

Highway

FFY 2023

Estimated Needs MVMPO

(in 1000s) Federal Portion of Cost

Estimated Needs MVMPO

(in 1000s)

Total Project

Cost

Available Resources MVMPO Projects

(in 1000s) (From Region Target if not Statewide Category)

Regional Target Congestion

Mitigation/AQ Program (CMAQ)

Regional Target Highway Safety

Program (HSIP)

Regional Target Surface Transportation Block Grant Program (STBG)

$10,635.06

$13,293.83

$13,293.83

Regional Target Subtotals

$10,635.06

$13,293.83

$13,293.83

Statewide (SW) Bridge On-System

NHS (NHPP)

$64,599.22

$80,749.02

$80,749.02

Statewide Safety Improvements

(NHPP)

$1,064.63

$1,330.79

$1,330.79

Statewide Bicycle and Pedestrian

(CMAQ)

Total FFY 2023

$76,298.91

$95,373.64

$95,373.64

Draft FFYs 2023-2027 MVMPO TIP April 2022 114

Cost Estimates and Available Resources

Summary by Funding Category

Highway Projects Federal Fiscal Year 2024

Highway

FFY 2024

Estimated Needs MVMPO (in 1000s) Federal Portion of Cost

Estimated Needs MVMPO (in 1000s) Total Project Cost

Available Resources MVMPO Projects (in 1000s)

(From Region Target if not Statewide Category)

Regional Target Surface Transportation Block Grant Program (STBG)

$10,775.02

$13,468.78

$13,468.78

Regional Target Subtotals

$10,775.02

$13,468.78

$13,468.78

Statewide Bicycle and Pedestrian

(CMAQ)

$2,816.35

$3,520.44

$3,520.44

Statewide (SW) Bridge On-System

NHS (NHPP)

$81,591.14

$101,988.93

$101,988.93

Earmark Discretionary (CRRSAA)

8,028.65

8,028.65

8,028.65

Total FFY 2024

$103,211.16

$127,006.80

$127,006.80

Draft FFYs 2023-2027 MVMPO TIP April 2022 115

Cost Estimates and Available Resources

Summary by Funding Category

Highway Projects Federal Fiscal Year 2025

Highway

FFY 2025

Estimated Needs MVMPO (in 1000s) Federal Portion of Cost

Estimated Needs MVMPO (in 1000s) Total Project Cost

Available Resources MVMPO Projects (in 1000s)

(From Region Target if not Statewide Category)

Regional Target Surface Transportation Block Grant Program (STBG)

$10,591.98

$13,239.97

$13,239.97

Regional Target Subtotals

$10,591.98

$13,239.97

$13,239.97

Statewide Bicycle and Pedestrian

(CMAQ)

$16,333.04

$20,416.30

$20,416.30

Statewide Bridge On-System NHS (NHPP)

$66,431.42

$83,039.28

$83,039.28

Statewide Interstate Pavement

(NHPP-I)

$16,672.68

$18,525.20

$18,525.20

Statewide Roadway Reconstruction

SRTS (TAP)

$1,243.37

$1,554.21

$1,554.21

Total Federal Aid FFY 2025

$111,272.49

$136,774.96

$136,774.96

Non-Federal Aid

Non-Federal Aid Total Project Cost

Non-Federal Aid Available Resources

Non-Federal Aid Bridge On-system

Non-NHS (NGBP)

$17,383.84

$17,383.84

Non-Federal Aid Bridge On-system

NHS (NGBP)

$42,700.65

$42,700.65

Total NFA Next Generation Bridge

Program (NGBP)

$60,084.49

$60,084.49

Draft FFYs 2023-2027 MVMPO TIP April 2022 116

Cost Estimates and Available Resources

Summary by Funding Category

Highway Projects Federal Fiscal Year 2026

Highway

FFY 2026

Estimated Needs MVMPO (in 1000s) Federal Portion of Cost

Estimated Needs MVMPO (in 1000s) Total Project Cost

Available Resources MVMPO Projects (in 1000s)

(From Region Target if not Statewide Category)

Regional Target Surface Transportation Block Grant Program (STBG)

$10,332.84

$12,916.06

$12,916.06

Regional Target Subtotals

$10,332.84

$12,916.06

$12,916.06

Statewide Bicycle and Pedestrian

(CMAQ)

$5,438.40

$6,798.00

$6,798.00

Statewide Bridge On-System NHS (NHPP)

$55,588.16

$69,485.19

$69,485.19

Statewide Bridge Off-System (STBG- BR-Off)

$2,628.00

$3,285.01

$3,285.01

Statewide Roadway Reconstruction

SRTS (TAP)

$1,486.46

$1,858.08

$1,858.08

Total FFY 2026

$75,473.86

$94,342.34

$94,342.34

Draft FFYs 2023-2027 MVMPO TIP April 2022 117

Cost Estimates and Available Resources

Summary by Funding Category

Highway Projects Federal Fiscal Year 2027

Highway

FFY 2027

Estimated Needs MVMPO (in 1000s) Federal Portion of Cost

Estimated Needs MVMPO (in 1000s) Total Project Cost

Available Resources MVMPO Projects

(in 1000s) (From Region Target if not Statewide Category)

Regional Target Congestion

Mitigation/AQ Program (CMAQ)

$0

$0

$0

Regional Target Highway Safety

Program (HSIP)

$0

$0

$0

Regional Target Surface Transportation Block Grant Program (STBG)

$10,890.34

$13,612.92

$13,612.92

Regional Target Subtotals

$10,890.34

$13,612.92

$13,612.92

Statewide Bridge On-System NHS (NHPP)

$33,529.52

$41,911.90

$41,911.90

Total FFY 2027

$44,419.86

$55,524.82

$55,524.82

The table on the following pages shows the MassDOT Highway Operating and Maintenance
expenditure estimates as of March 2022.
Draft FFYs 2023-2027 MVMPO TIP April 2022 118

2022-2026 | State Transportation Improvement Program

Operating and Maintenance Expenditures as of March 2022


Statewide and District Contracts plus Expenditures within MPO boundaries

Program Group/Sub Group

Est SFY 2022 Spending

Est SFY 2023 Spending

Est SFY 2024 Spending

Est SFY 2025 Spending

Est SFY 2026 Spending

Part 1: Non-Federal Aid

Section I - Non Federal Aid Maintenance Projects - State Bondfunds

01 - ADA Retrofits

Sidewalk Construction and Repairs $ 78,719 $ 114,000 $ 52,000 $ - $ -

02 - Bicycles and pedestrians program

Bikeway/Bike Path Construction $ - $ - $ - $ - $ -

03 - Bridge

Bridge Maintenance $ 47,360,434 $ 22,008,112 $ 7,019,328 $ 345,318 $ - Bridge Maintenance - Deck Repairs $ 13,072,586 $ 8,334,358 $ 5,311,045 $ 443,585 $ - Bridge Maintenance - Joints $ 3,793,035 $ 2,804,206 $ 1,208,481 $ 68,432 $ - Bridge Preservation $ 2,882,033 $ 11,816,698 $ 4,974,667 $ 317,981 $ - Drawbridge Maintenance $ 5,575,223 $ 2,560,174 $ - $ - $ - Painting - Structural $ 6,162,363 $ 1,605,861 $ - $ - $ - Structures Maintenance $ 284,948 $ 142,680 $ - $ - $ -

04 - Capacity

Highway Relocation $ - $ - $ - $ - $ - Hwy Reconstr - Added Capacity $ - $ - $ - $ - $ - Hwy Reconstr - Major Widening $ - $ - $ - $ - $ -

05 - Facilities

Vertical Construction (Ch 149) $ 6,669,216 $ 5,718,204 $ 1,651,487 $ 114,754 $ -

07 - Intersection Improvements

Traffic Signals $ 3,488,759 $ 2,224,126 $ 1,914,764 $ 94,957 $ -

08 - Interstate Pavement

Resurfacing Interstate $ - $ - $ - $ - $ -

09 - Intelligent Transportation Systems Program

Intelligent Transportation System $ - $ - $ - $ - $ -

10 - Non-interstate DOT Pavement Program

Milling and Cold Planing $ 625,000 $ 695,000 $ 65,316 $ - $ - Resurfacing $ 6,415,673 $ 4,437,466 $ 3,658,730 $ 956,730 $ - Resurfacing DOT Owned Non-Interstate $ 5,222,136 $ 3,704,756 $ 1,345,715 $ 178,272 $ -

11 - Roadway Improvements

Asbestos Removal $ - $ - $ - $ - $ -

Catch Basin Cleaning

$ 1,966,347

$ 1,455,089

$ 310,866

$ -

$ -

Contract Highway Maintenance

$ 3,190,450

$ 3,000,531

$ 1,668,618

$ 100,901

$ -

Crack Sealing

$ 1,672,864

$ 1,194,760

$ 706,377

$ 109,600

$ -

Culvert Maintenance $ - $ - $ - $ - $ - Culvert Reconstruction/Rehab $ - $ - $ - $ - $ - Drainage $ 7,341,532 $ 6,292,153 $ 1,154,896 $ 103,925 $ - Dredging $ - $ - $ - $ - $ -

Guard Rail & Fencing

$ 3,429,456

$ 4,146,615

$ 1,845,428

$ 278,197

$ -

Highway Sweeping

$ 963,234

$ 1,007,278

$ 141,245

$ -

$ -

Landscaping

$ 233,427

$ 600,000

$ 244,014

$ -

$ -

Mowing and Spraying

$ 2,002,002

$ 1,038,229

$ 357,576

$ 29,565

$ -

Sewer and Water

$ 3,904

$ 20,843

$ 10,580

$ -

$ -

Tree Trimming

$ 3,939,855

$ 2,625,059

$ 722,777

$ -

$ -

12 - Roadway Reconstruction

Hwy Reconstr - No Added Capacity $ 6,001 $ - $ - $ - $ -

Hwy Reconstr - Restr and Rehab $ 646,014 $ 109,047 $ 265,670 $ 177,113 $ - Roadway - Reconstr - Sidewalks and Curbing $ 1,879,857 $ 748,676 $ - $ - $ -

13 - Safety Improvements

Electrical $ 398,549 $ - $ - $ - $ - Impact Attenuators $ 1,068,681 $ 911,141 $ 346,248 $ 129,196 $ - Lighting $ 3,735,830 $ 2,267,423 $ 1,281,166 $ 116,870 $ - Pavement Marking $ 3,332,465 $ 3,166,821 $ 1,623,975 $ 343,891 $ - Safety Improvements $ 227,620 $ 33,595 $ - $ - $ - Sign Installation/Upgrading $ 545,832 $ 833,711 $ 827,507 $ 65,739 $ - Structural Signing $ 359,312 $ 129,607 $ - $ - $ - Section I Total: $ 138,573,354 $ 95,746,219 $ 38,708,474 $ 3,975,025 $ -

Section II - Non Federal Aid Highway Operations - State Operating Budget Funding

Snow and Ice Operations & Materials

$ 83,800,000

$ 95,000,000

$ 95,000,000

$ 95,000,000

$ 95,000,000

District Maintenance Payroll

Mowing, Litter Mgmt, Sight Distance Clearing, Etc.

$ 34,400,000

$ 35,440,000

$ 36,510,000

$ 37,610,000

$ 38,740,000

Section II Total: $ 118,200,000 $ 130,440,000 $ 131,510,000 $ 132,610,000 $ 133,740,000

Grand Total NFA: $ 256,773,354 $ 226,186,219 $ 170,218,474 $ 136,585,025 $ 133,740,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 119

2022-2026 | State Transportation Improvement Program

Operating and Maintenance Expenditures as of March 2022

Statewide and District Contracts plus Expenditures within MPO boundaries

Program Group/Sub Group Est SFY 2022 Spending Est SFY 2023 Spending Est SFY 2024 Spending Est SFY 2025 Spending Est SFY 2026 Spending

Part 2: Federal Aid

Section I - Federal Aid Maintenance Projects

01 - ADA Retrofits

Sidewalk Construction and Repairs $ - $ - $ - $ - $ -

02 - Bicycles and pedestrians program

Bikeway/Bike Path Construction $ - $ - $ - $ - $ -

03 - Bridge

Bridge Maintenance $ 3,805,564 $ 502,504 $ 2,357,142 $ - $ - Bridge Maintenance - Deck Repairs $ - $ - $ 1,038,762 $ 952,198 $ - Bridge Maintenance - Joints $ - $ - $ - $ - $ - Bridge Preservation $ - $ - $ - $ - $ - Bridge Reconstruction/Rehab $ - $ - $ - $ - $ - Drawbridge Maintenance $ - $ - $ - $ - $ - Painting - Structural $ 3,401,816 $ 378,207 $ - $ - $ - Structures Maintenance $ 238,348 $ 2,860,181 $ 1,430,090 $ - $ -

04 - Capacity

Hwy Reconstr - Added Capacity $ - $ - $ - $ - $ -

05 - Facilities

Vertical Construction (Ch 149) $ - $ - $ - $ - $ -

07 - Intersection Improvements

Traffic Signals $ - $ - $ - $ - $ -

08 - Interstate Pavement

Resurfacing Interstate $ - $ - $ - $ - $ -

09 - Intelligent Transportation Systems Program

Intelligent Transportation System $ - $ - $ - $ - $ -

10 - Non-interstate DOT Pavement Program

Milling and Cold Planing $ - $ - $ - $ - $ - Resurfacing $ - $ - $ - $ - $ - Resurfacing DOT Owned Non-Interstate $ - $ - $ - $ - $ -

11 - Roadway Improvements

Asbestos Removal $ - $ - $ - $ - $ - Catch Basin Cleaning $ - $ - $ - $ - $ - Contract Highway Maintenance $ - $ - $ - $ - $ - Crack Sealing $ - $ - $ - $ - $ - Culvert Maintenance $ - $ - $ - $ - $ - Culvert Reconstruction/Rehab $ - $ - $ - $ - $ - Drainage $ - $ - $ - $ - $ - Guard Rail & Fencing $ - $ - $ - $ - $ - Highway Sweeping $ - $ - $ - $ - $ - Landscaping $ - $ - $ - $ - $ - Mowing and Spraying $ - $ - $ - $ - $ - Sewer and Water $ - $ - $ - $ - $ - Tree Trimming $ - $ - $ - $ - $ -

12 - Roadway Reconstruction

Hwy Reconstr - Restr and Rehab $ - $ - $ - $ - $ -

13 - Safety Improvements

Electrical $ - $ - $ - $ - $ - Impact Attenuators $ - $ - $ - $ - $ - Lighting $ 5,557,056 $ 9,931 $ 978,483 $ - $ - Pavement Marking $ - $ - $ - $ - $ - Safety Improvements $ - $ - $ - $ - $ - Sign Installation/Upgrading $ - $ - $ - $ - $ - Structural Signing $ 583,693 $ 99,450 $ - $ - $ - Section I Total: $ 13,586,477 $ 3,850,272 $ 5,804,478 $ 952,198 $ -


Grand Total Federal Aid: $ 13,586,477 $ 3,850,272 $ 5,804,478 $ 952,198 $ -

Draft FFYs 2023-2027 MVMPO TIP April 2022 120

2022-2026 | State Transportation Improvement Program

Operating and Maintenance Expenditures as of March 2022

Statewide and District Contracts

Program Group/Sub Group Est SFY 2022 Spending Est SFY 2023 Spending Est SFY 2024 Spending Est SFY 2025 Spending Est SFY 2026 Spending

Part 1: Non-Federal Aid

Section I - Non Federal Aid Maintenance Projects - State Bondfunds

01 - ADA Retrofits

Sidewalk Construction and Repairs $ 78,719 $ 114,000 $ 52,000 $ - $ -

02 - Bicycles and pedestrians program

Bikeway/Bike Path Construction $ - $ - $ - $ - $ -

03 - Bridge

Bridge Maintenance $ 36,405,775 $ 18,815,892 $ 6,183,863 $ 345,318 $ - Bridge Maintenance - Deck Repairs $ 13,072,586 $ 8,334,358 $ 5,311,045 $ 443,585 $ - Bridge Maintenance - Joints $ 3,793,035 $ 2,804,206 $ 1,208,481 $ 68,432 $ - Bridge Preservation $ 722,817 $ 1,510,000 $ 635,000 $ - $ - Drawbridge Maintenance $ 5,575,223 $ 2,560,174 $ - $ - $ - Painting - Structural $ 4,516,054 $ 1,605,861 $ - $ - $ - Structures Maintenance $ 284,948 $ 142,680 $ - $ - $ -

04 - Capacity

Highway Relocation $ - $ - $ - $ - $ - Hwy Reconstr - Added Capacity $ - $ - $ - $ - $ - Hwy Reconstr - Major Widening $ - $ - $ - $ - $ -

05 - Facilities

Vertical Construction (Ch 149) $ 4,429,468 $ 2,368,944 $ 929,429 $ 114,754 $ -

07 - Intersection Improvements

Traffic Signals $ 3,488,759 $ 2,224,126 $ 1,914,764 $ 94,957 $ -

08 - Interstate Pavement

Resurfacing Interstate $ - $ - $ - $ - $ -

09 - Intelligent Transportation Systems Program

Intelligent Transportation System $ - $ - $ - $ - $ -

10 - Non-interstate DOT Pavement Program

Milling and Cold Planing $ 625,000 $ 695,000 $ 65,316 $ - $ - Resurfacing $ 6,415,673 $ 4,437,466 $ 3,658,730 $ 956,730 $ - Resurfacing DOT Owned Non-Interstate $ 5,203,927 $ 3,704,756 $ 1,345,715 $ 178,272 $ -

11 - Roadway Improvements

Asbestos Removal $ - $ - $ - $ - $ - Catch Basin Cleaning $ 1,966,347 $ 1,455,089 $ 310,866 $ - $ - Contract Highway Maintenance $ 3,055,450 $ 2,387,018 $ 1,154,312 $ 72,342 $ - Crack Sealing $ 1,672,864 $ 1,194,760 $ 706,377 $ 109,600 $ - Culvert Maintenance $ - $ - $ - $ - $ - Culvert Reconstruction/Rehab $ - $ - $ - $ - $ - Drainage $ 6,789,520 $ 5,478,547 $ 1,040,684 $ 103,925 $ - Dredging $ - $ - $ - $ - $ - Guard Rail & Fencing $ 3,429,456 $ 4,146,615 $ 1,845,428 $ 278,197 $ - Highway Sweeping $ 963,234 $ 1,007,278 $ 141,245 $ - $ -

Landscaping $ 233,427 $ 600,000 $ 244,014 $ - $ - Mowing and Spraying $ 1,984,043 $ 822,728 $ 177,992 $ 29,565 $ - Sewer and Water $ 3,904 $ 20,843 $ 10,580 $ - $ - Tree Trimming $ 3,939,855 $ 2,625,059 $ 722,777 $ - $ -

12 - Roadway Reconstruction

Hwy Reconstr - No Added Capacity $ 6,001 $ - $ - $ - $ - Hwy Reconstr - Restr and Rehab $ 646,014 $ 109,047 $ 265,670 $ 177,113 $ - Roadway - Reconstr - Sidewalks and Curbing $ 1,879,857 $ 748,676 $ - $ - $ -

13 - Safety Improvements

Electrical $ 398,549 $ - $ - $ - $ - Impact Attenuators $ 1,068,681 $ 842,686 $ 181,956 $ 47,050 $ - Lighting $ 3,735,830 $ 2,267,423 $ 1,281,166 $ 116,870 $ - Pavement Marking $ 3,332,465 $ 3,166,821 $ 1,623,975 $ 343,891 $ - Safety Improvements $ 227,620 $ 33,595 $ - $ - $ - Sign Installation/Upgrading $ 467,832 $ 573,711 $ 646,592 $ 65,739 $ - Structural Signing $ 359,312 $ 129,607 $ - $ - $ -

Section I Total: $ 120,772,243 $ 76,926,966 $ 31,657,976 $ 3,546,339 $ -

Section II - Non Federal Aid Highway Operations - State Operating Budget Funding

Snow and Ice Operations & Materials

$ 83,800,000

$ 95,000,000

$ 95,000,000

$ 95,000,000

$ 95,000,000

District Maintenance Payroll

Mowing, Litter Mgmt, Sight Distance Clearing, Etc.

$ 34,400,000

$ 35,440,000

$ 36,510,000

$ 37,610,000

$ 38,740,000

Section II Total: $ 118,200,000 $ 130,440,000 $ 131,510,000 $ 132,610,000 $ 133,740,000

Grand Total NFA: $ 238,972,243 $ 207,366,966 $ 163,167,976 $ 136,156,339 $ 133,740,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 121

2022-2026 | State Transportation Improvement Program

Operating and Maintenance Expenditures as of March 2022

Statewide and District Contracts

Program Group/Sub Group Est SFY 2022 Spending Est SFY 2023 Spending Est SFY 2024 Spending Est SFY 2025 Spending Est SFY 2026 Spending

Part 2: Federal Aid

Section I - Federal Aid Maintenance Projects

01 - ADA Retrofits

Sidewalk Construction and Repairs $ - $ - $ - $ - $ -

02 - Bicycles and pedestrians program

Bikeway/Bike Path Construction $ - $ - $ - $ - $ -

03 - Bridge

Bridge Maintenance $ 2,557,469 $ 502,504 $ - $ - $ - Bridge Maintenance - Deck Repairs $ - $ - $ - $ - $ - Bridge Maintenance - Joints $ - $ - $ - $ - $ - Bridge Preservation $ - $ - $ - $ - $ - Bridge Reconstruction/Rehab $ - $ - $ - $ - $ - Drawbridge Maintenance $ - $ - $ - $ - $ - Painting - Structural $ 3,401,816 $ 378,207 $ - $ - $ - Structures Maintenance $ - $ - $ - $ - $ -

04 - Capacity

Hwy Reconstr - Added Capacity $ - $ - $ - $ - $ -

05 - Facilities

Vertical Construction (Ch 149) $ - $ - $ - $ - $ -

07 - Intersection Improvements

Traffic Signals $ - $ - $ - $ - $ -

08 - Interstate Pavement

Resurfacing Interstate $ - $ - $ - $ - $ -

09 - Intelligent Transportation Systems Program

Intelligent Transportation System $ - $ - $ - $ - $ -

10 - Non-interstate DOT Pavement Program

Milling and Cold Planing $ - $ - $ - $ - $ - Resurfacing $ - $ - $ - $ - $ - Resurfacing DOT Owned Non-Interstate $ - $ - $ - $ - $ -

11 - Roadway Improvements

Asbestos Removal $ - $ - $ - $ - $ - Catch Basin Cleaning $ - $ - $ - $ - $ - Contract Highway Maintenance $ - $ - $ - $ - $ - Crack Sealing $ - $ - $ - $ - $ - Culvert Maintenance $ - $ - $ - $ - $ - Culvert Reconstruction/Rehab $ - $ - $ - $ - $ - Drainage $ - $ - $ - $ - $ - Guard Rail & Fencing $ - $ - $ - $ - $ - Highway Sweeping $ - $ - $ - $ - $ - Landscaping $ - $ - $ - $ - $ - Mowing and Spraying $ - $ - $ - $ - $ - Sewer and Water $ - $ - $ - $ - $ - Tree Trimming $ - $ - $ - $ - $ -

12 - Roadway Reconstruction

Hwy Reconstr - Restr and Rehab $ - $ - $ - $ - $ -

13 - Safety Improvements

Electrical $ - $ - $ - $ - $ - Impact Attenuators $ - $ - $ - $ - $ - Lighting $ - $ - $ - $ - $ - Pavement Marking $ - $ - $ - $ - $ - Safety Improvements $ - $ - $ - $ - $ - Sign Installation/Upgrading $ - $ - $ - $ - $ - Structural Signing $ 583,693 $ 99,450 $ - $ - $ - Section I Total: $ 6,542,978 $ 980,161 $ - $ - $ -


Grand Total Federal Aid: $ 6,542,978 $ 980,161 $ - $ - $ -

Draft FFYs 2023-2027 MVMPO TIP April 2022 122

Part C. 2. Transit Program Financial Plan

MVRTA Financial Status

The BIL requires that projects appearing in the TIP must have an identified source of funding that will allow them to be completed within the time period contemplated. Transit projects appearing in the FY 2023-2027 TIP meet this criterion.
The MVRTA is apportioned FTA Section 5307, 5337, and 5339 funds directly based on urbanized area population and the 20 agreed-upon funding splits between other public transit agencies that fall into the Boston MA-NH-RI Urbanized Zone Area (UZA). The following tables depict the resulting financial plan for each of the five fiscal years.

Planning Justification for Transit Projects

The Merrimack Valley region's FFYs 2023-2027 TIP federal aid transit projects are to be carried out using Sections 5307 and Section 5339 funding received by the MVRTA from the FTA with the exception of the provision of operating assistance, the planning justification for the Section 5307 and Section 5339 projects are contained in the Merrimack Valley Regional Transit Authority's Five-Year Capital Program for 2023-2027.
The next table shows the “Operating and Maintenance” vs.” Capital plus Other” transit project costs programmed in this TIP. MVMPO Short Range Transit Planning; MVPC support for transit route development and stops; planning, design and engineering of transit facilities are considered “Other”, and the construction of these facilities are considered “Capital” expenses. The remainder of the transit projects are considered to be “Operating and Maintenance”
projects.
Draft FFYs 2023-2027 MVMPO TIP April 2022 123

Transit Program Financial Plan Table

Merrimack Valley Metropolitan Planning Organization FFYs 2023-2027 Transportation Improvement Program (FTA related funding categories only)

Total Costs including Federal, State and Local*

Fiscal

Year

Federal Programmed Operating/ Maintenance Costs*

(inc. Match)

Federal Programmed Capital and Other

Costs*

(inc. Match)

Total

Federal + Match

Programmed*

Total

Federal + Match Estimated Available Funds*

2023

$19.72

$.97

$20.69

$20.69

2024

$11.77

$17.91

$29.68

$29.68

2025

$7.27

$0.79

$8.06

$8.06

2026

$7.55

$0.23

$7.78

$7.78

2027

$16.39

$5.25

$21.64

$21.64

* Millions of dollars
Draft FFYs 2023-2027 MVMPO TIP April 2022 124

Cost Estimates and Available Resources

Summary by Funding Category

2023 Transit Projects

FTA Funding Program Summaries (Federal dollars only)

Merrimack Valley Regional Transit

Authority

FTA Funding Programs

Estimated Authorizatio n FFY 2023

Regional

TIP

FFY 2023

Balance FFY 2023 (Authorizati on 2023 minus Regional TIP 2023)

Section 5307 Capital and Planning Formula

$7,443,500

$0

$7,443,500

Section 5307 Transit Enhancements

Subtotal

$7,443,500

$0

$7,443,500

Section 5307 Capital and Planning Formula

Carryover

$24,031,315

$14,869,570

$9,161,745

Section 5307 Operating Carryover

Section 5307 Transit Enhancements

Carryover

Subtotal

$24,031,315

$14,869,570

$9,161,745

Section 5307 Total

$31,474,815

$14,869,570

$16,605,245

CARES Act Funding

$0

Section 5309 Bus

Section 5309 Fixed Guideway

Section 5309 Total

Section 5310 Elderly and Disabled

Section 5339 Bus and Bus Related

Equipment and Facilities

$960,000

$960,000

$0

Federal Aid Total

$32,434,815

$15,829,570

$16,605,245

Other Transit Funding (Non-Federal Aid)

$0

$0

$0

Draft FFYs 2023-2027 MVMPO TIP April 2022 125

Cost Estimates and Available Resources

Summary by Funding Category

2024 Transit Projects

FTA Funding Program Summaries (Federal dollars only)

Merrimack Valley Regional Transit

Authority

FTA Funding Programs

Estimated Authorization FFY 2024

Regional

TIP

FFY 2024

Balance FFY

2024 (Authorization

2024 minus

Regional TIP

2024)

Section 5307 Capital and Planning

Formula

$7,815,675

$860,085

$6,955,590

Section 5307 Transit Enhancements

Subtotal

$7,815,675

$860,085

$6,955,590

Section 5307 Capital and Planning

Formula Carryover

$16,605,245

$16,605,245

$0

Section 5307 Operating Carryover

Section 5307 Transit Enhancements

Carryover

Subtotal

$16,605,245

$16,605,245

$0

Section 5307 Total

$24,420,920

$17,465,330

$6,955,590

Section 5307(h) Passenger Ferry Grant

600,000

600,000

$0

Section 5309 Bus

Section 5309 Fixed Guideway

Section 5309 Total

Section 5310 Elderly and Disabled

Section 5339 Bus and Bus Related

Equipment and Facilities

$3,840,000

$3,840,000

$0

Federal Aid Total

$28,860,920

$21,905,330

$6,955,590

Other Transit Funding (Non-Federal Aid)

$0

$0

$0

Draft FFYs 2023-2027 MVMPO TIP April 2022 126

Cost Estimates and Available Resources

Summary by Funding Category

2025 Transit Projects

FTA Funding Program Summaries (Federal dollars only)

Merrimack Valley Regional Transit

Authority

FTA Funding Programs

Estimated Authorization FFY 2025

Regional

TIP

FFY 2025

Balance FFY

2025 (Authorizatio n 2025 minus Regional TIP

2025)

Section 5307 Capital and Planning Formula

$8,206,450

$0

$8,206,450

Section 5307 Transit Enhancements

Subtotal

$8,206,450

$0

$8,206,450

Section 5307 Capital and Planning Formula

Carryover

$6,955,590

$6,013,560

$942,030

Section 5307 Operating Carryover

Section 5307 Transit Enhancements

Carryover

Subtotal

$6,955,590

$6,013,560

$942,030

Section 5307 Total

$15,162,040

$6,013,560

$9,148,480

Section 5309 Bus

Section 5309 Fixed Guideway

Section 5309 Total

Section 5310 Elderly and Disabled

Section 5339 Bus and Bus Related

Equipment and Facilities

Federal Aid Total

$15,162,040

$6,013,560

$9,148,480

Other Transit Funding (Non-Federal Aid)

$0

$0

$0

Draft FFYs 2023-2027 MVMPO TIP April 2022 127

Cost Estimates and Available Resources

Summary by Funding Category

2026 Transit Projects

FTA Funding Program Summaries (Federal dollars only)

Merrimack Valley Regional Transit

Authority

FTA Funding Programs

Estimated Authorization FFY 2026

Regional

TIP

FFY 2026

Balance FFY

2026 (Authorization

2026 minus

Regional TIP

2026)

Section 5307 Capital and Planning Formula

$8,616,780

$0

$8,616,780

Section 5307 Transit Enhancements

Subtotal

$8,616,780

$0

$8,616,780

Section 5307 Capital and Planning Formula

Carryover

$9,148,480

$5,664,490

$3,483,990

Section 5307 Operating Carryover

Section 5307 Transit Enhancements

Carryover

Subtotal

$9,148,480

$5,664,490

$3,483,990

Section 5307 Total

$17,765,260

$5,664,490

$12,100,770

Section 5309 Bus

Section 5309 Fixed Guideway

Section 5309 Total

Section 5310 Elderly and Disabled

Section 5339 Bus and Bus Related

Equipment and Facilities

Federal Aid Total

$17,765,260

$5,664,490

$12,100,770

Other Transit Funding (Non-Federal Aid)

$125,000

$125,000

$0

Draft FFYs 2023-2027 MVMPO TIP April 2022 128

Summary of Transit Funding Categories

Cost Estimates and Available Resources

Summary by Funding Category

2027 Transit Projects

FTA Funding Program Summaries (Federal dollars only)

Merrimack Valley Regional Transit

Authority

FTA Funding Programs

Estimated Authorization FFY 2027

Regional TIP FFY 2027

Balance FFY

2027 (Authorization

2027 minus

Regional TIP

2027)

Section 5307 Capital and Planning Formula

$9,047,620

$9,047,620

Section 5307 Transit Enhancements

Subtotal

$9,047,620

$9,047,620

Section 5307 Capital and Planning Formula

Carryover

$12,100,770

$8,733,060

$3,367,710

Section 5307 Operating Carryover

Section 5307 Transit Enhancements

Carryover

Subtotal

$12,100,770

$8,733,060

$3,367,710

Section 5307 Total

$21,148,390

$8,733,060

$12,415,330

Section 5309 Bus

Section 5309 Fixed Guideway

Section 5310 Elderly and Disabled

Other Federal Transit

$8,000,000

$8,000,000

0

Federal Aid Total

$29,148,390

$16,733,060

$12,415,330

Other Transit Funding (Non-Federal Aid)

$125,000

$125,000

$0

Draft FFYs 2023-2027 MVMPO TIP April 2022 129

MVRTA Transit Operations and Maintenance Summary Table

State Fiscal Year 2021 (Actual), 2022 (Adopted Budget), and 2023 to 2027 (Projected)

The numbers below represent actual numbers for the previous year, the current year budget/forecast approved by the MVRTA Advisory Board, and Projections for the out-years. These numbers indicate that there are sufficient revenues projected to meet the operating needs of the MVRTA.

Audit

Adopted

Budget

Projected

Projected

Projected

Projected

Projected

Operating

Revenue

Actual

Jan 2022

Revised

Yr One

Yr Two

Yr Three

Yr Four

Yr Five

2021

2022

2023

2024

2025

2026

2027

Farebox

$561,308

$665,420

$0

$0

$0

$0

$0

Section 5307

$7,443,500

$7,815,675

$8,206,450

$8,616,780

$9,047,620

Section 5311

CARES

$6,036,070

$6,512,135

$3,811,895

$0

$0

$0

$0

CMAQ/TDM

Draft FFYs 2023-2027 MVMPO TIP April 2022 130

MVRTA Transit Operations and Maintenance Summary Table

State Fiscal Year 2021 (Actual), 2022 (Adopted Budget), and 2023 to 2027 (Projected) (Continued)

Audit

Adopted

Budget

Projected

Projected

Projected

Projected

Projected

Operating

Revenue

Actual

Jan 2022 Re- vised

Yr One

Yr Two

Yr Three

Yr Four

Yr Five

2021

2022

2023

2024

2025

2026

2027

Advertising

$25,000

$25,000

$75,000

$75,000

$75,000

$75,000

$75,000

Interest

Income

$1,049

$1,250

$2,500

$2,500

$2,500

$2,500

$2,500

Rental

Income

State Contract Assistance*

$7,509,670

$7,697,410

$8,120,768

$8,567,410

$9,038,617

$9,535,741

$10,060,207

Local

Assessment

$4,144,670

$4,481,940

$4,593,989

$4,708,838

$4,826,559

$4,947,223

$5,070,904

Other: 5339

& other Discretionary funds

$357,000

$518,500

$1,200,000

$550,000

$0

$0

$5,000,000

Total

Revenue

$18,015,585

$19,901,655

$25,247,651

$21,719,423

$22,149,126

$23,177,244

$29,256,231

Draft FFYs 2023-2027 MVMPO TIP April 2022 131

MVRTA Transit Operations and Maintenance Summary

State Fiscal Year 2021 (Actual), 2022 (Adopted Budget), and 2023 to 2027 (Projected) (Continued)

Operating

Expenses **

Actual

Jan 2022

Revised

Yr One

Yr Two

Yr Three

Yr Four

Yr Five

2021

2022

2023

2024

2025

2026

2027

Total (See

Below)

$18,015,585

$19,901,655

$25,247,651

$21,719,423

$22,149,126

$23,177,244

$29,256,231

Footnotes:

* Operating assistance provided by the State
** Description of Operating Expenses: Salaries and Wages; Fringe Benefits: Legal, Accounting and Professional Services; Promotion/Marketing; Insurance; Equipment Leases and Rentals; Real Property Leases and Rentals; Non-capitalized Maintenance/Repair; Fuel costs; Tire costs; Office Supplies and Equipment; Interest expense; Utilities; Management Fees;
Travel and Training; and Other miscellaneous expense items.
Draft FFYs 2023-2027 MVMPO TIP April 2022 132

Part C. 3. Status on Implementation of FFY 2022 TIP Projects

FFY 2022 Highway Project List

Regional Target Projects

Project

ID

Location

Project Description

Funding

Category

Total Pro- grammed Funds

Project Status

609509

Lawrence

Lawrence– Intersection Improvements at Merrimack Street and South Broadway (Route 28)

STBG

$1,502,354

FFY 2022.

610923

Lawrence

Lawrence- Intersection Reconstruction at

Marston Street & East Haverhill Street

STBG

$1,658,011

FFY 2022.

S12107

MVRTA Flex to FTA to Replace Yr 2011

Buses with New Clean Diesel Buses Order

1/2022 Delivery 6/2023 (6 of 8)

STBG

$2,983,200

Pending Flex funds received

S12108

MVRTA Flex to FTA to Replace Yr 2011

Buses with New Hybrid Buses Order 1/2022

Delivery 6/2023 (2 of 8)

STBG

$1,401,200

Pending Flex funds received

S12109

MVRTA Flex to FTA to Repower five (5) 2015

Transit Buses

STBG

$314,185

Pending Flex funds received

S12110

MVRTA Flex to FTA to Repower five (5) 2016

Transit Buses

STBG

$328,560

Pending Flex funds received

S12111

MVRTA Flex to FTA to Upgrade CAD/AVL and

Automated Vehicle Announcement (AVA)

STBG

$946,210

Pending Flex funds received

Draft FFYs 2023-2027 MVMPO TIP April 2022 133

Part C. 3. Status on Implementation of FFY 2022 TIP Projects (Cont.)

Transit Projects

Division ID

Project Title

Federal Funds

RTACAP

SCA

Local

Funds

Total

Status

RTD0009672

MVRTA Operating

Assistance

$644,945

$0

$644,945

$0

$1,289,890

Ongoing

RTD0009669

MVRTA Preventative Mainte- nance

$2,889,070

$0

$722,265

$0

$3,611,335

Ongoing

RTD0009671

MVMPO Short Range Transit

Planning

$80,000

$0

$0

$20,000

$100,000

Ongoing

RTD0009673

MVRTA Replace 9 Model Yr

2009 35’ buses delivery 2022

3,269,223

1,188,807

4,458,030

Ordered, De- livered in February, in process of registration

RTD0010053

MVRTA HQ Facility Repairs

$545,600

$136,400

$0

$0

$682,000

Ongoing

RTD0009680

MVRTA Replace 1 model year

2016 supervisory vehicle

39,095

9,775

$48,870

Complete

RTD0009670

MVRTA ADA Paratransit Ser- vice

$1,441,305

$0

$360,325

$0

$1,801,630

Ongoing

RTD0010107

MVRTA Riverbank Stabiliza- tion Construction

$2,036,800

$509,200

$2,546,000

Under Con- struction

Draft FFYs 2023-2027 MVMPO TIP April 2022 134

Part C. 3. Status on Implementation of FFY 2022 TIP Projects (Cont.)

Transit Projects (Cont.)

Division ID

Project Title

Federal

Funds

RTACAP

TDC

Total

Status

RTD0010061 (Non- Federal Aid)

MVRTA Acquire Bus Plus Payment

Software

$40,735

$40,735

Canceled due to fare free policy

S12107

MVRTA Flex to FTA to Replace Yr

2011 Buses with New Clean Die- sel Buses Order 1/2022 Delivery

6/2023 (6 of 8)

$2,386,560**

$596,640

$2,983,200**

Ordered

S12108

MVRTA Flex to FTA to Replace Yr

2011 Buses with New Hybrid

Buses Order 1/2022 Delivery

6/2023 (2 of 8)

$1,120,960**

$280,240

$1,401,200**

Ordered

S12109

MVRTA Flex to FTA to Repower five

(5) 2015 Transit Buses

$251,350**

$62,835*

$251,350*

Ordered

S12110

MVRTA Flex to FTA to Repower five

(5) 2016 Transit Buses

$262,850**

$65,710*

$262,850*

Ordered

S12111

MVRTA Flex to FTA to Upgrade CAD/AVL and Automated Vehicle An- nouncement (AVA)

$756,970**

$189,240*

$756,970*

Pending Flex funds received

* TDC (Transportation Development Credits) are not included in totals.
** The Federal dollars are being Flexed to FTA from Highway Regional Target Funding
Draft FFYs 2023-2027 MVMPO TIP April 2022 135

Part C. 4. Air Quality Conformity

Air Quality Conformity Determination

Merrimack Valley Metropolitan Planning Organization (MVMPO) FFY 2023-2027 Transportation Improvement Program

This section documents the latest air quality conformity determination for the 1997 ozone Na- tional Ambient Air Quality Standards (NAAQS) in the Merrimack Valley MPO region. It covers the applicable conformity requirements according to the latest regulations, regional designa- tion status, legal considerations, and federal guidance. Further details and background infor- mation are provided below:

Introduction

The 1990 Clean Air Act Amendments (CAAA) require metropolitan planning organizations within nonattainment and maintenance areas to perform air quality conformity determinations prior to the approval of Long-Range Transportation Plans (LRTPs) and Transportation Im- provement Programs (TIPs), and at such other times as required by regulation. Clean Air Act (CAA) section 176(c) (42 U.S.C. 7506(c)) requires that federally funded or approved highway and transit activities are consistent with (“conform to”) the purpose of the State Implementa- tion Plan (SIP). Conformity to the purpose of the SIP means that means Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) funding and approvals are given to highway and transit activities that will not cause or contribute to new air quality viola- tions, worsen existing violations, or delay timely attainment of the relevant NAAQS or any in- terim milestones (42 U.S.C. 7506(c)(1)). EPA’s transportation conformity rules establish the criteria and procedures for determining whether metropolitan transportation plans, transporta- tion improvement programs (TIPs), and federally supported highway and transit projects con- form to the SIP (40 CFR Parts 51.390 and 93).
A nonattainment area is one that the U.S. Environmental Protection Agency (EPA) has desig- nated as not meeting certain air quality standards. A maintenance area is a nonattainment area that now meets the standards and has been re-designated as maintaining the standard. A conformity determination is a demonstration that plans, programs, and projects are con- sistent with the State Implementation Plan (SIP) for attaining the air quality standards. The CAAA requirement to perform a conformity determination ensures that federal approval and funding go to transportation activities that are consistent with air quality goals.

Legislative and Regulatory Background

The entire Commonwealth of Massachusetts was previously classified as nonattainment for ozone, and was divided into two nonattainment areas. The Eastern Massachusetts ozone nonattainment area included Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket,
Draft FFYs 2023-2027 MVMPO TIP April 2022 136
Norfolk, Plymouth, Suffolk, and Worcester counties. Berkshire, Franklin, Hampden, and Hampshire counties comprised the Western Massachusetts ozone nonattainment area. With these classifications, the 1990 Clean Air Act Amendments (CAAA) required the Common- wealth to reduce its emissions of volatile organic compounds (VOCs) and nitrogen oxides (NOx), the two major precursors to ozone formation to achieve attainment of the ozone standard.
The 1970 Clean Air Act defined a one-hour national ambient air quality standard (NAAQS) for ground-level ozone. The 1990 CAAA further classified degrees of nonattainment of the one- hour standard based on the severity of the monitored levels of the pollutant. The entire com- monwealth of Massachusetts was classified as being in serious nonattainment for the one- hour ozone standard, with a required attainment date of 1999.The attainment date was later extended, first to 2003 and a second time to 2007.
In 1997, the EPA proposed a new, eight-hour ozone standard that replaced the one- hour standard, effective June 15, 2005. Scientific information had shown that ozone could affect human health at lower levels, and over longer exposure times than one hour. The new stand- ard was challenged in court, and after a lengthy legal battle, the courts upheld it. It was final- ized in June 2004.The eight-hour standard is 0.08 parts per million, averaged over eight
hours and not to be exceeded more than once per year. Nonattainment areas were again fur- ther classified based on the severity of the eight-hour values. Massachusetts as a whole was classified as being in moderate nonattainment for the eight-hour standard, and was sepa- rated into two nonattainment areas—Eastern Massachusetts and Western Massachusetts.
In March 2008, EPA published revisions to the eight-hour ozone NAAQS establishing a level of 0.075 ppm, (March 27, 2008; 73 FR 16483). In 2009, EPA announced it would reconsider this standard because it fell outside of the range recommended by the Clean Air Scientific Advisory Committee. However, EPA did not take final action on the reconsideration so the standard would remain at 0.075 ppm.
After reviewing data from Massachusetts monitoring stations, EPA sent a letter on December
16, 2011 proposing that only Dukes County would be designated as nonattainment for the new proposed 0.075 ozone standard. Massachusetts concurred with these findings.
On May 21, 2012, (77 FR 30088), the final rule was published in the Federal Register, defin- ing the 2008 NAAQS at 0.075 ppm, the standard that was promulgated in March 2008. A sec- ond rule published on May 21, 2012 (77 FR 30160), revoked the 1997 ozone NAAQS to oc- cur one year after the July 20, 2012 effective date of the 2008 NAAQS.
Also on May 21, 2012, the air quality designations areas for the 2008 NAAQS were pub- lished in the Federal Register. In this Federal Register, the only area in Massachusetts that was designated as nonattainment is Dukes County. All other Massachusetts counties were
Draft FFYs 2023-2027 MVMPO TIP April 2022 137
designated as attainment/unclassified for the 2008 standard. On March 6, 2015, (80 FR
12264, effective April 6, 2015) EPA published the Final Rulemaking, “Implementation of the
2008 National Ambient Air Quality Standards (NAAQS) for Ozone: State Implementation Plan Requirements; Final Rule.” This rulemaking confirmed the removal of transportation con- formity to the 1997 Ozone NAAQS and the replacement with the 2008 Ozone NAAQS, which (with actually a stricter level of allowable ozone concentration than the 1997 standards) clas- sified Massachusetts as “Attainment/unclassifiable” (except for Dukes County).
However, on February 16, 2018, the United States Court of Appeals for the District of Colum- bia Circuit in South Coast Air Quality Mgmt. District v. EPA (“South Coast II,” 882 F.3d 1138) held that transportation conformity determinations must be made in areas that were either nonattainment or maintenance for the 1997 ozone NAAQS and attainment for the 2008
ozone NAAQS when the 1997 ozone NAAQS was revoked. Conformity determinations are required in these areas after February 16, 2019. On November 29, 2018, EPA issued Trans- portation Conformity Guidance for the South Coast II Court Decision (EPA-420-B-18-050, No- vember 2018) that addresses how transportation conformity determinations can be made in these areas. According to the guidance, both Eastern and Western Massachusetts, along
with several other areas across the country, are now defined as “orphan nonattainment ar- eas” – areas that were designated as nonattainment for the 1997 ozone NAAQS at the time of its revocation (80 FR 12264, March 6, 2015) and were designated attainment for the 2008 ozone NAAQS in EPA’s original designations rule for this NAAQS (77 FR 30160, May 21,
2012).

Current Conformity Determination

After 2/16/19, as a result of the court ruling and the subsequent federal guidance, transporta- tion conformity for the 1997 NAAQS– intended as an “anti-backsliding” measure – now ap- plies to both of Massachusetts’ orphan areas. Therefore, a conformity determination was made for the 1997 ozone NAAQS on the 2020-2040 Regional Transportation Plans. This conformity determination was finalized in July 2019 following each MPO’s previous endorse- ment of their regional transportation plan, and approved by the Massachusetts Divisions of FHWA and FTA on October 15, 2019. This conformity determination continues to be valid for the Merrimack Valley MPO FFY 2023-2027 Transportation Improvement Program, and Mas- sachusetts’ FFY 2023-2027 STIP, as each is developed from the conforming 2020-2040 Re- gional Transportation Plans.
The transportation conformity regulation at 40 CFR 93.109 sets forth the criteria and proce- dures for determining conformity. The conformity criteria for TIPs and RTPs include: latest planning assumptions (93.110), latest emissions model (93.111), consultation (93.112), trans- portation control measures (93.113(b) and (c), and emissions budget and/or interim emissions
(93.118 and/or 93.119).
Draft FFYs 2023-2027 MVMPO TIP April 2022 138
For the 1997 ozone NAAQS areas, transportation conformity for TIPs and RTPs for the 1997 ozone NAAQS can be demonstrated without a regional emissions analysis, per 40 CFR
93.109(c). This provision states that the regional emissions analysis requirement applies one
year after the effective date of EPA’s nonattainment designation for a NAAQS and until the effective date of revocation of such NAAQS for an area. The 1997 ozone NAAQS revocation was effective on April 6, 2015, and the South Coast II court upheld the revocation. As no re- gional emission analysis is required for this conformity determination, there is no requirement to use the latest emissions model, or budget or interim emissions tests.
Therefore, transportation conformity for the 1997 ozone NAAQS for the Merrimack Valley MPO FFY 2023-2027 Transportation Improvement Program and 2020-2040 Regional Transportation Plans can be demonstrated by showing that remaining requirements in Table 1 in 40 CFR
93.109 have been met. These requirements, which are laid out in Section 2.4 of EPA’s guid-
ance and addressed below, include:

Latest planning assumptions (93.110)

Consultation (93.112)

Transportation Control Measures (93.113)

Fiscal Constraint (93.108)

Latest Planning Assumptions:

The use of latest planning assumptions in 40 CFR 93.110 of the conformity rule generally ap- ply to regional emissions analysis. In the 1997 ozone NAAQS areas, the use of latest plan- ning assumptions requirement applies to assumptions about transportation control measures (TCMs) in an approved SIP (See following section on Timely Implementation of TCMs).

Consultation:

The consultation requirements in 40 CFR 93.112 were addressed both for interagency consul- tation and public consultation. Interagency consultation was conducted with FHWA, FTA, US EPA Region 1, MassDEP, and the Massachusetts MPOs on March 6, 2019 to discuss the latest conformity-related court rulings and resulting federal guidance. Regular and recurring inter- agency consultations have been held since on an (at least) annual schedule, with the most recent conformity consultation held on April 27, 2022. This ongoing consultation is conducted in accordance with the following:

Massachusetts’ Air Pollution Control Regulations 310 CMR 60.03 “Conformity to the State Implementation Plan of Transportation Plans, Programs, and Projects Devel- oped, Funded or Approved Under Title 23 USC or the Federal Transit Act”

The Commonwealth of Massachusetts Memorandum of Understanding among the

Massachusetts Department of Transportation, Massachusetts Department of
Draft FFYs 2023-2027 MVMPO TIP April 2022 139
Environmental Protection, Massachusetts Metropolitan Planning Organizations, and Regional Transit Authorities, titled The Conduct of Air Quality Planning and Coordina- tion for Transportation Conformity (dated September 16, 2019)
Public consultation was conducted consistent with planning rule requirements in 23 CFR 450.
Title 23 CFR Section 450.324 and 310 CMR 60.03(6)(h) requires that the development of the TIP, RTP, and related certification documents provide an adequate opportunity for public review and comment. Section 450.316(b) also establishes the outline for MPO public partici- pation programs. The Merrimack Valley MPO's Public Participation Plan was formally adopted in 2017. It can be found on the Merrimack Valley Planning Commission website at https://mvpc.org/wp-content/uploads/MVMPO-final-PPP-as-Amended-through-March-2017-
1.pdf. The Public Participation Plan ensures that the public will have access to the TIP and all supporting documentation, provides for public notification of the availability of the TIP and the public's right to review the document and comment thereon, and provides a 21-day public re- view and comment period prior to the adoption of the TIP and related certification documents.
The public comment period for this conformity determination commenced on May 4, 2022. Dur- ing the 21-day public comment period, any comments received were incorporated into this Plan. This allowed ample opportunity for public comment and MPO review of the draft docu- ment. The public comment period will close on May 24, 2022 and subsequently, the Merrimack Valley MPO is expected to endorse this air quality conformity determination before June 2,
2022. These procedures comply with the associated federal requirements.

Timely Implementation of Transportation Control Measures:

Transportation Control Measures (TCMs) have been required in the SIP in revisions submit- ted to EPA in 1979 and 1982. All SIP TCMs have been accomplished through construction or through implementation of ongoing programs. All of the projects have been included in the Region's Transportation Plan (present or past) as recommended projects or projects requiring further study.

Fiscal Constraint:

Transportation conformity requirements in 40 CFR 93.108 state that TIPs and transportation plans and must be fiscally constrained consistent with DOT’s metropolitan planning regula- tions at 23 CFR part 450. The Merrimack Valley MPO 2023-2027 Transportation Improve- ment Program and 2020-2040 Regional Transportation Plan are fiscally constrained, as demonstrated in this document.
In summary and based upon the entire process described above, the Merrimack Valley MPO
has prepared this conformity determination for the 1997 Ozone NAAQS in accordance with
EPA’s and Massachusetts’ latest conformity regulations and guidance. This conformity
Draft FFYs 2023-2027 MVMPO TIP April 2022 140
determination process demonstrates that the FFY 2023-2027 Transportation Improvement Program and the 2020-2040 Regional Transportation Plan meet the Clean Air Act and Trans- portation Conformity Rule requirements for the 1997 Ozone NAAQS, and have been pre- pared following all the guidelines and requirements of these rules during this time period.
Therefore, the implementation of the Merrimack Valley MPO’s FFY 2023-2027 Transportation
Improvement Program and the 2020-2040 Regional Transportation Plan are consistent with the air quality goals of, and in conformity with, the Massachusetts State Implementation Plan.
Draft FFYs 2023-2027 MVMPO TIP April 2022 141

Part C. 5. Special Efforts - ADA

Projects Required for Implementation of ADA

Another requirement of 23 CFR 450.324 is that projects required for the implementation of the Americans with Disabilities Act (ADA) should be so marked. There are no projects in this TIP listing that are required for the implementation of the Americans with Disabilities Act and therefore no projects are marked as such. There are projects to replace existing accessible transit vehicles with new accessible transit vehicles, but these are replacements not implementations.

Part C. 6. Environmental Justice

Environmental Justice from a transportation perspective is the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation, and enforcement of transportation laws, regulations, and policies.

"Each Federal agency shall make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects of its programs, policies, and activities on minority populations and low-income populations."

MVMPO Merrimack Valley Transportation Committee Equity Working Group

The MVMPO Merrimack Valley Transportation Committee’s (MVTC) purpose is to advise the MVMPO and participate in the MVMPO region’s federally certified transportation planning process. Its membership provides for the involvement of local government officials, transportation professionals, transportation providers, and individuals experienced in economic development, freight, commuter rail, smart growth, environmental issues, regional planning, and other interest groups, ensuring broad representation and a geographical balance of its participants.

MVTC Equity Working Group

The MVMPO is responsible for promoting, securing and evaluating public involvement in its transportation planning process. In particular, it is responsible for identifying and seeking meaningful participation of the region’s minority and low-income (Environmental Justice)
populations – and in working to reduce participation barriers for such populations.
Draft FFYs 2023-2027 MVMPO TIP April 2022 142
The MVMPO’s established EJ process includes identification of Census-based statistical areas within its region where:

a) the percentage of minority populations exceeds the average percentage of minority

population for the region as a whole;

b) household incomes are 65% or less of area median income (AMI), and

c) there are concentrations of households with limited English proficiency (LEP).

The MVMPO established an Equity Working Group to provide the MVMPO members and staff with the perspectives of individuals and organizations representing low-income and minority populations. It is also an opportunity for MVMPO staff and EJ stakeholders to exchange information, evaluate policies, plans and projects, and generate ideas for future projects. The MVMPO staff regularly consults with members of the Equity Working Group.

To help inform the work of the MVMPO, it is helpful to have members of the Equity Working Group who have individual and/or collective knowledge and expertise in working with EJ populations on:

a) Disabilities b) Education

c) English proficiency d) Elder Affairs

e) Faith-based community service

f) Minority advocacy

g) Neighborhood organization

h) Non-profit community development i) Public Health

j) Veterans Affairs

k) Workforce training and development

Part C. 7. Equity Analysis

The following tables illustrate a geographic and social equity analysis of highway funding in the Merrimack Valley MPO region. Haverhill, Lawrence and Methuen are designated as Title VI and Environmental Justice (EJ) communities. The Title VI communities have tracts with higher than average percentage of minorities than the regional average percentage and the same three communities are EJ communities with lower than average median income in
some census tracts.
Draft FFYs 2023-2027 MVMPO TIP April 2022 143
The following table shows the percent of population in Title VI / EJ communities relative to the percent of highway funding programmed in the 2023 to 2027 TIP.

Region Population (ACS 15 to 19)

Percent of Total

Population

TIP Project In- vestment

Percent of Projects by To- tal Investment

Within or Adja-

cent to Title VI / EJ community

200,647

57%

$337,381,396

59%

Outside Title VI

/ EJ community

153,349

43%

$231,725,652

41%

Total

353,996

100%

$569,107,048

100%

This table illustrates 59% of the investment is in or adjacent to Title VI and EJ communities, which is consistent with 57% of the population living in those communities. One project, the Andover- Bridge Rehabilitation, A-09-036, I-495 over St 28 (SB), A-09-037, I-495 over B&M and MBTA, A-09-041, I-495 over St 28 (NB) (# 606522) costing $173,075,000 is 30% of the TIP investment dollars and is adjacent to and one end extends into Lawrence, a Title VI and EJ community. The project is adjacent to Lawrence therefore the funding for this project is split between Andover (not a Title VI or EJ community) and Lawrence. The Lawrence popula- tion will benefit from and is served by this project.
Persons with Limited English Proficiency (LEP) are those who self-report on the Census as speaking English ‘less than very well’. USDOT guidance defines “Safe harbor” languages as those non-English languages that are spoken by LEP persons who make up at least 5% of the population, or 1,000 individuals, whichever is less. Using this definition for LEP people ages 5+ living in the region the number of LEP individuals exceeds the 1,000-person thresh- old in Spanish (32,513 people) and Chinese (1,124 people). The LEP persons in these two languages represent 83% of all LEP people in the region. Communities with more than 1,000 individuals whose “Safe-harbor” language is Spanish are Haverhill (3,010 people), Lawrence (25,355 people) and Methuen (3,352 people). Andover has the highest number of individuals (630 people) whose “Safe-harbor” language is Chinese. Therefore these 4 communities are
considered LEP communities.
Draft FFYs 2023-2027 MVMPO TIP April 2022 144
The following table shows the percent of population age 5+ in LEP communities relative to the percent of Federal highway funding programmed in the 2023 to 2027 TIP.

Region

Population Age

5+ (ACS 15 to

19)

Percent of Total

Population Age

5+ (ACS 15 to

19)

TIP Project

Investment

Percent of Projects by To- tal Investment

Within LEP

community

215,364

64%

497,930,332

87%

Outside LEP

community

118,749

36%

71,176,716

13%

Total

334,113

100%

$569,107,048

100%

This table illustrates consistency between the percent of population in LEP areas and the per- cent of funding in those areas.
All of the Federal transit funding (100%) is considered to benefit Title VI, EJ and LEP commu- nities because all of the MVRTA fixed routes originate in the Title VI / EJ / LEP communities
of Haverhill or Lawrence, or provide connections to these routes. The paratransit service also
provides access to and from the Title VI, EJ and LEP communities.
All but one of the MVMPO region communities have had, or are programmed to have, Feder- ally funded projects from 2018 to 2027. (Looking at the tables that follow West Newbury, which is not a Title VI / EJ or LEP community, does not have a federally funded project in the ten-year period, however it did have a Federally funded project in 2015.
The tables on the following pages show the projects included in the analysis for FFYs 2023 to
2027 and a summary chart showing the number of projects and the funding by community, and whether the community is a Title VI (high percentage of minorities), an EJ (high percent- age of low-income households) and/or LEP community. This is followed by a table and analy- sis chart for projects programmed in FFYs 2018 to 2022.
For Title VI and EJ communities, the results show that for FFYs 2023 to 2027, 42% of the to- tal number of projects are in Title VI and EJ communities. Considering the data for percent of funding, 59% of the funding is in Title VI and EJ communities. 57% of the population lives in those communities.
For LEP communities, the results show that for FFYs 2023 to 2027, 58% of the total number of projects are in LEP communities. Considering the data for percent of funding, 87% of the funding is in LEP communities.
Draft FFYs 2023-2027 MVMPO TIP April 2022 145
For Title VI and EJ communities, the results show that for FFYs 2018 to 2022, 59% of the to- tal number of projects are in Title VI communities and EJ communities. Considering the data for percent of funding, 66% of the funding is in Title VI communities and EJ communities.
For LEP communities, the results show that for FFYs 2018 to 2022, 59% of the total number of projects are in LEP communities. Considering the data for percent of funding, 66% of the funding is in LEP communities.
All of the Transit funding (100%) is considered to benefit Title VI, EJ and LEP communities because all of the MVRTA fixed routes originate in Haverhill, or in Lawrence, or provide con- nections to these routes. The paratransit service also provides access to and from the Title VI and EJ communities. The total federal aid transit funding for FFYs 2023 to 2027 is
$87,602,565. The total federal transit funding for FFYs 2018 to 2022 is $46,317,028. There
are two mappable transit projects in the FFYs 2023 to 2027 TIP. MVRTA-1 New Transit Hub and Maintenance Facility at Bradford Station and MVRTA-2 McGovern Transportation Center Upgrades. There are two mappable transit projects in the FFYs 2018 to 2022 project list. The MVRTA Headquarters (HQ) Facility Repairs project is labeled MVRTA – C4 and the Riverbank Stabilization project is labeled MVRTA – C5. The maps also show the MVRTA fixed route bus system.

Equity Analysis Maps

MVMPO: FFYs 2023 to 2027 Statewide and Regional Target Highway Projects overlaid on
Low Income and Minority Tracts
MVMPO: FFYs 2023 to 2027 Transit Projects and MVRTA Bus Routes overlaid on Low In- come and Minority Tracts
MVMPO: FFYs 2018 to 2022 Statewide and Regional Target Highway Projects overlaid on
Low Income and Minority Tracts
MVMPO: FFYs 2018 to 2022 Transit Projects and MVRTA Bus Routes overlaid on Low In- come and Minority Tracts
Draft FFYs 2023-2027 MVMPO TIP April 2022 146

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis

Community

Project Num- ber

Project

Description

Total

Funding Pro- grammed

FFY

Title VI Com mu- nity

EJ Com mu- nity

LEP Com mu- nity

Amesbury

611977

Amesbury– River- walk Connector to the Salisbury Point Ghost Trail

$2,448,760

2027

No

No

No

Andover

612193

Andover- Bridge

Preservation, A-09-

022, I-93 over Merri- mack River

$38,102,400

2025

No

No

Yes

Andover

606522

Andover- Bridge Re- hab., I-495 over Rt.

28 and RR

$173,075,000*

2023 to

2026

Yes*

Yes*

Yes*

Andover

612143

Andover– Bridge Re- placement, A-09-

015, Tewksbury Street over MBTA/BMRR

$17,383,839

2025

No

No

Yes

Andover/ Tewksbury

612045

Andover-Tewksbury- Interstate Mainte- nance and related work on I-93

$18,525,197

2025

No

No

Yes

Georgetown/ Boxford

607541

Georgetown/ Boxford

Border to Boston

Trail

$2,520,436

2024

No

No

No

* Project is adjacent to Lawrence and project extents go into Lawrence. The Lawrence popu- lation is served by and benefits from this project therefore one half of the total project cost =
$86,537,500 is being attributed to Lawrence for this analysis.
Draft FFYs 2023-2027 MVMPO TIP April 2022 147

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis (Cont.)

Community

Project Num- ber

Project

Description

Total

Funding Pro- grammed

FFY

Title VI Com mu- nity

EJ Com mu- nity

LEP Com mu- nity

Georgetown/ Newbury

607542

Georgetown/ New- bury Border to Bos- ton Trail

$6,798,000

2026

No

No

No

Groveland

S12208

Groveland- Improve- ments at Dr. Elmer Bagnall Elementary School

$1,858,080

2026

No

No

No

Haverhill

609466

Haverhill- Bridge Re- placement I-495 over Merrimack (H-12-

040)

$96,087,420

2024 to

2027

Yes

Yes

Yes

Haverhill

605304

Haverhill- Bridge Re- placement Bridge St (Rt 125) over Merri- mack and B&M RR

$108,011,904

2024 to

2027

Yes

Yes

Yes

Haverhill

609466

Haverhill– Roadway Reconstruction on North Avenue

$5,798,257

2027

Yes

Yes

Yes

Lawrence

612074

Lawrence– Bridge

Replacement, L-04-

012, Short Street over Spicket River

$3,285,005

2026

Yes

Yes

Yes

Lawrence

612002

Lawrence – Commu- nity Day Arlington Improvements (SRTS)

$1,554,211

2025

Yes

Yes

Yes

Draft FFYs 2023-2027 MVMPO TIP April 2022 148

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis (Cont.)

Commu- nity

Project

Number

Project Description

Total Funding Pro- grammed

FFY

Title VI Com- mu- nity

EJ Com mu- nity

LEP Com mu- nity

Lawrence

608930

Lawrence- Lawrence Manchester Rail Cor- ridor (LMRC) Rail Trail

$21,416,304

2024 to

2025

Yes

Yes

Yes

Lawrence

610924

Lawrence– Roadway Reconstruction on Amesbury Street

$8,028,654

2024

Yes

Yes

Yes

Methuen

612158

Methuen- Bridge Re- placement, M-17-

026, Route 213

EB/WB over the Me- thuen Rail Trail

$4,598,252

2025

Yes

Yes

Yes

Methuen

610658

Methuen– Intersec- tion Improvements at Riverside Drive and Burnham Road

$2,063,889

2024

Yes

Yes

Yes

New- buryport

608029

Newburyport– Inter- section Improve- ments @ Route 1 & Merrimac Street

$2,870,513

2027

No

No

No

North

Andover

608095

North Andover- Route 114, between Waverly Road & Wil- low/Mill Street

$34,083,859

2024 to

2027

No

No

No

Draft FFYs 2023-2027 MVMPO TIP April 2022 149

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis (Cont.)

Commu- nity

Project

Number

Project Descrip- tion

Total

Funding Pro- grammed

FFY

Title VI Com- mu- nity

EJ Com mu- nity

LEP Com mu- nity

Rowley

609392

Rowley – Safety Improvements at Route 1, Central and Glen Streets

$1,330,785

2023

No

No

No

Salisbury

602202

Salisbury- Recon- struction of Route 1 (Lafayette Rd)

$19,266,283

2023 to

2024

No

No

No

Total All Projects

2023 to 2027

$569,107,048

Draft FFYs 2023-2027 MVMPO TIP April 2022 150

FFYs 2023 to 2027 MVMPO Equity Analysis Highway Funding

Community

Number

of

Projects

Percent

Of

Projects

TIP Funding

Percent

of

Funding

Title

VI Com- mu- nity

EJ

Com- mu- nity

LEP

Com- mu- nity

Amesbury

1

4%

$2,448,760

0.4%

No

No

No

Andover

4

17%

$160,548,936

28.2%

No

No

Yes

Boxford

1

4%

$1,260,218

0.2%

No

No

No

Georgetown

2

8%

$4,659,218

0.8%

No

No

No

Groveland

1

4%

$1,858,080

0.3%

No

No

No

Haverhill

3

13%

$209,897,581

36.9%

Yes

Yes

Yes

Lawrence

5

21%

$120,821,674

21.2%

Yes

Yes

Yes

Merrimac

0

0%

$0

0.0%

No

No

No

Methuen

2

8%

$6,662,141

1.2%

Yes

Yes

Yes

Newbury

1

4%

$3,399,000

0.6%

No

No

No

Newburyport

1

4%

$2,870,513

0.5%

No

No

No

North Andover

1

4%

$34,083,859

6.0%

No

No

No

Rowley

1

4%

$1,330,785

0.2%

No

No

No

Salisbury

1

4%

$19,266,283

3.4%

No

No

No

West

Newbury

0

0%

$0

0.0%

No

No

No

MVRTA

0

0%

$0

0.0%

Yes

Yes

Yes

Total

24

$569,107,048

Percent of Projects in Title VI Community = 42% Percent of Projects in EJ Community = 42% Percent of Projects in LEP Community = 58%
Percent of Funding in Title VI Community = 59% Percent of Funding in EJ Community = 59%
Percent of Funding in LEP Community = 87%
Draft FFYs 2023-2027 MVMPO TIP April 2022 151

FFYs 2018 to 2022 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis

Commu- nity

Pro- ject Num- ber

Project Descrip- tion

Total Funding Pro- grammed

FFY

Title VI Com- mu- nity

EJ Com- munity

LEP Com- mu- nity

Amesbury

602418

Amesbury - Elm St. Reconstruction (2019 = $3,955,071,

2020 = $7,223,053)

$11,178,124

2019-

2020

No

No

No

Ames- bury/ Salisbury

607737

Amesbury- Salis- bury Trail Con- nector at I-95

$3,167,723

2018

No

No

No

Groveland

608298

Groveland – Com- munity Trail from Main Street to King Street

$1,984,861

2021

No

No

No

Haverhill

608761

Haverhill – Rt. 108 (Newton Road) at Rt. 110 (Kenoza Ave. and Amesbury Rd.)

$1,980,067

2021

Yes

Yes

Yes

Haverhill

608027

Haverhill Bradford

Rail Trail Ext.

$1,766,108

2020

Yes

Yes

Yes

Draft FFYs 2023-2027 MVMPO TIP April 2022 152

FFYs 2018 to 2022 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis (Cont.)

Commu- nity

Project Num- ber

Project Description

Total Funding Pro- grammed

FFY

Title VI Com- mu- nity

EJ Com- mu- nity

LEP Com- mu- nity

Haverhill

605306

Haverhill- Bridge Re- placement I-495 over Merrimack (2018 =

$19,797,733, 2019 =

$23,703,426, 2020 =

$15,305,880, 2021 =

$0 (used obligation authority in Aug 2020 instead), 2022 =

12,994,233

$71,801,272

2018

-

2022

Yes

Yes

Yes

Lawrence

608946

Lawrence- Haverhill St (Route 110) at Ames Street

$1,267,500

2018

Yes

Yes

Yes

Lawrence

609251

Lawrence – Intersec- tion Improvements at South Broadway (Route 28) and

Mount Vernon Street

$1,218,368

2021

Yes

Yes

Yes

Lawrence/ North Andover

608809

Lawrence- North Andover- Resurfac- ing Route 114

$2,123,453

2018

Yes/ No

Yes/ No

Yes/ No

Lawrence

609509

Lawrence – Intersec- tion Improvements at Merrimack Street

and South Broadway

(Route 28)

$1,502,354

2022

Yes

Yes

Yes

Draft FFYs 2023-2027 MVMPO TIP April 2022 153

FFYs 2018 to 2022 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis (Cont.)

Commu- nity

Project

Number

Project Description

Total Funding Pro- grammed

FFY

Title VI Com- mu- nity

EJ Com mu- nity

LEP Com mu- nity

Lawrence

610923

Lawrence – Intersec- tion Reconstruction

at Marston Street and East Haverhill Street

$1,658,011

2022

Yes

Yes

Yes

MVRTA

MV0001

Flex to FTA for MVRTA Cleaner Fuel Buses

$698,541

2019

Yes

Yes

Yes

MVRTA

MV0003

Flex to FTA for MVRTA Bike Racks for Buses and for Transportation Cen- ters

$110,000

2019

Yes

Yes

Yes

MVRTA

S10777

MVRTA Flex to FTA

to Replace Yr 2009

Buses with New Buses Delivery 2022 (7 of 9)

$3,467,361

2021

Yes

Yes

Yes

MVRTA

S12107

MVRTA – Flex to

FTA to Replace Yr

2011 Buses with New Clean Diesel Buses Order 1/2022

Delivery 6/2023 (6 of

8)

$2,983,200

2022

Yes

Yes

Yes

Draft FFYs 2023-2027 MVMPO TIP April 2022 154

FFYs 2018 to 2022 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis (Cont.)

Commu- nity

Project

Number

Project Description

Total Funding Pro- grammed

FFY

Title VI Com mu- nity

EJ Com mu- nity

LEP Com- mu- nity

MVRTA

S12108

MVRTA – Flex to FTA

to Replace Yr 2011

Buses with New Hybrid

Buses Order 1/2022

Delivery 6/2023 (2 of 8)

$1,401,200

2022

Yes

Yes

Yes

MVRTA

S12109

MVRTA – Flex to FTA

to Repower five (5)

2015 Transit Buses

$314,185

2022

Yes

Yes

Yes

MVRTA

S12110

MVRTA – Flex to FTA

to Repower five (5)

2016 Transit Buses

$328,560

2022

Yes

Yes

Yes

MVRTA

S12111

MVRTA – Flex to FTA to Upgrade CAD/AVL and Automated Vehicle Announcement (AVA)

$946,210

2022

Yes

Yes

Yes

New- buryport

608792

Newburyport- SRTS

$1,866,615

2019

No

No

No

Newbury/ New- buryport/ Salisbury

608494

Newbury/ Newburyport/ Salisbury Resurfacing Route 1

$15,735,772

2022

No

No

No

North

Andover

606159

North Andover- Rt 125/ Mass Ave

$5,446,662

2019

No

No

No

Draft FFYs 2023-2027 MVMPO TIP April 2022 155

FFYs 2018 to 2022 MVMPO Statewide and Regional Target Highway Funding

Projects by Community for Equity Analysis (Cont.)

Commu- nity

Project

Number

Project Description

Total Funding Pro- grammed

FFY

Title VI Com mu- nity

EJ Com mu- nity

LEP Com- mu- nity

Salisbury

605020

Salisbury- Multi-use

trail extension (Borders- to-Boston), includes

new bridge S-02-004

$7,184,196

2018

No

No

No

Total All Projects

2018 to 2022

$140,130,343

Draft FFYs 2023-2027 MVMPO TIP April 2022 156

FFYs 2018 to 2022 MVMPO Equity Analysis Highway Funding

Community

Num

ber of Pro- jects

Percent

Of

Projects

TIP Funding

Per-

cent of Fund- ing

Title VI

Com- munity

EJ Com-

munity

LEP

Com- munity

Amesbury

2

7%

$12,761,986

9%

No

No

No

Andover

0

0%

$0

0%

No

No

Yes

Boxford

0

0%

$0

0%

No

No

No

Georgetown

0

0%

$0

0%

No

No

No

Groveland

1

4%

$1,984,861

1%

No

No

No

Haverhill

3

11%

$75,547,447

54%

Yes

Yes

Yes

Lawrence

5

19%

$6,707,960

5%

Yes

Yes

Yes

Merrimac

0

0%

$0

0%

No

No

No

Methuen

0

0%

$0

0%

Yes

Yes

Yes

Newbury

1

4%

$5,245,257

4%

No

No

No

Newburyport

2

7%

$7,111,872

5%

No

No

No

North Ando- ver

2

7%

$6,508,389

5%

No

No

No

Rowley

0

0%

$0

0%

No

No

No

Salisbury

3

11%

$14,013,315

10%

No

No

No

West

Newbury

0

0%

$0

0%

No

No

No

MVRTA

8

30%

$10,249,257

7%

Total

27

$140,130,343

Percent of Projects in Title VI Community = 59% Percent of Projects in EJ Community = 59% Percent of Projects in LEP Community = 59%
Percent of Funding in Title VI Community = 66% Percent of Funding in EJ Community = 66%
Percent of Funding in LEP Community = 66%
Draft FFYs 2023-2027 MVMPO TIP April 2022 157

FFYs 2023 – 2027 MVMPO Transit Projects Funding

FFY Year

Project Num- ber

Project Description

Total Project

Cost

2023

RTD0010747

Preventative Maintenance for Service

$3,730,510

2023

RTD0010748

Operating Assistance for Service

$1,478,730

2023

RTD0010749

ADA Paratransit Service

$1,861,090

2023

RTD0010750

Replace 8 Model Yr 2011 35’ buses delivery

2023

$4,384,400

2023

RTD0010751

Replace 6 Model Yr 2017 Type E-2 vans de- livery 2023

$469,620

2023

RTD0010752

Merrimack Valley Short Range Transit Plan- ning

$100,000

2023

RTD0010758

Replace 1 Model Year 2017 Supervisory Ve- hicle

$50,335

2023

RTD0011300

MVRTA - BUY REPLACEMENT VAN

$469,620

2023

RTD0011301

MVRTA - METROPOLITAN PLANNING

$65,000

2023

RTD0011304

MVRTA- BUY REPLACEMENTS- CAPITOL BUS

$2,983,200

2023

RTD0011305

MVRTA - BUY REPLACEMENTS- CAPITOL BUS

$1,401,200

2023

RTD0011306

MVRTA- REHAB/RENOVATE - MISC EQUIPMENT

$1,700,000

2023

RTD0011307

MVRTA- ENG/DESIGN - ADMIN/MAINT FACILITY

$800,000

2023

RTDTBD13

MVRTA - 5339 Bus & Bus Facility Discretion- ary: Improvements to the McGovern Trans- portation Center

$1,200,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 158

FFYs 2023 – 2027 MVMPO Transit Projects Funding (Cont.)

FFY Year

Project Num- ber

Project Description

Total Project

Cost

2024

RTD0010753

MVRTA - Replace 8 model yr 2012 35' buses delivery 2024 8 of 8

$4,703,200

2024

RTD0010754

MVRTA - Preventative Maintenance for ser- vice

$3,618,265

2024

RTD0010755

MVRTA - Operating Assistance for Service

$1,429,680

2024

RTD0010756

MVRTA - ADA paratransit service

$1,963,500

2024

RTD0010757

Merrimack Valley MPO Short Range Transit

Planning

$100,000

2024

RTD0010759

MVRTA - Replace 1 Model Year 2018 Super- visory Vehicle

$51,845

2024

RTD0011302

MVRTA - METROPOLITAN PLANNING

$65,000

2024

RTD0011308

MVRTA - ENG/DESIGN - ADMIN/MAINT FACILITY

$1,250,000

2024

RTD0011309

MVRTA - CONSTRUCT ADMIN/MAINT FACILITY

$10,950,000

2024

RTDTBD14

MVRTA - 5339 Bus & Bus Facility Discretion- ary: Expansion of MVRTA Bus Maintenance Facility & Possible New Bus Hub at Bradford CR Station

$4,800,000

2024

RTDTBD15

MVRTA - 5307(h) Passenger Ferry Grant Dis- cretionary Program: Capital costs for launch of Merrimack River ferryboat service between Haverhill and Newburyport

$750,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 159

FFYs 2023 – 2027 MVMPO Transit Projects Funding (Cont.)

FFY Year

Project Num- ber

Project Description

Total Project

Cost

2025

RTD0010760

Merrimack Valley MPO Short Range Transit

Planning

$100,000

2025

RTD0010761

MVRTA - Preventative Maintenance for ser- vice

$3,690,630

2025

RTD0010762

MVRTA - Operating Assistance for Service

$1,458,270

2025

RTD0010763

MVRTA - ADA Paratransit Service

$2,071,500

2025

RTD0010764

MVRTA - Replace 1 Model Year 2019 Supervi- sory Vehicle

$53,400

2025

RTD0011303

MVRTA - METROPOLITAN PLANNING

$65,000

2025

RTD0011317

MVRTA - CONSTRUCT - MISC EQUIPMENT

$625,000

2026

RTD0010765

MVRTA - Preventative Maintenance for ser- vice

$3,810,350

2026

RTD0010766

MVRTA - ADA Paratransit Service

$2,185,500

2026

RTD0010767

Merrimack Valley MPO Short Range Transit

Planning

$100,000

2026

RTD0010768

MVRTA - Operating Assistance for Service

$1,502,020

2026

RTD0010769

MVRTA - Replace 1 Model Yr 2020 Supervi- sory Vehicle

$55,000

Draft FFYs 2023-2027 MVMPO TIP April 2022 160

FFYs 2023 – 2027 MVMPO Transit Projects Funding (Cont.)

FFY Year

Project Num- ber

Project Description

Total Project

Cost

2027

RTD0011311

MVRTA- OPERATING ASSISTANCE

$1,585,000

2027

RTD0011312

MVRTA - PREVENTIVE MAINTENANCE

$2,500,000

2027

RTD0011313

MVRTA- PLANNING

$120,000

2027

RTD0011314

MVRTA - NON FIXED ROUTE ADA PARA SERV

$2,305,700

2027

RTD0011315

MVRTA - BUY REPLACEMENT 35-FT BUS

$10,000,000

2027

RTD0011316

MVRTA - CONSTRUCT - MISC EQUIPMENT

$5,000,000

Total Transit Project Funding 2023 to 2027

$87,602,565

Draft FFYs 2023-2027 MVMPO TIP April 2022 161

FFYs 2018 – 2022 MVMPO Transit Projects Funding

FFY Year

Project Num- ber

Project Description

Total Project

Cost

2018

RTD0005637

ADA Operating Expense

$1,413,370

2018

RTD0005638

Preventive Maintenance

$3,152,905

2018

RTD0005639

Refurbish Engine/ trans 8 model year 2012 buses

$264,000

2018

RTD0005642

Operating Assistance

$643,010

2018

RTD0005643

Short Range Transit Planning

$100,000

2018

RTD0005656

Replace 6 Model Yr 2004 buses delivery

2018

$2,689,500

2018

RTD0005662

Replace 1 Model Yr 2013 Support Vehicle

$47,750

2019

RTD0006769

Preventive Maintenance

$3,250,095

2019

RTD0006770

ADA Operating Expense

$1,456,420

2019

RTD0006771

Short Range Transit Planning

$100,000

2019

RTD0006772

Operating Assistance

$780,250

2019

RTD0007127

SGR Riverbank stabilization Design/Permit- ting

$235,035

2019

RTD0007126

SGR Refurbish 4 vehicle lifts

$400,000

2019

RTD0006785

Replace 1 Model Yr 2013 Support Vehicle

$45,205

2020

RTD0007680

Preventive Maintenance

$3,323,160

2020

RTD0007681

Non-Fixed Route ADA Para Serv

$1,653,255

2020

RTD0007682

Short Range Transit Planning

$100,000

2020

RTD0007683

Operating Assistance

$861,550

Draft FFYs 2023-2027 MVMPO TIP April 2022 162

FFYs 2018 – 2022 MVMPO Transit Projects Funding (Cont.)

FFY Year

Project Num- ber

Project Description

Total Project

Cost

2020

RTD0007687

Replace 3 Model Yr 2007 buses delivery

2020

$1,377,150

2020

RDT0007696

SGR Replace 1 Model Year 2013 supervisory vehicle

$46,530

2020

RDT0008295

NEET Driving Forward 2020

$25,000

2020

RTD0008320

Town of Salisbury MAP Van for Svc Expan- sion (1)

$68,000

2020

RTD0008311

Town of Andover MAP Buy Replacement Van

(1)

$69,100

2020

RTD0009193

Purchase On-board Automatic Passenger

Counters (APC)

$371,280

2021

RTD0008602

SGR Replace 1 model yr 2016 supervisory vehicle

$47,900

2021

Replace Model Yr 2009 Buses Delivery 2022 (2 of 9)

$990,674

2021

RTD0009132

SGR Replace Security Camera System at

McGovern Center

$131,000

2021

RTD0008595

Operating Assistance

$1,116,240

2021

RTD0008592

Preventive Maintenance

$3,495,970

2021

RTD0008594

Short Range Transit Planning

$100,000

2021

RTD0008596

Replace 16 Model Yr 2015 vans with new De- livery 2021

$1,180,480

2021

RTD0008593

Non Fixed Route ADA Paratransit Service

$1,741,065

Draft FFYs 2023-2027 MVMPO TIP April 2022 163

FFYs 2018 – 2022 MVMPO Transit Projects Funding (Cont.)

FFY Year

Project Num- ber

Project Description

Total Project

Cost

2021

RTD0010047

SGR Replace 1 model yr 2016 Supervisory

Vehicle

$46,000

2021

RTD0010048

SGR Replace piping and related connections to underground gasoline tank

$50,000

2021

RTD0010049

Purchase of new bus and van tires to replace used tires

$65,000

2021

RTD0010050

Purchase licenses to upgrade diagnostic en- gine and transmission software

$5,000

2021

RTD0010051

SGR Replace HVAC Unit in Money Room

$6,938

2021

RTD0010305

Replace 2 servers/ related switches at

MVRTA HQ

$19,022

2021

RTD0010306

Replace Security Surveillance system at

Gateway Parking Area

$147,339

2021

RTD0010307

Replace Security Surveillance system at

MVRTA Haverhill Intermodal Parking Facility

$64,516

2021

RTD0010308

Purchase MDT units, camera and communication equipment for 9 ADA service vehicles

$78,793

2021

RTD0010309

Upgrade security front gate entrance Control Pad at MVRTA HQ

$2,500

2021

RTD0010310

Install Cloud Based data storage system at

MVRTA HQ

$12,891

2021

RTD0010311

Replace external security cameras on buses and vans

$5,380

Draft FFYs 2023-2027 MVMPO TIP April 2022 164

FFYs 2018 – 2022 MVMPO Transit Projects Funding (Cont.)

FFY Year

Project Number

Project Description

Total Project

Cost

2022

RTD0009669

Preventative Maintenance

$3,611,335

2022

RTD0009671

Short Range Transit Planning

$100,000

2022

RTD0009672

Operating Assistance

$1,289,890

2022

RTD0009670

ADA Paratransit Service

$1,801,630

2022

RTD0009673

Replace 9 Model Yr 2009 35’ buses deliv-

ery 2022

$4,458,030

2022

RTD0010053

MVRTA HQ Facility Repairs

$682,000

2022

RTD0009680

Replace 1 Model Yr 2016 supervisory ve- hicle

$48,870

2022

RTD0010107

Riverbank Stabilization Construction

$2,546,000

Total Transit Funding 2018 to 2022

$46,317,028

Draft FFYs 2023-2027 MVMPO TIP April 2022 165

Massachusetts Environmental Justice Analysis

MassDOT maps its highway projects on a State of Massachusetts environmental justice map. The website for Massachusetts Environmental Justice https://www.mass.gov/info-details/en- vironmental-justice-populations-in-massachusetts#what-is-an-environmental-justice-popula-
tion?- defines environmental justice populations:
“In Massachusetts, a neighborhood is defined as an Environmen- tal Justice population if one or more of the following four criteria are true:
1. the annual median household income is not more than 65 per cent of the statewide annual median household income;
2. minorities comprise 40 per cent or more of the population;
3. 25 per cent or more of households lack English language profi- ciency; or
4. minorities comprise 25 per cent or more of the population and the annual median household income of the municipality in which the neighborhood is located does not exceed 150 per cent of the statewide annual median household income.”
The following table shows the percent of highway investment in Massachusetts Environmen- tal Justice Neighborhoods versus percent investment not in Massachusetts EJ Neighbor-
hoods.

TIP Highway Project Invest- ment

Percent of

Investment

Projects in Massachusetts EJ Neighborhoods

$522,221,049

92%

Projects outside Massachusetts

EJ Neighborhood

$46,885,999

8%

Total

$569,107,048

100%

This table illustrates 92% of the investment is in Massachusetts EJ Neighborhoods.
The table on the following pages shows which 2023 to 2027 TIP highway projects are located in Massachusetts Environmental Justice Neighborhoods.
Draft FFYs 2023-2027 MVMPO TIP April 2022 166

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Project in Massachusetts Environmental Justice Neighborhood or not

Community

Project Num- ber

Project

Description

Total

Funding Pro- grammed

FFY

In Massachusetts Environmental Justice Neighbor- hood

Amesbury

611977

Amesbury– River- walk Connector to the Salisbury Point Ghost Trail

$2,448,760

2027

No

Andover

612193

Andover- Bridge

Preservation, A-09-

022, I-93 over Merri- mack River

$38,102,400

2025

Yes

Andover

606522

Andover- Bridge Re- hab., I-495 over Rt.

28 and RR

$173,075,000

2023 to

2026

Yes

Andover

612143

Andover– Bridge Re- placement, A-09-

015, Tewksbury Street over MBTA/BMRR

$17,383,839

2025

No

Andover/ Tewksbury

612045

Andover-Tewksbury- Interstate Mainte- nance and related work on I-93

$18,525,197

2025

Yes

Georgetown/ Boxford

607541

Georgetown/ Boxford

Border to Boston

Trail

$2,520,436

2024

Yes

Georgetown/ Newbury

607542

Georgetown/ New- bury Border to Bos- ton Trail

$6,798,000

2026

Yes

Draft FFYs 2023-2027 MVMPO TIP April 2022 167

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Project in Massachusetts Environmental Justice Neighborhood or not (Cont.)

Community

Project Num- ber

Project

Description

Total

Funding Pro- grammed

FFY

In Massachusetts Environmental Justice Neighbor- hood

Groveland

S12208

Groveland- Improve- ments at Dr. Elmer Bagnall Elementary School

$1,858,080

2026

No

Haverhill

609466

Haverhill- Bridge Re- placement I-495 over Merrimack (H-12-

040)

$96,087,420

2024 to

2027

Yes

Haverhill

605304

Haverhill- Bridge Re- placement Bridge St (Rt 125) over Merri- mack and B&M RR

$108,011,904

2024 to

2027

Yes

Haverhill

609466

Haverhill– Roadway Reconstruction on North Avenue

$5,798,257

2027

Yes

Lawrence

612074

Lawrence– Bridge

Replacement, L-04-

012, Short Street over Spicket River

$3,285,005

2026

Yes

Lawrence

612002

Lawrence – Commu- nity Day Arlington Improvements (SRTS)

$1,554,211

2025

Yes

Draft FFYs 2023-2027 MVMPO TIP April 2022 168

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Project in Massachusetts Environmental Justice Neighborhood or not (Cont.)

Commu- nity

Project

Number

Project Description

Total Funding Pro- grammed

FFY

In Massachusetts Environmental Justice Neighbor- hood

Lawrence

608930

Lawrence- Lawrence Manchester Rail Cor- ridor (LMRC) Rail Trail

$21,416,304

2024 to

2025

Yes

Lawrence

610924

Lawrence– Roadway Reconstruction on Amesbury Street

$8,028,654

2024

Yes

Methuen

612158

Methuen- Bridge Re- placement, M-17-

026, Route 213

EB/WB over the Me- thuen Rail Trail

$4,598,252

2025

No

Methuen

610658

Methuen– Intersec- tion Improvements at Riverside Drive and Burnham Road

$2,063,889

2024

Yes

New- buryport

608029

Newburyport– Inter- section Improve- ments @ Route 1 & Merrimac Street

$2,870,513

2027

Yes

North

Andover

608095

North Andover- Route 114, between Waverly Road & Wil- low/Mill Street

$34,083,859

2024 to

2027

Yes

Draft FFYs 2023-2027 MVMPO TIP April 2022 169

FFYs 2023 to 2027 MVMPO Statewide and Regional Target Highway Funding

Project in Massachusetts Environmental Justice Neighborhood or not (Cont.)

Commu- nity

Project

Number

Project Descrip- tion

Total

Funding Pro- grammed

FFY

In Massachusetts Environmental Justice Neighbor- hood

Rowley

609392

Rowley – Safety Improvements at Route 1, Central and Glen Streets

$1,330,785

2023

No

Salisbury

602202

Salisbury- Recon- struction of Route 1 (Lafayette Rd)

$19,266,283

2023 to

2024

No

Total All Projects

2023 to 2027

$569,107,048

Draft FFYs 2023-2027 MVMPO TIP April 2022 170

Appendix

Draft FFYs 2023-2027 MVMPO TIP April 2022 171

Appendix

Merrimack Valley Metropolitan Planning

Organization

Federal Fiscal Years 2023 to 2027

Transportation Improvement Program

Appendix Draft Report

April 2022

Prepared by the Merrimack Valley Planning Commission

This document was prepared in cooperation with the Massachusetts Department of
Transportation and the U.S. Department of Transportation. (under Contract
# 114679 with MassDOT) The views and opinions of the Merrimack Valley Planning Commission expressed herein do not necessarily state or reflect those of the Massachusetts Department of Transportation or the U.S. Department of Transportation.
Page intentionally left blank.

Table of Contents

Appendices......................................................................................................................... 1
Appendix A Other Regional Priority Bridge Projects ........................................................... 2
Appendix B Other Regional Priority Roadway Projects ...................................................... 3
Appendix C Transportation Evaluation Criteria Summary................................................... 5
Appendix D Sample Project Evaluation Worksheet .......................................................... 10
Appendix E Greenhouse Gas (GHG) Tracking ................................................................. 15
FFYs 2023 to 2027 Projects GHG Tracking Summary............................... 21
Appendix F Completed Highway and Transit Projects GHG Summary ............................ 58
Appendix G List of Acronyms ........................................................................................... 68
Appendix H Key to Maps Showing Locations of Transportation Projects ......................... 76
Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022

Appendices

Appendix A and B: Other Regional Priorities

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 1

Appendix A Other Regional Priority Bridge Projects

(No Funding Available)

Bridges That Do Not Fit into Fiscally Constrained Targets,

and therefore have No Funding Available in Any Year (By Town):

ID

Location

Project Description

Estimated Total Project Cost

602322

Ames.

Amesbury - Bridge Replacement,

A-07-008, Oak Street Over the B&M Railroad

(Abandoned Line)

$1,000,000

And.

Andover - Rehab. Bridge (A-09-001) Route 28 (North Main Street) Over the Shawsheen

River

605418

And.

Andover - Bridge Preservation,

A-09-028, Chandler Road over I-93

$3,450,000

604839

Law.

Lawrence – Bridge Replacement,

L-04-027, Lowell Street over B&M Railroad

$4,473,000

Law.

Lawrence - Bridge Rehabilitation,

L-04-042, South Union Connector over South

Street

Nbypt.

Newburyport - Bridge (N-11-002) State Route

113 (High Street) Over Railroad

Nbypt.

Newburyport - Bridge (N-11-014) State Route

1A (High Street) over US 1

607115

Nbypt.

Newburyport - Bridge Repairs,

N-11-015, Washington St. over US 1

$1,400,000

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 2

Appendix B Other Regional Priority Roadway Projects

(No Funding Available)

Roadway Projects That Do Not Fit into Fiscally Constrained Targets, and therefore have No Funding Available in Any Year (By Town)

ID

Location

Project Description

Estimated Total Project Cost

611957

Andover

Andover– Reconstruction on Route 133 (Lowell Street), from Shawsheen Road to Route 28 (North Main Street) TEC = 12.03

$10,080,306

606721

Boxford

Boxford- Reconstruction of Route 133 (Washington Street) from North Andover town line to Main Street TEC = 5.65

$5,172,164

Boxford

Boxford Reconstruction of Route 97 from

Georgetown to Topsfield (2 miles)

$3,785,000

607540

Boxford

Boxford - Border to Boston Trail

TEC = 4.35

$4,174,500

602843

Georgetown

Georgetown – Reconstruction on Route 97 (W. Main Street) from Moulton Street to Groveland T.L. TEC = 9.03

$6,662,599

Haverhill

Haverhill -Intersection Improvements Route

110 and Elliott Street

Haverhill

Haverhill – Widen Route 97 (Broadway)

from Computer Drive to Research Drive

608721

Haverhill

Haverhill – Corridor Improvements on Water Street (Route 97/113), from Ginty Boule- vard/Mill Street to Lincoln Boulevard/River- side Avenue TEC = 9.35

$8,050,000

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 3

Appendix B Other Regional Priority Roadway Projects (Continued) (No Funding Available)

Roadway Projects That Do Not Fit into Fiscally Constrained Targets,

and therefore have No Funding Available in Any Year (By Town):

ID

Location

Project Description

Estimated Total Project Cost

602339

Haverhill

Haverhill-Historic Waterfront Walkway Phase II (Construction)

$3,110,184

Lawrence/ North Andover

Lawrence - North Andover - Reconstruction of Route 114 from I-495 in Lawrence to Waverly Road in North Andover TEC = 12.70

Lawrence

Lawrence – Corridor Improvements on Broad- way (Route 28) from Water Street/ Canal Street to Haverhill Street (Route 110)

Newbury- port

Newburyport -Route 1 Rotary Reconfiguration

North

Andover

North Andover – Reconstruction of Mass. Ave. and Sidewalks (from Osgood St. to I-495)

North

Andover

North Andover - Signals and turn lanes at

Mass Ave. and I-495 NB and SB Ramps

607710

Salisbury

Salisbury – Resurfacing and related work

Route 1A TEC = 7.98.

$2,300,000

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 4

Appendix C Transportation Evaluation Criteria Summary

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 5

Appendix C Transportation Evaluation Criteria Summary

Programmed for Fund- ing in TIP

ID#

Project Description

Project

Cost in

1000s

AADT

Linear Lane Miles

Condition

Mobility

Safety & Security

Community Effects & Support

Land Use & Economic

Development

Environmental Effects

Total TEC Score (2023-

2027)

No

Lawrence –North Andover - Reconstruction of Rt. 114 from I-495 to Rt. 125 (Ando- ver St.)

30,000

5.6

2.50

3.00

2.00

2.20

2.25

0.75

12.70

Yes

608095

North Andover– Corridor Im- provements on Route 114, between Waverly Road & Willow/Mill Street

$32,773

30,000

4.8

2.00

2.75

2.67

2.00

2.25

0.75

12.42

No

611957

Andover – Reconstruction of Rt. 133 (Lowell Street) from Shawsheen Road to Route

28 (North Main Street)

$10,080

12,773

2.3

2.50

2.75

2.33

1.20

1.75

1.50

12.03

Yes

602202

Salisbury – Reconstruction of Rt. 1 (Lafayette Road)

$17,514

12,147

4.8

2.50

2.50

2.67

0.80

2.5

0.75

11.72

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 6

Appendix C Transportation Evaluation Criteria Summary (Cont.)

Programmed for Fund- ing in TIP

ID#

Project Description

Project

Cost in

1000s

AADT

Linear Lane Miles

Condition

Mobility

Safety & Security

Community Effects & Support

Land Use & Economic

Development

Environmental Effects

Total TEC Score (2023-

2027)

Yes

610924

Lawrence – Roadway Re- construction on Amesbury Street

$7,720

16,446

1.5

2.00

2.25

2.00

2.40

2.25

0.25

11.15

No

608721

Haverhill - Corridor Im- provements on Water St. from Ginty Blvd / Mill St. to Lincoln Ave./ Riverside Ave.

$8,050

20,200

2.0

2.00

1.75

2.00

1.60

1.75

1.00

10.10

No

602843

Georgetown – Reconstruc- tion on Route 97 (W. Main) from Moulton St. to Groveland TL

$7,567

15,486

2.2

1.50

1.25

1.33

1.20

1.75

2.00

9.03

Yes

608788

Haverhill - Reconstruction of North Ave. from Main St. to NH state line

$20,346

13,172

4.0

2.50

2.00

1.33

2.00

0.00

0.75

8.58

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 7

Appendix C Transportation Evaluation Criteria Summary (Cont.)

Programmed for Fund- ing in TIP

ID#

Project Description

Project

Cost in

1000s

AADT

Linear Lane Miles

Condition

Mobility

Safety & Security

Community Effects & Support

Land Use & Economic

Development

Environmental Effects

Total TEC Score (2023-

2027)

Yes

608029

Newburyport – Intersection Improvements Rt. 1 at Merri- mac St.

$2,475

24,850

NA

2.00

0.50

2.67

1.20

1.25

0.75

8.37

No

Salisbury – Reconstruction of

Route 1A

5,356

4.1

3.00

1.25

1.33

0.40

1.25

0.75

7.98

Yes

610658

Methuen - Intersection Im- provements at Riverside Drive and Burnham Road

$1,924

NA

NA

2.00

1.25

1.67

2.20

0.50

0.25

7.87

Yes

607541

Georgetown- Boxford– Border to Boston Trail, from Georgetown Road to West Main Street (Route 97)

$2,423

NA

NA

1.00

1.75

1.00

1.20

2.00

0.25

7.20

Yes

611977

Amesbury – Riverwalk Con- nector to the Salisbury Point Ghost Trail

$2,111

NA

NA

0.00

1.50

1.00

1.6

2.25

0.50

6.85

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 8

Appendix C Transportation Evaluation Criteria Summary (Cont.)

Programmed for Fund- ing in TIP

ID#

Project Description

Project

Cost in

1000s

AADT

Linear Lane Miles

Condition

Mobility

Safety & Security

Community Effects & Support

Land Use & Economic

Development

Environmental Effects

Total TEC Score (2023-

2027)

Yes

607542

Georgetown– Newbury – Bor- der to Boston Trail (Northern Georgetown to Byfield Sec- tion)

$6,070

NA

NA

1.00

1.25

0.67

1.40

2.00

0.50

6.82

Yes

609392

Rowley – Safety Improve- ments at Route 1, Central and Glen Streets

$1,331

NA

NA

1.50

1.25

2.00

1.00

0.25

0.50

6.50

No

606721

Boxford - Route 133 (North

Andover TL to Main St.)

$5,172

6,149

2.9

1.50

1.00

1.00

0.40

0.50

1.25

5.65

No

607540

Boxford – section of Border to

Boston Trail

$4,175

NA

NA

0.50

1.25

1.00

0.60

0.50

0.50

4.35

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 9

Appendix D Sample Project Evaluation Worksheet

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 10

Sample Project Evaluation Worksheet

Merrimack Valley Planning Commission and MassDOT Evaluation Criteria

Project: Andover - Reconstruct Rt. 133 from Shawsheen Rd to Rt. 28 Project #: 611957

Project Cost: $10,080,305 AADT: 12,773 Distance: 1.17 Linear Lane Miles: 2.34

Condition

Score

Additional Comments

A. Magnitude of pavement condition improvement.

2

PNF indicates longitudinal & lateral pavement cracking, utility patch failure, shoving and rutting of pavement along route.

B. Magnitude of improvement of other infrastructure.

3

Sidewalk one side. 10’ Shared Use Path with 5’ buffer on other side for bicycles and > safety for pedestrians, upgrade signals, drainage improvements

Condition Average

2.5

Mobility

Score

Additional Comments

A. Effect on magnitude and duration of congestion.

3

Project includes Shawsheen Square as well.

B. Effect on travel time and connectivity / access.

2

New Shared Use Path

C. Effect on other modes using the facility.

3

New shared use path, sidewalks on both sides.

D. Effect on regional and local traffic.

3

Widening shoulder, adding left turn lanes, Additional connector I-495 to I-93. NHS roadway.

Mobility Average

2.75

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 11

Sample Project Evaluation Worksheet (Cont.)

Project: Andover - Reconstruct Rt. 133 from Shawsheen Rd to Rt. 28 Project #: 611957

Safety and Security

Score

Additional Comments

A. Effect on crash rate compared to State average.

3

Rt 28 and 133 is HSIP crash cluster, crash rate = 1.75, And arterial between the two signalized intersections is

3.8, State Avg. = 2.12.

B. Effect on bicycle and pedestrian safety.

3

Shared Use Path and extra sidewalk, shoulder for bicy- cles, and provides greater safety for bicycles and pe- destrians.

C. Effect on transportation security and evacuation routes/

1

Is an NHS roadway.

Is an evacuation route.

Safety and Security Average

2.33

Community Effects and Support

Score

Additional Comments

A. Residential effects: ROW, noise, aesthetics, cut through traffic, and other.

2

May need easements for retaining wall. For the most part all within ROW. General appearance and less noise from better pavement conditions.

B. Public, local government, legislative, and regional sup- port.

3

Letter of support from Sen. Finegold

C. Effect on service to minority or low-income neighbor- hoods. (Title VI and EJ)

0

Not Title VI or EJ area.

D. Other impacts / benefits to minority or low-income neighborhoods. (Title VI and EJ).

0

Not Title VI or EJ area.

E. Effect on development and redevelopment of housing

1

Community Effects and Support Average

1.20

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 12

Sample Project Evaluation Worksheet (Cont.)

Project: Andover - Reconstruct Rt. 133 from Shawsheen Rd to Rt. 28 Project #: 611957

Land Use and Economic Development

Score

Additional Comments

A. Business effects; ROW, noise, traffic, parking, freight access, other.

2

Improve access to existing businesses.

B. Sustainable development effects. Consistent with

MVPGS.

2

Access to MVPGS Brickstone Square State PDA. Improves transportation choice (walk/bike) for area resi- dents.

C. Consistent with regional land-use and economic devel- opment plans and PGS.

2

Access to MVPGS Brickstone Square State PDA. Improves transportation choice (walk/bike) for area resi- dents.

D. Effect on job creation.

1

Should provide better access to Brickstone Square

State PDA.

Land Use and Economic Development Average

1.75

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 13

Sample Project Evaluation Worksheet (Cont.)

Project: Andover - Reconstruct Rt. 133 from Shawsheen Rd to Rt. 28 Project #: 611957

Environmental Effects

Score

Additional Comments

A. Air quality / Climate effects. GHG Impact Description – Assumed Nominal Decrease in Emissions from Other Improvements

2

Shared Use Path and sidewalks. Reduced delays at intersections.

B. Water quality/supply effects; wetlands effects.

1

There will be deep sump catch basins

C. Historic and cultural resources effects.

3

Shawsheen Village Historic District

D. Effect on wildlife habitat and endangered species.

0

Not endangered species habitat area.

Environmental Effects Average

1.5

Overall Project TEC score

12.03

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 14

Appendix E Greenhouse Gas (GHG) Tracking

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 15

2023 to 2027

Transportation Improvement Program

Greenhouse Gas Tracking

This section summarizes the greenhouse gas (GHG) impacts that are anticipated to result from the projects that are included in this FFY 2023 to 2027 Transportation Improvement Program (TIP). It includes a summary of the state laws and policies that call for reducing greenhouse gas in order to mitigate global climate change, actions that respond to these state laws and policies, the role of regional planning and TIP development in reducing GHG emission and tracking these reductions, and the projected GHG emission impacts from the projects programmed in the TIP.

State Policy Context

The Global Warming Solutions Act (GWSA), which was signed into law in August 2008, makes Massachusetts a leader in setting aggressive and enforceable GHG reduction targets, and implementing policies and initiatives to achieve these targets. In keeping with the law, on December 29, 2010 the Massachusetts Executive Office of Energy and Environmental Affairs (EOEEA), in consultation with other state agencies and the public, released the Massachusetts Clean Energy and Climate Plan for 2020. In December 2014 the Department of Environmental Protection (DEP) issued new regulations that require Metropolitan Planning Organizations to quantify impacts from project investments, track progress towards reductions, and consider impacts in the prioritization of project investments. The targets for overall statewide GHG emissions are:

By 2020: 25 percent reduction below statewide 1990 GHG emission levels, and

By 2050: 80 percent reduction below statewide 1990 GHG emission levels

The Role of Metropolitan Planning Organizations

The Commonwealth’s MPOs are integrally involved in supporting the GHG reductions mandated under the GWSA. The MPOs are most directly involved in helping to achieve the GHG emissions reductions through the promotion of healthy transportation modes through prioritizing and programming an appropriate balance of roadway, transit, bicycle and pedestrian investments – and assisting smart growth development patterns through the creation of a balanced multi-modal transportation system. This is realized through the transportation goals and policies espoused in the Regional Transportation Plans (RTPs),
the major projects planned in the RTPs, and the mix of new transportation projects that are programmed and implemented through the TIPs. GHG tracking and evaluation processes enable the MPOs to identify the anticipated GHG impacts of planned and programmed
projects, and also to use GHG impacts as a criterion in prioritizing transportation projects.
Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 16

Project-Level GHG Tracking and Evaluation in TIPs

It is also important to monitor and evaluate the GHG impacts of the transportation projects that are programmed in the MPOs’ TIPs. The TIPs include both the larger, regionally- significant projects from the RTPs, which are reported in the Statewide GHG report, as well as smaller projects that are not included in the RTP but that may nevertheless have
impacts on GHG emissions. The primary objective of this tracking is to enable the MPOs to evaluate expected GHG impacts of different projects and to use this information as a criterion for prioritizing and programming projects.

Calculation of GHG Impacts for TIP Projects

MassDOT has adopted spreadsheets used by MPOs to determine CMAQ eligibility and that also include CO2 impacts. The data and analysis required for these calculations is available from functional design reports that are submitted for projects that would produce a measurable GHG impact.

Projects with Quantified Impacts

RTP Projects

Major capacity expansion projects are expected to have a significant impact on GHG emissions. These projects are included in each MPO’s RTP and analyzed using either the statewide model or Boston MPO’s regional model, which reflect GHG impacts. As a result, no independent TIP calculations are required.

Quantified Decrease in Emissions

For those projects that are expected to produce a measurable decrease in emissions, the approach for calculating these impacts is described below. These projects are categorized in the following manner:

Quantified Decrease in Emissions from Traffic Operational Improvement - An intersection reconstruction or signalization project that is projected to reduce delay and congestion.

Quantified Decrease in Emissions from Pedestrian and Bicycle Infrastructure - A shared-use path that enables increased walking and biking and decreased vehicle-miles traveled (VMT).

Quantified Decrease in Emissions from New/Additional Transit Service - A bus or shuttle service that enables increased transit ridership and decreased VMT.

Quantified Decrease in Emissions from a Park and Ride Lot - A park-and- ride lot that enables increased transit ridership/ increased ridesharing and

decreased VMT.
Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 17

Quantified Decrease in Emissions from Bus Replacement

A bus replacement that directly reduces GHG emissions generated by service.

Quantified Decrease in Emissions from Complete Streets Improvements - Improvements to roadway networks that include the addition of bicycle and pedestrian accommodations where none were present before.

Quantified Decrease in Emissions from Alternative Fuel Vehicle Procurements – A vehicle procurement where alternative fuel/ advanced technology vehicles replace traditional gas or diesel vehicles.

Quantified Decrease in Emissions from Anti-idling Strategies – Implementation of policies such as limiting idling allowed, incorporationg anti- idling technology into fleets and using LED lights on trucks for the purpose of illuminating worksites.

Quantified Decrease in Emissions from Bike Share Projects – A new bike share project or capacity added to existing project.

Quantified Decrease in Emissions from Induced Travel Projects – A project that changes roadway capacity.

Quantified Decrease in Emissions from Speed Reduction Programs –

Programs that reduce speed to no less than 55 miles per hour.

Quantified Decrease in Emissions from Transit Signal Priority Projects – A project that applies this technology to a signal intersection or along a corridor that impacts bus service.

Quantified Decrease in Emissions from Truck Stop Electrification Projects

A new truck stop electrification project or capacity added to an existing project.

Quantified Decrease in Emissions from Other Improvement

Quantified Increase in Emissions

Projects expected to produce a measurable increase in emissions.

Projects with No Assumed Impacts

No Assumed Impact/Negligible Impact on Emissions - Projects that do not change the capacity or use of a facility (e.g. roadway median barrier or retaining wall replacement, or bridge rehabilitation/replacement that restores the bridge to its previous condition) are assumed to have no/negligible GHG impact.

Qualitative Decrease in Emissions

Projects expected to produce a minor decrease in emissions that cannot be calculated with any precision. Examples of such projects include roadway repaving, signage improvement,
ITS improvement, or transit marketing/customer experience improvement.
Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 18

Qualitative Increase in Emissions

Projects expected to produce a minor increase in emissions that cannot be calculated with any precision.

Regional Greenhouse Gas Impact Summary Tables for FFYs 2023 to

2027 TIP

The following tables summarize the calculated quantitative and assumed qualitative impacts of the projects included in the regional FFYs 2023 to 2027 TIP by year.
Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 19
Page intentionally left blank.
Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 20

FFYs 2023 to 2027 Projects GHG Tracking Summary

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 21

2023 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

606522

ANDOVER- BRIDGE REHABILITATION, A-

09-036, I-495 OVER ST

28 (SB), A-09-037, I-495

OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

$80,749,024

Qualitative

No assumed impact/ negligible impact on emissions

$173,075,000

AC Yr 1 of 4

602202

SALISBURY- RECONSTRUCTION OF ROUTE 1 (LAFAYETTE ROAD)

$13,293,829

Quantitative

Quantified Decrease in Emissions from Bi- cycle and Pedestrian Infrastructure

$19,266,283

AC Yr 1 of 2

Quantity of GHG impact is in year 2

609392

ROWLEY – SAFETY IMPROVEMENTS AT ROUTE 1, CENTRAL AND GLEN STREETS

$1,330,785

Qualitative

No assumed impact/ negligible impact on emissions

$1,330,785



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 22

2024 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

610658

METHUEN – INTERSECTION IMPROVEMENTS AT RIVERSIDE DRIVE AND BURNHAM ROAD

$2,063.889

Quantitative

333,725

Quantified Decrease in Emissions from Traffic Operational Improvement

$2,063.889

608095

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN WAVERLY ROAD & WILLOW/MILL STREET

$5,432,436

Qualitative

RTP project included in the Statewide model.

$34,083,859

AC Yr 1 of 4

602202

SALISBURY- RECONSTRUCTION OF ROUTE 1 (LAFAYETTE ROAD)

$5,972,454

Quantitative

27,932

Quantified Decrease in Emissions from Bi- cycle and Pedestrian Infrastructure

$19,266,283

AC Yr 2 of 2



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 23

2024 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

606522

ANDOVER- BRIDGE REHABILITATION, A-09-

036, I-495 OVER ST 28 (SB), A-09-037, I-495

OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

$60,000,000

Qualitative

No assumed impact/ negligible impact on emissions

$173,075,000

AC Yr 2 of 4

605304

HAVERHILL- BRIDGE REPLACEMENT, H-12-

007 & H-12-025, BRIDGE STREET (SR

125) OVER

MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY)

$20,600,000

Qualitative

No assumed impact/ negligible impact on emissions

$108,011,904

AC Yr 1 of 4.


Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 24

2024 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

609466

HAVERHILL- BRIDGE REPLACEMENT, H-12-

040, I-495 (NB & SB) OVER MERRIMACK RIVER

$21,388,926

Qualitative

No assumed impact/ negligible impact on emissions

$96,087,420

AC Yr 1 of 4.

607541

GEORGETOWN- BOXFORD- BORDER TO BOSTON TRAIL, FROM GEORGETOWN ROAD TO WEST MAIN STREET (ROUTE 97)

$2,520,436

Quantitative

2,667

Quantified Decrease in Emissions from Bicycle and Pedes- trian Infrastructure

$2,520,436

608930

LAWRENCE- LAWRENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL

$1,000,000

Quantitative

Quantified Decrease in Emissions from Bicycle and Pedes- trian Infrastructure

$21,416,304

AC Yr 1 of 2

Quantity of GHG impact is in year 2



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 25

2024 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

610924

LAWRENCE- ROADWAY RECONSTRUCTION ON AMESBURY STREET

$8,028,654

Qualitative

$8,028,654

Not yet enough in- formation to generate an estimate



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 26

2025 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

608095

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN WAVERLY ROAD & WILLOW/MILL STREET

$13,239,974

Qualitative

RTP project included in the Statewide Model.

$34,083,859

AC Yr 2 of 4

612193

ANDOVER- BRIDGE PRESERVATION, A-09-

022, I-93 OVER

MERRIMACK RIVER

$38,102,400

Qualitative

No assumed impact/ negligible impact on emissions

$38,102,400

606522

ANDOVER- BRIDGE REHABILITATION, A-

09-036, I-495 OVER ST

28 (SB), A-09-037, I-495

OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

$12,325,976

Qualitative

No assumed impact/ negligible impact on emissions

$173,075,000

AC Yr 3 of 4



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 27

2025 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

612143

ANDOVER- BRIDGE REPLACEMENT, A-09-

015, TEWKSBURY STREET OVER MBTA/BMRR

$17,383,839

Qualitative

No assumed impact/ negligible impact on emissions

$17,383,839

612045

ANDOVER- TEWKSBURY- INTERSTATE MAINTENANCE AND RELATED WORK ON I-

93

$18,525,197

Qualitative

No assumed impact/ negligible impact on emissions

$18,525,197

609466

HAVERHILL- BRIDGE REPLACEMENT, H-12-

040, I-495 (NB & SB) OVER MERRIMACK RIVER

$39,813,300

Qualitative

No assumed impact/ negligible impact on emissions

$96,087,420

AC Yr 2 of 4.



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 28

2025 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

605304

HAVERHILL- BRIDGE REPLACEMENT, H-12-

007 & H-12-025, BRIDGE STREET (SR

125) OVER

MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY)

$30,900,000

Qualitative

No assumed impact/ negligible impact on emissions

$108,011,904

AC Yr 2 of 4.

612002

LAWRENCE – COMMUNITY DAY ARLINGTON IMPROVEMENTS (SRTS)

(# 612002)

$1,554,211

Qualitative

No assumed impact/ negligible impact on emissions

$1,554,211



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 29

2025 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

608930

LAWRENCE- LAWRENCE MANCHESTER RAIL CORRIDOR (LMRC) RAIL TRAIL

$20,416,304

Quantitative

175,927

Quantified Decrease in Emissions from Bi- cycle and Pedestrian Infrastructure

$21,416,304

AC Yr 2 of 2

612158

METHUEN- BRIDGE REPLACEMENT, M-17-

026, ROUTE 213

EB/WB OVER THE METHUEN RAIL TRAIL

$4,598,252

Qualitative

No assumed impact/ negligible impact on emissions

$4,598,252



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 30

2026 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

608095

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN WAVERLY ROAD & WILLOW/MILL STREET

$12,916,056

Qualitative

RTP project included in the Statewide Model.

$34,083,859

AC Yr 3 of 4

606522

ANDOVER- BRIDGE REHABILITATION, A-

09-036, I-495 OVER ST

28 (SB), A-09-037, I-495

OVER B&M AND MBTA, A-09-041, I-495 OVER ST 28 (NB)

$20,000,000

Qualitative

No assumed impact/ negligible impact on emissions

$173,075,000

AC Yr 4 of 4



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 31

2026 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

607542

GEORGETOWN- NEWBURY- BORDER TO BOSTON TRAIL, (NORTHERN GEORGETOWN TO BYFIELD SECTION)

$6,798,000

Quantitative

15,682

Quantified Decrease in Emissions from Bicycle and Pedestrian Infra- structure

$6,798,000

S12208

GROVELAND IMPROVEMENTS AT DR. ELMER BAGNALL ELEMENTARY (SRTS)

$1,858,080

Qualitative

Qualitative decrease in emissions

$1,858,080

609466

HAVERHILL- BRIDGE REPLACEMENT, H-12-

040, I-495 (NB & SB)

OVER MERRIMACK RIVER

$18,885,194

Qualitative

No assumed impact/ negligible impact on emissions

$96,087,420

AC Yr 3 of 4.



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 32

2026 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

605304

HAVERHILL- BRIDGE REPLACEMENT, H-12-

007 & H-12-025, BRIDGE STREET (SR

125) OVER MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY)

$30,600,000

Qualitative

No assumed impact/ negligible impact on emissions

$108,011,904

AC Yr 3 of 4.

612074

LAWRENCE – BRIDGE REPLACEMENT, L-04-

012, SHORT STREET

OVER SPICKET RIVER

$3,285,005

Qualitative

No assumed impact/ negligible impact on emissions

$3,285,005



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 33

2027 Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional In- formation

611977

AMESBURY- RIVERWALK CONNECTOR TO THE SALISBURY POINT GHOST TRAIL

$2,448,760

Quantitative

195

Quantified de- crease in emis- sions from bi- cycle and pe- destrian infra- structure

$2,448,760

608788

HAVERHILL- ROADWAY RECONSTRUCTION ON NORTH AVENUE, FROM MAIN STREET (ROUTE 125) TO PLAISTOW, NH

$5,798,257

Quantitative

214,372

Quantified De- crease in Emis- sions from Traffic Opera- tional Improve- ment

$23,600,997

AC YR 1 OF 3

608029

NEWBURYPORT- INTERSECTION IMPROVEMENTS ROUTE 1 & MERRIMAC STREET

$2,870,513

Qualitative

No assumed impact/ negligi- ble impact on emissions

$2,870,513

Not yet enough infor- mation to gen- erate an esti- mate



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 34

2027 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

608095

NORTH ANDOVER- CORRIDOR IMPROVEMENTS ON ROUTE 114, BETWEEN WAVERLY ROAD & WILLOW/MILL STREET

$2,495,393

Qualitative

RTP project in- cluded in the Statewide Model.

$34,083,859

AC Yr 4 of 4

605304

HAVERHILL- BRIDGE REPLACEMENT, H-12-

007 & H-12-025,

BRIDGE STREET (SR

125) OVER MERRIMACK RIVER AND THE ABANDONED B&M RR (PROPOSED BIKEWAY)

$25,911,904

Qualitative

No assumed impact/ negligi- ble impact on emissions

$108,011,904

AC Yr 4 of 4.



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 35

2027 (Cont.) Merrimack Valley Region MPO TIP Highway Projects GHG Tracking Summary

Mass DOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Total Cost

Additional

Information

609466

HAVERHILL- BRIDGE REPLACEMENT, H-12-

040, I-495 (NB & SB) OVER MERRIMACK RIVER

$16,000,000

Qualitative

No assumed impact/ negligible impact on emissions

$96,087,420

AC Yr 4 of 4.



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 36

2023 Merrimack Valley Region Transit Projects GHGs

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0010747

MVRTA Preventative Mainte- nance for Service

$3,730,510

Qualitative

No assumed impact/ negligible impact on emissions

$3,730,510

RTD0010748

MVRTA Operating Assis- tance for Service

$1,478,730

Qualitative

No assumed impact/ negligible impact on emissions

$1,478,730

RTD0010749

MVRTA ADA Paratransit

Service

$1,861,090

Qualitative

No assumed impact/ negligible impact on emissions

$1,861,090

RTD0010750

MVRTA Replace 8 Model Yr

2011 35’ buses delivery 2023

4,384,400

Qualitative

Qualitative Decrease in

Emissions.

4,384,400

RTD0010751

MVRTA Replace 6 Model Yr

2017 Type E-2 vans delivery

2023

$469,620

Qualitative

Qualitative Decrease in

Emissions.

$469,620



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 37

2023 Merrimack Valley Region Transit Projects GHGs (Cont.)

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0010752

MVMPO Short Range Transit

Planning

$100,000

Qualitative

No assumed impact/ negligible impact on emissions

$100,000

RTD0010758

MVRTA Replace 1 Model Yr

2017 supervisory vehicle

$50,335

Qualitative

No assumed impact/ negligible impact on emissions

$50,335

RTD0011300

MVRTA - BUY REPLACEMENT VAN

$469,620

Qualitative

Qualitative Decrease in

Emissions.

$469,620

RTD0011301

MVRTA - METROPOLITAN PLANNING

$65,000

Qualitative

No assumed impact/ negligible impact on emissions

$65,000

RTD0011304

MVRTA- BUY REPLACEMENTS- CAPITOL BUS

$2,983,200

Qualitative

Qualitative Decrease in

Emissions.

$2,983,200

RTD0011305

MVRTA - BUY REPLACEMENTS- CAPITOL BUS

$1,401,200

Qualitative

Qualitative Decrease in

Emissions.

$1,401,200



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 38

2023 Merrimack Valley Region Transit Projects GHGs (Cont.)

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0011306

MVRTA- REHAB/ RENOVATE - MISC EQUIPMENT

$1,700,000

Qualitative

No assumed impact/ negligible impact on emissions

$1,700,000

RTD0011307

MVRTA- ENG/DESIGN - ADMIN/MAINT FACILITY

$800,000

Qualitative

No assumed impact/ negligible impact on emissions

$800,000

RTDTBD13

MVR - 5339 Bus & Bus Facil- ity Discretionary: Improve- ments to the McGovern Transportation Center

$1,200,000

Qualitative

No assumed impact/ negligible impact on emissions

$1,200,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 39

2024 Merrimack Valley Region Transit Projects GHGs

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0010753

MVRTA Replace 8 model yr

2012 35’ buses delivery 2024

(8 of 8)

$4,703,200

Qualitative

Qualitative Decrease in

Emissions.

$4,703,200

RTD0010754

MVRTA Preventative Mainte- nance for Service

$3,618,265

Qualitative

No assumed impact/ negligible impact on emissions

$3,618,265

RTD0010755

MVRTA Operating Assis- tance for Service

$1,429,680

Qualitative

No assumed impact/ negligible impact on emissions

$1,429,680

RTD0010756

MVRTA ADA Paratransit

Service

$1,963,500

Qualitative

No assumed impact/ negligible impact on emissions

$1,963,500

RTD0010757

MVMPO Short Range Transit

Planning

$100,000

Qualitative

No assumed impact/ negligible impact on emissions

$100,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 40

2024 Merrimack Valley Region Transit Projects GHGs (Cont.)

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0010759

MVRTA Replace 1 Model Year 2018 Supervisory Vehi- cle

$51,845

Qualitative

No assumed impact/ negligible impact on emissions

$51,845

RTD0011302

MVRTA- METROPOLITAN PLANNING

$65,000

Qualitative

No assumed impact/ negligible impact on emissions

$65,000

RTD0011308

MVRTA- ENG/DESIGN - ADMIN/MAINT FACILITY

$1,250,000

Qualitative

No assumed impact/ negligible impact on emissions

$1,250,000

RTD0011309

MVRTA- CONSTRUCT ADMIN/MAINT FACILITY

$10,950,000

Qualitative

No assumed impact/ negligible impact on emissions

$10,950,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 41

2024 Merrimack Valley Region Transit Projects GHGs (Cont.)

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTDTBD14

MVRTA- 5339 Bus & Bus Facility Discretionary: Expan- sion of MVRTA Bus Mainte- nance Facility & Possible

New Bus Hub at Bradford

CR Station

$4,800,000

Qualitative

No assumed impact/ negligible impact on emissions

$4,800,000

RTDTBD15

MVRTA- 5307(h) Passenger Ferry Grant Discretionary Program: Capital costs for launch of Merrimack River ferryboat service between Haverhill and Newburyport

$750,000

Qualitative

Qualitative Decrease in

Emissions.

$750,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 42

2025 Merrimack Valley Region Transit Projects GHGs

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0010760

MVMPO Short Range Transit

Planning

$100,000

Qualitative

No assumed impact/ negligible impact on emissions

$100,000

RTD0010761

MVRTA Preventative Mainte- nance for Service

$3,690,630

Qualitative

No assumed impact/ negligible impact on emissions

$3,690,630

RTD0010762

MVRTA Operating Assis- tance for Service

$1,458,270

Qualitative

No assumed impact/ negligible impact on emissions

$1,458,270

RTD0010763

MVRTA ADA Paratransit

Service

$2,071,500

Qualitative

No assumed impact/ negligible impact on emissions

$2,071,500

RTD0010764

MVRTA Replace 1 Model Year 2019 Supervisory Vehi- cle

$53,400

Qualitative

No assumed impact/ negligible impact on emissions

$53,400



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 43

2025 Merrimack Valley Region Transit Projects GHGs (Cont.)

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0011303

MVRTA- METROPOLITAN PLANNING

$65,000

Qualitative

No assumed impact/ negligible impact on emissions

$65,000

RTD0011317

MVRTA- CONSTRUCT - MISC EQUIPMENT

$625,000

Qualitative

No assumed impact/ negligible impact on emissions

$625,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 44

2026 Merrimack Valley Region Transit Projects GHGs

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0010765

MVRTA- Preventative

Maintenance for service

$3,810,350

Qualitative

No assumed impact/ negligible impact on emissions

$3,810,350

RTD0010766

MVRTA- ADA Paratransit

Service

$2,185,500

Qualitative

No assumed impact/ negligible impact on emissions

$2,185,500

RTD0010767

Merrimack Valley MPO Short

Range Transit Planning

$100,000

Qualitative

No assumed impact/ negligible impact on emissions

$100,000

RTD0010768

MVRTA- Operating Assis- tance for Service

$1,502,020

Qualitative

No assumed impact/ negligible impact on emissions

$1,502,020

RTD0010769

MVRTA- Replace 1 Model Yr

2020 Supervisory Vehicle

$55,000

Qualitative

No assumed impact/ negligible impact on emissions

$55,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 45

2026 Merrimack Valley Region Transit Projects GHGs (Cont.)

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0011318

MVRTA- CONSTRUCT - MISC EQUIPMENT

$125,000

Qualitative

No assumed impact/ negligible impact on emissions

$125,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 46

2027 Merrimack Valley Region Transit Projects GHGs

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Programmed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0011311

MVRTA- OPERATING ASSISTANCE

$1,585,000

Qualitative

No assumed impact/ negligible impact on emissions

$1,585,000

RTD0011312

MVRTA- PREVENTIVE MAINTENANCE

$2,500,000

Qualitative

No assumed impact/ negligible impact on emissions

$2,500,000

RTD0011313

MVRTA- PLANNING

$120,000

Qualitative

No assumed impact/ negligible impact on emissions

$120,000

RTD0011314

MVRTA- NON FIXED ROUTE ADA PARA SERV

$2,305,700

Qualitative

No assumed impact/ negligible impact on emissions

$2,305,700

RTD0011315

MVRTA- BUY REPLACEMENT 35-FT BUS

$10,000,000

Qualitative

Qualitative Decrease in Emissions.

$10,000,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 47

2027 Merrimack Valley Region Transit Projects GHGs (Cont.)

MassDOT/ FTA Project ID

MassDOT/ FTA Project Description

Total Programmed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Total Cost

Total Cost

RTD0011316

MVRTA- CONSTRUCT - MISC EQUIPMENT

$5,000,000

Qualitative

No assumed impact/ negligible impact on emissions

$5,000,000

RTD0011319

MVRTA- CONSTRUCT - MISC EQUIPMENT

$125,000

Qualitative

No assumed impact/ negligible impact on emissions

$125,000



Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 48

CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project

FILL IN SHADED BOXES ONLY

TIP YEAR: 2027

MPO: Merrimack Valley Municipality: Amesbury

Project: Riverwalk Connector to the Salisbury Point Ghost Trail # 611977

Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):




If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :

A. Facility Length (L):

0.2

Miles

B. Service Area Radius (R):

1.0

Miles

(Default = 1

C. Service Area of Community(ies) (SA): L * 2R = SA

0.44

Sq. Miles

D. Total Land Area of Community(ies) (T):

12.3

Sq. Miles

E. Service Area % of Community(ies) Land Area (LA):

SA / T = LA

3.6%

F. Total Population of Community(ies) (TP):

17,366

Persons

G. Population Served by Facility (P): LA * TP = P

621

Persons

H. Total Number of Households in Community(ies) (HH):

7,215

HH

I.

Number of Households Served by Facility (HS): LA * HH = HS

258

HH

J.

Total Number of Workers Residing in Community(ies) (W):

9,688

Persons

K.

Workers Per household (WPHH): W / HH = WPHH

1.34

Persons


L. Workers in Service Area (WSA): HS * WPHH = WSA 347 Persons

M. Population Density of the Service area (PD): P / SA = PD 1,412 Persons Per Sq. Mile

N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the right. (BMS) 1.4% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage.

http://www.census.gov/programs-surveys/acs/guidance/estimates.html

O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 5 One-Way Trips

P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 8 One-Way Trips

(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)

Step 2: Calculate the VMT Reduction Per Day:

A. ((2 * BWT) + (2 * BNWT)) * (0.5* L) = VMTR 2.9 VMTR Per Day

B. VMTR * Operating Days Per Year 2.9 * 200 = 576 VMTR Per Year If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year Note: A manual entry of the VMTR will override the calculated cell.



Step 3: Emission Factors for Unrestricted PM:

Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern or Western Eastern

2020 Passenger

2020 Passenger

2020 Passenger

2020 Passenger

Summer VOC Factor

Summer NOx Factor

Summer CO Factor

Summer CO2 Factor

grams/mile

grams/mile

grams/mile

grams/mile

0.030

0.081

2.095

338.769

Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):





Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)

Project Emission Reduction First year cost

Emission Cost in kg per year per kilogram

Summer VOC Summer NOx Summer CO

Summer CO2

/ 0.0 = $119,826,223

/ 0.0 = $44,380,083

/ 1.2 = $1,715,889

/ 195.3 = $10,811

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 49

CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project

FILL IN SHADED BOXES ONLY

TIP YEAR:

2025

MPO:

Merrimack Valley

Municipality:

Georgetown, Boxford

Project: # 607541 Georgetown-Boxford Border to Boston Trail

Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):




If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :

A. Facility Length (L):

2.0

Miles

B. Service Area Radius (R):

1.0

Miles

(Default = 1 Mile)

C. Service Area of Community(ies) (SA): L * 2R = SA

4

Sq. Miles

D. Total Land Area of Community(ies) (T):

36.5

Sq. Miles

E. Service Area % of Community(ies) Land Area (LA):

SA / T = LA

11.0%

F. Total Population of Community(ies) (TP):

16,579

Persons

G. Population Served by Facility (P): LA * TP = P

1,817

Persons

H. Total Number of Households in Community(ies) (HH):

5,828

HH

I.

Number of Households Served by Facility (HS): LA * HH = HS

639

HH

J.

Total Number of Workers Residing in Community(ies) (W):

8,647

Persons

K.

Workers Per household (WPHH): W / HH = WPHH

1.48

Persons


L. Workers in Service Area (WSA): HS * WPHH = WSA 948 Persons

M. Population Density of the Service area (PD): P / SA = PD 454 Persons Per Sq. Mile

N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the right. (BMS) 0.8% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage.

http://www.census.gov/programs-surveys/acs/guidance/estimates.html

O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 7 One-Way Trips

P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 12 One-Way Trips

(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)

Step 2: Calculate the VMT Reduction Per Day:

A. ((2 * BWT) + (2 * BNWT)) * (0.5* L) = VMTR 39.4 VMTR Per Day

B. VMTR * Operating Days Per Year 39.4 * 200 = 7,872 VMTR Per Year If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year Note: A manual entry of the VMTR will override the calculated cell.



Step 3: MOVES 2014a Emission Factors for Unrestricted PM:

Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern or Western Eastern

2020 Passenger

2020 Passenger

2020 Passenger

2020 Passenger

Summer VOC Factor

Summer NOx Factor

Summer CO Factor

Summer CO2 Factor

grams/mile

grams/mile

grams/mile

grams/mile

0.030

0.081

2.095

338.769

Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):





Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)

Project Emission Reduction First year cost

Emission Cost in kg per year per kilogram

Summer VOC Summer NOx Summer CO

Summer CO2

/ 0.2 = $10,139,736

/ 0.7 = $3,712,090

/ 16.8 = $144,253

/ 2,666.9 = $909

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 50

CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project

FILL IN SHADED BOXES ONLY

TIP YEAR: 2025

MPO: Merrimack Valley Municipality: Georgetown/Newbury

Project: # 607542 Georgetown-Newbury Border to Boston Trail

Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):




If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :

A. Facility Length (L):

3.6

Miles

B. Service Area Radius (R):

1.0

Miles

(Default = 1 Mile)

C. Service Area of Community(ies) (SA): L * 2R = SA

7.2

Sq. Miles

D. Total Land Area of Community(ies) (T):

36.3

Sq. Miles

E. Service Area % of Community(ies) Land Area (LA):

SA / T = LA

19.8%

F. Total Population of Community(ies) (TP):

15,088

Persons

G. Population Served by Facility (P): LA * TP = P

2,993

Persons

H. Total Number of Households in Community(ies) (HH):

5,808

HH

I.

Number of Households Served by Facility (HS): LA * HH = HS

1,152

HH

J.

Total Number of Workers Residing in Community(ies) (W):

8,055

Persons

K.

Workers Per household (WPHH): W / HH = WPHH

1.39

Persons


L. Workers in Service Area (WSA): HS * WPHH = WSA 1,598 Persons

M. Population Density of the Service area (PD): P / SA = PD 416 Persons Per Sq. Mile

N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the right. (BMS) 1.5% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage.

http://www.census.gov/programs-surveys/acs/guidance/estimates.html

O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 24 One-Way Trips

P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 40 One-Way Trips

(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)

Step 2: Calculate the VMT Reduction Per Day:

A. ((2 * BWT) + (2 * BNWT)) * (0.5* L) = VMTR 231.5 VMTR Per Day

B. VMTR * Operating Days Per Year 231.5 * 200 = 46,290 VMTR Per Year If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year Note: A manual entry of the VMTR will override the calculated cell.



Step 3: MOVES 2014a Emission Factors for Unrestricted PM:

Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern or Western Eastern

2020 Passenger

2020 Passenger

2020 Passenger

2020 Passenger

Summer VOC Factor

Summer NOx Factor

Summer CO Factor

Summer CO2 Factor

grams/mile

grams/mile

grams/mile

grams/mile

0.030

0.081

2.095

338.769

Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):





Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)

Project Emission Reduction First year cost

Emission Cost in kg per year per kilogram

Summer VOC Summer NOx Summer CO

Summer CO2

/ 1.4 = $3,611,802

/ 3.8 = $1,322,257

/ 98.8 = $51,383

/ 15,681.6 = $363

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 51

CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements

FILL IN SHADED BOXES ONLY

TIP YEAR: 2027

MPO:

Merrimack Valley

Municipality:

Haverhill

Project:

North Avenue Reconstruction

Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 19 + SB = 48 + EB = 114 + WB = 45,632 +

= 5,240 +

= 5,781 +

= 85 +

= 0 +

= 1,542 = 6,801

= 19 = 5,849

= 341 = 540

= 9,663 = 55,295

Total Intersection Delay/Seconds = 68,485

Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 19 + SB = 95 + EB = 60 + WB = 201,895 +

= 15,059 +

= 16,022 +

= 30 +

= 0 +

= 4,571 = 19,649

= 95 = 16,213

= 510 = 600

= 33,895 = 235,789

Total Intersection Delay/Seconds = 272,251

Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.

Peak Hour (AM/PM): PM

Total Intersection Delay:

272,251

Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB SB EB WB

Step 5: Calculate vehicle delay in hours per day:

= 19 +

= 95 +

= 60 +

= 138,731 +

= 15,059 +

= 16,022 +

= 30 +

= 0 +

= 4,571 = 19,649

= 95 = 16,213

= 508 = 598

= 23,291 = 162,021

Total Intersection Delay/Seconds = 198,481

Existing peak hour intersection delay

Peak hour intersection delay w/ improvements

( Delay in seconds

( 272,251

( 198,481

X Hours per day) / X 10 ) / X 10 ) /

Seconds per hour

3600

3600

= Delay in hours / day

= 756.3

= 551.3

Step 6: MOBILE 6 emission factors for idling speed: AM or PM PM

2020 2020 2020 2020

Summer VOC Factor Summer NOx Factor Winter CO Factor Summer CO2 Factor grams/hour grams/hour grams/hour grams/hour

0.249 0.630 3.569 3565.610

Step 7: Calculate net emissions change in kilograms per day:

Delay in Summer VOC Emissions Summer NOx Emissions Winter CO Emissions Summer CO2 Emissions

Hours per Day kilograms/day kilograms/day kilograms/day kilograms/day

Existing Conditions 756.3

With Improvements 551.3

Net Change

0.188

0.137

-0.051

0.476

0.347

-0.129

2.699

1.968

-0.731

2,696.505

1,965.847

-730.658

Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)

Net change Avg. weekdays

Seasonal adj.

Adj. net change

per day (kg) X

per year

X factor =

in kg per year

Summer VOC Emissions -0.051 X 250 X 1.0188 = Summer NOx Emissions -0.129 X 250 X 1.0188 = Winter CO Emissions -0.731 X 250 X 0.9812 = Summer CO2 Emissions -730.658 X 250 X 1.0000

Calculate cost effectiveness (first year cost per kg of emissions reduced)

-12.996

-32.881

-179.401

-182,664.532

Project

Adj. net change

First year cost


Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 52

CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements

FILL IN SHADED BOXES ONLY

TIP YEAR: 2027

MPO:

Merrimack Valley

Municipality:

Haverhill

Project:

North Avenue Reconstruction North Ave Marsh and Tenadel Aves.

Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 18 + SB = 1,110 + EB = 94 + WB = 477 +

= 2,379 +

= 3,608 +

= 0 +

= 0 +

= 177 = 2,573

= 0 = 4,718

= 125 = 220

= 2,317 = 2,794

Total Intersection Delay/Seconds = 10,305

Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

Marsh Ave

North Ave

Tenadel Ave

North Ave

Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.

Peak Hour (AM/PM): PM

Total Intersection Delay:

23,087

Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB SB EB WB

Step 5: Calculate vehicle delay in hours per day:

= 23 +

= 1,266 +

= 4 +

= 251 +

= 6,472 +

= 2,460 +

= 0 +

= 9 +

= 250 = 6,745

= 0 = 3,727

= 8 = 13

= 3,740 = 3,999

Total Intersection Delay/Seconds = 14,484

Existing peak hour intersection delay

Peak hour intersection delay w/ improvements

( Delay in seconds

( 23,087

( 14,484

X Hours per day) / X 10 ) / X 10 ) /

Seconds per hour

3600

3600

= Delay in hours / day

= 64.1

= 40.2

Step 6: MOBILE 6 emission factors for idling speed: AM or PM PM

2020 2020 2020 2020

Summer VOC Factor Summer NOx Factor Winter CO Factor Summer CO2 Factor grams/hour grams/hour grams/hour grams/hour

0.249 0.630 3.569 3565.610

Step 7: Calculate net emissions change in kilograms per day:

Delay in Summer VOC Emissions Summer NOx Emissions Winter CO Emissions Summer CO2 Emissions

Hours per Day kilograms/day kilograms/day kilograms/day kilograms/day

Existing Conditions 64.1

With Improvements 40.2

Net Change

0.016

0.010

-0.006

0.040

0.025

-0.015

0.229

0.144

-0.085

228.665

143.457

-85.208

Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)

Net change Avg. weekdays

Seasonal adj.

Adj. net change

per day (kg) X

per year

X factor =

in kg per year

Summer VOC Emissions -0.006 X 250 X 1.0188 = Summer NOx Emissions -0.015 X 250 X 1.0188 = Winter CO Emissions -0.085 X 250 X 0.9812 = Summer CO2 Emissions -85.208 X 250 X 1.0000

Calculate cost effectiveness (first year cost per kg of emissions reduced)

-1.516

-3.835

-20.921

-21,301.913

Project

Adj. net change

First year cost


Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 53

CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements

FILL IN SHADED BOXES ONLY

TIP YEAR: 2027

MPO:

Merrimack Valley

Municipality:

Haverhill

Project:

North Avenue Reconstruction North Ave, Gile St and West Gile St

Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 0 + SB = 245 + EB = 0 + WB = 2,931 +

= 3,286 +

= 5,836 +

= 0 +

= 0 +

= 546 = 3,832

= 9 = 6,090

= 44 = 44

= 1,127 = 4,059

Total Intersection Delay/Seconds = 14,023

Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 0 + SB = 409 + EB = 0 + WB = 11,217 +

= 8,053 +

= 5,343 +

= 0 +

= 0 +

= 1,011 = 9,064

= 0 = 5,752

= 0 = 0

= 7,276 = 18,493

Total Intersection Delay/Seconds = 33,309

Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.

Peak Hour (AM/PM): PM

Total Intersection Delay:

33,309

Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB SB EB WB

Step 5: Calculate vehicle delay in hours per day:

= 0 +

= 409 +

= 0 +

= 13,320 +

= 8,053 +

= 5,343 +

= 0 +

= 0 +

= 1,011 = 9,064

= 0 = 5,752

= 0 = 0

= 970 = 14,290

Total Intersection Delay/Seconds = 29,106

Existing peak hour intersection delay

Peak hour intersection delay w/ improvements

( Delay in seconds

( 33,309

( 29,106

X Hours per day) / X 10 ) / X 10 ) /

Seconds per hour

3600

3600

= Delay in hours / day

= 92.5

= 80.9

Step 6: MOBILE 6 emission factors for idling speed: AM or PM PM

2020 2020 2020 2020

Summer VOC Factor Summer NOx Factor Winter CO Factor Summer CO2 Factor grams/hour grams/hour grams/hour grams/hour

0.249 0.630 3.569 3565.610

Step 7: Calculate net emissions change in kilograms per day:

Delay in Summer VOC Emissions Summer NOx Emissions Winter CO Emissions Summer CO2 Emissions

Hours per Day kilograms/day kilograms/day kilograms/day kilograms/day

Existing Conditions 92.5

With Improvements 80.9

Net Change

0.023

0.020

-0.003

0.058

0.051

-0.007

0.330

0.289

-0.042

329.905

288.282

-41.624

Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)

Net change Avg. weekdays

Seasonal adj.

Adj. net change

per day (kg) X

per year

X factor =

in kg per year

Summer VOC Emissions -0.003 X 250 X 1.0188 = Summer NOx Emissions -0.007 X 250 X 1.0188 = Winter CO Emissions -0.042 X 250 X 0.9812 = Summer CO2 Emissions -41.624 X 250 X 1.0000

Calculate cost effectiveness (first year cost per kg of emissions reduced)

-0.740

-1.873

-10.220

-10,405.951

Project

Adj. net change

First year cost


Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 54

CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project

FILL IN SHADED BOXES ONLY

TIP YEAR:

2023

MPO:

Merrimack Valley

Municipality:

Lawrence

Project: Lawrence Manchester Rail Corriodr (LMRC) Rail Trail Project # 608930

Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):




If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :

A. Facility Length (L):

1.5

Miles

B. Service Area Radius (R):

1.0

Miles

(Default = 1 Mile)

C. Service Area of Community(ies) (SA): L * 2R = SA

2.92

Sq. Miles

D. Total Land Area of Community(ies) (T):

6.93

Sq. Miles

E. Service Area % of Community(ies) Land Area (LA):

SA / T = LA

42.1%

F. Total Population of Community(ies) (TP):

79,337

Persons

G. Population Served by Facility (P): LA * TP = P

33,429

Persons

H. Total Number of Households in Community(ies) (HH):

25,759

HH

I.

Number of Households Served by Facility (HS): LA * HH = HS

10,854

HH

J.

Total Number of Workers Residing in Community(ies) (W):

33,261

Persons

K.

Workers Per household (WPHH): W / HH = WPHH

1.29

Persons


L. Workers in Service Area (WSA): HS * WPHH = WSA 14,015 Persons

M. Population Density of the Service area (PD): P / SA = PD 11,448 Persons Per Sq. Mile

N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the right. (BMS) 4.7% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage.

http://www.census.gov/programs-surveys/acs/guidance/estimates.html

O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 659 One-Way Trips

P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 1,120 One-Way Trips

(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)

Step 2: Calculate the VMT Reduction Per Day:

A. ((2 * BWT) + (2 * BNWT)) * (0.5* L) = VMTR 2596.6 VMTR Per Day

B. VMTR * Operating Days Per Year 2,596.6 * 200 = 519,313 VMTR Per Year If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year Note: A manual entry of the VMTR will override the calculated cell.



Step 3: MOVES 2014a Emission Factors for Unrestricted PM:

Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern or Western Eastern

2020 Passenger

2020 Passenger

2020 Passenger

2020 Passenger

Summer VOC Factor

Summer NOx Factor

Summer CO Factor

Summer CO2 Factor

grams/mile

grams/mile

grams/mile

grams/mile

0.030

0.081

2.095

338.769

Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):





Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)

Project Emission Reduction First year cost

Emission Cost in kg per year per kilogram

Summer VOC Summer NOx Summer CO

Summer CO2

/ 15.8 = $1,306,100

/ 43.1 = $478,155

/ 1,108.2 = $18,581

/ 175,927.3 = $117

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 55

CMAQ Air Quality Analysis Worksheet for Traffic Flow and Intersection Improvements

FILL IN SHADED BOXES ONLY

TIP YEAR: 2023

MPO:

Merrimack Valley

Municipality:

Methuen

Project:

# 610658 Intersection Improvements at Methuen Riverside Dr and Burnham Rd

Step 1: Calculate Existing AM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 35 + SB = 2,293 + EB = 111 + WB = 1 +

= 35 +

= 382 +

= 553 +

= 61 +

= 159 = 230

= 2,407 = 5,082

= 4 = 668

= 17 = 79

Total Intersection Delay/Seconds = 6,058

Step 2: Calculate Existing PM Peak Hour Total Intersection Delay in Seconds:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 25 + SB = 100,445 + EB = 244 + WB = 8 +

= 246 +

= 6,623 +

= 962 +

= 208 +

= 296 = 567

= 41,944 = 149,012

= 12 = 1,218

= 67 = 283

Total Intersection Delay/Seconds = 151,079

Step 3: The spreadsheet automatically chooses the peak hour with the longer total intersection delay for the next step in the analysis.

Peak Hour (AM/PM): PM

Total Intersection Delay:

151,079

Step 4: Calculate the existing PM Peak Hour Total Intersection Delay with Improvements:

Left-Turns Total Thru Total Right-Turns Total Total

Street Name Dir (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

+ (Vol / PHF) X delay per veh

= move. delay

= approach delay

NB = 9 + SB = 2,452 + EB = 985 + WB = 224 +

= 95 +

= 162 +

= 3,879 +

= 5,530 +

= 114 = 218

= 1,024 = 3,638

= 49 = 4,914

= 1,778 = 7,532

Total Intersection Delay/Seconds = 16,302

Step 5: Calculate vehicle delay in hours per day:

(

Delay in seconds

X Hours per day) /

Seconds per hour

= Delay in hours / day

Existing peak hour intersection delay (

Peak hour intersection delay w/ improvements (

151,079

16,302

X 10 ) /

X 10 ) /

3600

3600

= 419.7

= 45.3

Step 6: MOBILE 6 emission factors for idling speed: AM or PM PM

2020 2020 2020 2020

Summer VOC Factor Summer NOx Factor Winter CO Factor Summer CO2 Factor grams/hour grams/hour grams/hour grams/hour

0.249 0.630 3.569 3565.610

Step 7: Calculate net emissions change in kilograms per day:

Delay in Summer VOC Emissions Summer NOx Emissions Winter CO Emissions Summer CO2 Emissions

Hours per Day kilograms/day kilograms/day kilograms/day kilograms/day

Existing Conditions 419.7

With Improvements 45.3

Net Change

0.104

0.011

-0.093

0.264

0.029

-0.236

1.498

0.162

-1.336

1,496.360

161.461

-1,334.900

Step 8: Calculate net emissions change in kilograms per year (seasonally adjusted)

Net change Avg. weekdays

Seasonal adj.

Adj. net change

per day (kg) X

per year

X factor =

in kg per year

Summer VOC Emissions -0.093 X 250 X 1.0188 = Summer NOx Emissions -0.236 X 250 X 1.0188 = Winter CO Emissions -1.336 X 250 X 0.9812 = Summer CO2 Emissions -1,334.900 X 250 X 1.0000

Calculate cost effectiveness (first year cost per kg of emissions reduced)

-23.743

-60.074

-327.762

-333,724.936

Emission

Project

Cost /

Adj. net change

in kg per year =

First year cost

per kilogram

Summer VOC / Summer NOx / Winter CO /

Summer CO2 /

-23.743 =

-60.074 =

-327.762 =

-333,724.936 =

$39,169

$15,481

$2,837

$3


Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 56

CMAQ Air Quality Analysis Worksheet for Bicycle and Pedestrian Project

FILL IN SHADED BOXES ONLY

TIP YEAR: 2023

MPO: Merrimack Valley Municipality: Salisbury

Project: # 602202 Reconstruction of Route 1 (Lafayette Road) Shared Use Path

Step 1: Calculate Estimated Reduction in Vehicle Miles Traveled (VMT):




If VMT reduction per year is known then go to Step 2B, if not proceed with Step 1 :

A. Facility Length (L):

2.1

Miles

B. Service Area Radius (R):

1.0

Miles

(Default = 1 Mile)

C. Service Area of Community(ies) (SA): L * 2R = SA

4.2

Sq. Miles

D. Total Land Area of Community(ies) (T):

15.4

Sq. Miles

E. Service Area % of Community(ies) Land Area (LA):

SA / T = LA

27.3%

F. Total Population of Community(ies) (TP):

9,379

Persons

G. Population Served by Facility (P): LA * TP = P

2,558

Persons

H. Total Number of Households in Community(ies) (HH):

3,889

HH

I.

Number of Households Served by Facility (HS): LA * HH = HS

1,061

HH

J.

Total Number of Workers Residing in Community(ies) (W):

6,059

Persons

K.

Workers Per household (WPHH): W / HH = WPHH

1.56

Persons


L. Workers in Service Area (WSA): HS * WPHH = WSA 1,652 Persons

M. Population Density of the Service area (PD): P / SA = PD 609 Persons Per Sq. Mile

N. If the bicycle and pedestrian commuter mode share is known, enter the percentage at the right. (BMS) 4.4% If not, use US Census - American Community Survey data to determine the mode share and enter the percentage.

http://www.census.gov/programs-surveys/acs/guidance/estimates.html

O. Bike and Ped. Work Utilitarian Trips (BWT): WSA * BMS = BWT 73 One-Way Trips

P. Bike and Ped. Non-Work Utilitarian Trips (BNWT): BWT * 1.7 = BNWT 124 One-Way Trips

(Latest planning assumptions estimate non-work utilitarian trips to be 1.7 times the work utilitarian.)

Step 2: Calculate the VMT Reduction Per Day:

A. ((2 * BWT) + (2 * BNWT)) * (0.5* L) = VMTR 412.3 VMTR Per Day

B. VMTR * Operating Days Per Year 412.3 * 200 = 82,451 VMTR Per Year If the Vehicle Miles Traveled Reduction is known enter in the box to the right. VMTR Per Year Note: A manual entry of the VMTR will override the calculated cell.



Step 3: Emission Factors for Unrestricted PM:

Note: Use 35 MPH as a default if average speed is not known. Speed Used: 35 MPH Eastern or Western Eastern

2020 Passenger

2020 Passenger

2020 Passenger

2020 Passenger

Summer VOC Factor

Summer NOx Factor

Summer CO Factor

Summer CO2 Factor

grams/mile

grams/mile

grams/mile

grams/mile

0.030

0.081

2.095

338.769

Step 4: Calculate emissions reductions in kilograms per year (Seasonally Adjusted):





Step 5: Calculate cost effectiveness (first year cost per kg of emissions reduced)

Project Emission Reduction First year cost

Emission Cost in kg per year per kilogram

Summer VOC Summer NOx Summer CO

Summer CO2

/ 2.5 = $378,567

/ 6.8 = $140,210

/ 176.0 = $5,421

/ 27,931.8 = $34

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 57

Appendix F Completed Highway and Transit Projects GHG Summary

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 58

Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary

Mass DOT/ Project ID

MassDOT Project

Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Additional

Description

Fiscal Year of Contract Award (2015 and forward)

606503

NEWBURYPORT CLIPPER CITY RAIL TRAIL ALONG THE CITY BRANCH (PHASE II)

$4,061,158

Quantitative

34,996

Quantified Decrease in Emissions from Bicycle and Pedestrian Infra- structure

Advertised

9/19/2015

Notice to Pro- ceed

4/1/2016

2016

606161

HAVERHILL- IMPROVEMENTS ON MAIN STREET (ROUTE

125)

$3,635,519

Quantitative

16,491

Quantified Decrease in Emissions from Traffic Operational Improve- ment

Advertised

9/17/2016

Notice to Pro- ceed

4/12/2017

2017

607573

HAVERHILL- RECONSTRUCTION ON ROUTE 97 (BROADWAY), FROM SILVER BIRCH LANE TO RESEARCH DRIVE

$6,526,912

Quantitative

41,800

Quantified Decrease in Emissions from Traffic Operational Improve- ment

Advertised

5/13/2017

Notice to Pro- ceed

2/9/2018

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 59

Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary

(Cont.)

Mass DOT/ Project ID

MassDOT Project

Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Im- pact (kg/yr)

GHG Impact

Description

Additional

Description

Fiscal Year of Contract Award (2015 and forward)

604585

FLEX TO FTA FOR MVRTA NEW BUS UPGRADE TO CLEANER FUEL BUSES

$645,840

Quantitative

26,343

Quantified Decrease in Emissions from Bus Replacement

Flexed to

FTA

2017

605020

SALISBURY- MULTI- USE TRAIL EXTENSION (BORDERS TO BOSTON TRAIL), INCLUDES NEW BRIDGE S-02-004 AND BOARDWALK (S-02-

012) (BYX)

$5,918,500

Quantitative

18,631

Quantified Decrease in Emissions from Bicycle and Pedestrian Infra- structure

Advertised

8/25/2018

Contract

Awarded

12/12/18

Notice to Pro- ceed 1/18/19

2018

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 60

Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary

(Cont.)

Mass DOT/ Project ID

MassDOT Project

Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Additional

Description

Fiscal Year of Contract Award (2015 and forward)

602418

AMESBURY- RECONSTRUCTION OF ELM STREET

$11,178,124

Quantitative

1,336

Quantified Decrease in Emissions from Complete Streets Project

Advertised

7/13/2019. Notice to Pro- ceed

12/13/19.

AC 2019 and

2020

607737

AMESBURY- SALISBURY- TRAIL CONNECTOR @ I-95

$2,574,805

Quantitative

3,972

Quantified Decrease in Emissions from Bicycle and Pedes- trian Infrastructure

Advertised

9/15/2018

Notice to Pro- ceed 4/18/19

2019

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 61

Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary

(Cont.)

Mass DOT/ Project ID

MassDOT Project

Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Additional

Description

Fiscal Year of Contract Award (2015 and forward)

606159

NORTH ANDOVER- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 125 & MASSACHUSETTS AVENUE

$5,446,662

Quantitative

482,727

Quantified Decrease in Emissions from Traffic Operational Improvement

Advertised

1/12/2019

Notice to Pro- ceed 8/14/19

2019

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 62

Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary

(Cont.)

Mass DOT/ Project ID

MassDOT Project

Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Additional

Description

Fiscal Year of Contract Award (2015 and forward)

608027

HAVERHILL- BRADFORD RAIL TRAIL EXTENSION, FROM ROUTE 125 TO RAILROAD STREET

$1,766,108

Quantitative

422

Quantified Decrease in Emissions from Bicycle and Pedes- trian Infrastructure

Notice to Pro- ceed

10/23/2020

2020

609251

LAWRENCE – INTERSECTION IMPROVEMENTS AT SOUTH BROADWAY (ROUTE 28) AND MOUNT VERNON STREET

$1,218,368

Quantitative

380,222

Quantified Decrease in Emissions from Traffic Operational Improvement

Advertised

1/16/2021

2021

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 63

Merrimack Valley Region MPO TIP Completed Highway Projects GHG Tracking Summary

(Cont.)

Mass DOT/ Project ID

MassDOT Project

Description

Total Pro- grammed Funds

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Additional

Description

Fiscal Year of Contract Award (2015 and forward)

608298

Groveland – Community Trail from Main Street to King Street

$2,954,832

Quantitative

2,710

Quantified Decrease in Emissions from Bicycle and Pedes- trian Infrastructure

Notice to Pro- ceed

9/27/2021

2021

608761

Haverhill – Intersection

Reconstruction on Rt.

108 (Newton Road) at Rt. 110 (Kenoza Ave. and Amesbury Rd.)

$3,376,283

Quantitative

8,307

Quantified Decrease in Emissions from Traffic Operational Improvement

Advertised

8/21/21. Notice to Pro- ceed

10/22/21.

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 64

Merrimack Valley Region MPO TIP Completed Transit Projects GHG Tracking Summary

FTA Activity Line Item

Transit

Agency

Project

Description

Total

Cost

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Additional Descrip- tion

Fiscal Year Pro- grammed (2015 and forward)

MVRTA

Purchase Re- placement Vans

11 Model Year

2009 Delivery

2015

$627,000

Quantitative

41,814

Quantified Decrease in Emissions from Bus Replacement

2015

111202

MVRTA

Replace 10 of 17

Model Year 2004

Transit Buses with new buses (Deliv- ery 2016)

$4,200,000

Quantitative

12,557

Quantified Decrease in Emissions from Bus Replacement

2015

111215

MVRTA

Replace 5 Model Year 2011 Para- transit Vehicles (Delivery 2016)

$320,000

Quantitative

15,992

Quantified Decrease in Emissions from Bus Replacement

2016

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 65

Merrimack Valley Region MPO TIP Completed Transit Projects GHG Tracking Summary

(Cont.)

FTA Activity Line Item

Transit

Agency

Project

Description

Total

Cost

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Additional Descrip- tion

Fiscal Year Pro- grammed (2015 and forward)

111202

MVRTA

Replace 7 MY

2004 Transit Buses with new buses

$2,989,000

Quantitative

18,271

Quantified Decrease in Emissions from Bus Replacement

2017

111202

MVRTA

Replace 6 Model Year 2004 Buses (Delivery 2018)

$2,689,500

Quantitative

15,661

Quantified Decrease in Emissions from Bus Replacement

2018

RTD00

07687

MVRTA

Replace 3 Model Yr 2007 buses de- livery 2020

$1,377,150

Quantitative

8,166

Quantified Decrease in Emissions from Bus

Replacement

2020

RTD00

08596

MVRTA

Replace 16 Model Yr 2015 vans with new delivery 2021

$1,180,480

Quantitative

33,208

Quantified Decrease in Emissions from Bus

Replacement

2021

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 66

Merrimack Valley Region MPO TIP Completed Transit Projects GHG Tracking Summary

(Cont.)

FTA Activity Line Item

Transit

Agency

Project

Description

Total

Cost

GHG Analysis Type

GHG CO2

Impact

(kg/yr)

GHG Impact

Description

Additional Descrip- tion

Fiscal Year Pro- grammed (2015 and forward)

RTD00

09673

MVRTA

MVRTA Replace 9

Model Yr 2009 35’

buses delivery

2022

$4,458,030

Quantitative

25,777

Quantified Decrease in Emissions from Bus Replacements

2022

Draft FFYs 2023-2027 MVMPO TIP April 2022 Appendix 67

Appendix G List of Acronyms

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 68

MVMPO List of Commonly Used Acronyms

A

AADT

Average Annual Daily Traffic

AASHTO

American Association of State Highway Transpor- tation Officials

ABP

MassDOT Accelerated Bridge Program

AC

Advance Construction

ADA

Americans with Disabilities Act (1990)

ADT

Average Daily Traffic

AQ

Air Quality

B

B to B

Border to Boston Rail Trail

BFP

Bridge Formula Program

BIL

Bipartisan Infrastructure Bill (BIL) signed into law as the Infrastructure Investment and Jobs Act No- vember 15, 2021 Public Law 117-58

C

3C

Continuing, Comprehensive and Coordinated

(Transportation Planning)

CAAA

Clean Air Act Amendments of 1990

CFR

Code of Federal Regulations

CIP

Capital Investment Plan

CLF

Conservation Law Foundation

CMAQ

Congestion Mitigation and Air Quality Improve- ment Program

CMP

Congestion Management Process

CMR

Code of Massachusetts Regulations

CNG

Compressed Natural Gas

CO

Carbon Monoxide

CO2

Carbon Dioxide

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 69

MVMPO List of Commonly Used Acronyms (Cont.)

C

(Cont.)

CRRSAA

Coronavirus Response and Relief Supplemental

Appropriations Act

D

DEP

Department of Environmental Protection

DOT

Department of Transportation

DPW

Department of Public Works

E

EB

Eastbound

EIR

Environmental Impact Report

EIS

Environmental Impact Statement

EJ

Environmental Justice

ENF

Environmental Notification Form

E.O.

Executive Order (of the Governor of the Common- wealth)

EPA

U.S. Environmental Protection Agency

F

FA

Federal-Aid

FAPRO

Federal Aid Program Reimbursement Office

FAST Act

Fixing America’s Surface Transportation Act legis- lation signed into law December 4, 2015

FHWA

Federal Highway Administration

FTA

Federal Transit Administration

FY

(State) Fiscal Year

FFY

Federal Fiscal Year

G

GANs

Grant Anticipation Notes

GHG

Greenhouse Gas

H

HPP

USDOT High Priority Project

HSIP

Highway Safety Improvement Program

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 70

MVMPO List of Commonly Used Acronyms (Cont.)

I

IIJA

Infrastructure Investment and Jobs Act signed into law November 15, 2021 Public Law 117-58 also known as the Bipartisan Infrastructure Bill (BIL)

I

IM

Interstate Maintenance

ITS

Intelligent Transportation System

ISTEA

Intermodal Surface Transportation Efficiency Act of

1991

L

LEP

Limited English Proficiency

LOS

Level of Service

LTA

Local Technical Assistance

M

MAP

Mobility Assistance Program

MAP-21

Moving Ahead for Progress in the 21st Century legis- lation signed into law July 6, 2012

MassDOT

Massachusetts Department of Transportation

MCAD

Massachusetts Commission Against Discrimination

MEPA

Massachusetts Environmental Policy Act

M.G.L.

Massachusetts General Laws

MOA

Memorandum of Agreement

MOD

Massachusetts Office on Disabilities

MOU

Memorandum of Understanding

MPO

Metropolitan Planning Organization

MVMPO

Merrimack Valley Metropolitan Planning Organiza- tion

MVPC

Merrimack Valley Planning Commission

MVPGS

Merrimack Valley Priority Growth Strategy

MVRTA

Merrimack Valley Regional Transit Authority

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 71

MVMPO List of Commonly Used Acronyms (Cont.)

N

NAAQS

National Ambient Air Quality Standards

NARC

National Association of Regional Councils

NB

Northbound

NEPA

National Environmental Policy Act

NFA

Non-Federal Aid

NGBP

Next Generation Bridge Program

NHS

National Highway System

NMCOG

Northern Middlesex Council of Governments

NOx

Nitrogen Oxide

NPRM

Notice of Proposed Rulemaking (Federal Register)

O&M

Operations and Maintenance

OTP

MassDOT Office of Transportation Planning

P

PCI

Pavement Condition Index

PDA

Priority Development Area

PL

(Metropolitan) Planning Funds

PMS

Pavement Management System

PPP

Public Participation Plan

PRC

(MassDOT) Project Review Committee

PSAC

Project Selection Advisory Council

PS&E

The Plans, Specifications and Estimate to be used by contractors to bid on construction proposals

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 72

MVMPO List of Commonly Used Acronyms (Cont.)

R

RGGI

Regional Greenhouse Gas Initiative

ROW

Right-of-Way

RPA

Regional Planning Agency

RPMS

Regional Pavement Management System

RTA

Regional Transit Authority

RTP

Regional Transportation Plan

S

SAFETEA-LU

Safe, Accountable, Flexible, Efficient Transporta- tion Equity Act: A Legacy for Users

SB

Southbound

SD

Structurally Deficient

SGR

State of Good Repair

SIP

State (Air Quality) Implementation Plan

SOV

Single Occupancy Vehicle

SPR

Statewide Planning and Research Funds

STBG

Surface Transportation Block Grant Program

STIP

Statewide Transportation Improvement Program

STP

Surface Transportation Program

T

TA

Transportation Alternatives

TAM

Transit Asset Management

TAP

Transportation Alternatives Program

TCSP

Transportation and Community System Preserva- tion Grant Program

TDM

Transportation Demand Management

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 73

MVMPO List of Commonly Used Acronyms (Cont.)

T (Con.)

TEA-21

Transportation Equity Act for the 21st Century

TEC

Transportation Project Evaluation Criteria

TERM score

Transit Economic Requirements Model score used to rate transit facility conditions

TIP

Transportation Improvement Program

TMA

Transportation Management Area

TMC

Turning Movement Count

TOD

Transit-Oriented Development

TRB

Transportation Research Board

U

ULB

Useful Life Benchmark

UPWP

Unified Planning Work Program

USDOT

U.S. Department of Transportation

V

V/C

Volume/Capacity Ratio

VMT

Vehicle Miles Traveled

VOC

Volatile Organic Compound

W

WB

Westbound

Massachusetts Executive Orders

EO

526

Nondiscrimination, Diversity, Equal Employment

Opportunity and Affirmative Action

EO

12898

Environmental Justice in Minority and Low-Income

Populations, February 1994

EO

13166

Improving Access to Programs (and Services) for

persons with limited English Proficiency

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 74

Page intentionally left blank.

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 75

Appendix H Key to Maps Showing Locations of Transportation Projects

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 76

Appendix H Key to Maps Showing Locations of Transportation Projects

Map

Number

Project Num- ber

City/Town

Project Description

1

611977

Amesbury

Amesbury– Riverwalk Connector to the

Salisbury Point Ghost Trail

2

612193

Andover

Andover- Bridge Preservation, A-09-022, I-

93 over Merrimack River

3

606522

Andover

Andover- Bridge Rehabilitation, A-09-036,

I-495 over St 28 (SB), A-09-037, I-495 over

B&M and MBTA, A-09-041, I-495 over St

28 (NB)

4

612143

Andover

Andover– Bridge Replacement, A-09-015, Tewksbury Street over MBTA/BMRR

5

612045

Andover- Tewksbury

Andover-Tewksbury- Interstate

Maintenance and related work on I-93

6

607541

Georgetown- Boxford

Georgetown– Boxford Border to Boston Trail from Georgetown Road to West Main Street (Route 97)

6

607542

Georgetown- Newbury

Georgetown– Newbury Border to Boston Trail (Northern Georgetown to Byfield Section)

7

S12208

Groveland

Groveland- Improvements at Dr. Elmer

Bagnall Elementary School

8

605304

Haverhill

Haverhill- Bridge Replacement, H-12-007 & H-12-025, Bridge Street (SR 125) over Merrimack River and the Abandoned B&M RR (Proposed Bikeway)

9

609466

Haverhill

Haverhill– Bridge Replacement, H-12-040, I-495 (NB & SB) over Merrimack River

10

608788

Haverhill

Haverhill– Roadway Reconstruction on

North Avenue, from Main Street (Route

125) to Plaistow, NH

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 77

Appendix H Key to Maps Showing Locations of Transportation Projects

(Continued)

Map

Number

Project

Number

City/Town

Project Description

11

612074

Lawrence

Lawrence– Bridge Replacement, L-04-012, Short Street over Spicket River

12

612002

Lawrence

Lawrence– Community Day Arlington

Improvements (SRTS)

11

608930

Lawrence

Lawrence- Lawrence Manchester Rail

Corridor (LMRC) Rail Trail

11

610924

Lawrence

Lawrence– Roadway Reconstruction on

Amesbury Street

13

612158

Methuen

Methuen- Bridge Replacement, M-17-026, Route 213 EB/WB over the Methuen Rail Trail

2

610658

Methuen

Methuen– Intersection Improvements at

Riverside Drive and Burnham Road

8

MVRTA-1

MVRTA

MVRTA- New facility and/or division gargage in Bradford

11

MVRTA- 2

MVRTA

MVRTA- McGovern Transportation Center upgrades

14

608029

Newburyport

Newburyport– Intersection Improvements

@ Route 1 & Merrimac Street

3

608095

North

Andover

North Andover- Corridor Improvements on Route 114, between Waverly Road & Willow/Mill Street

15

609392

Rowley

Rowley– Safety Improvements at Route 1, Central and Glen Streets

1

602202

Salisbury

Salisbury– Reconstruction of Route 1 (Lafayette Road)

Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 78
Draft FFYs 2023-2027 MVMPO TIP Appendix April 2022 Appendix 79